John Street RFP Responses Design Presentation Design Presentation April 2013 April 2013 a t t a n B r i d g e JOHN STREET DEVELOPMENT SITE BROOKLYN JOHN STREET B r o o k l y n B r i d g e BRIDGE PARK MAIN STREET EMPIRE FULTON FERRY OPEN


  1. John Street RFP Responses Design Presentation Design Presentation April 2013 April 2013

  2. a t t a n B r i d g e JOHN STREET DEVELOPMENT SITE BROOKLYN JOHN STREET B r o o k l y n B r i d g e BRIDGE PARK MAIN STREET EMPIRE FULTON FERRY OPEN Plymouth Street OPEN W M BROOKLYN a J a s a i h BRIDGE PLAZA n o y c c a Empire Stores b o T i n S S g e s u o h t e t a r W t r r o e e n e e t t Water Street S t r e e Y o r k t S t r e e t DUMBO F B25 PIER 1 OPEN Old Fulton Street Pier 1 Development BQE Sites B69 Squibb Park H i g h & Bridge S t r e e t A C H i g h S t r e e t s t h A C g i e PIER 2 H R a i b E m u V l o C I t e e e d R r a t S n e C l a r k S t r e e t n m T a 2 3 o m r PIER 3 S P r u F s A t h BROOKLYN g E i e H HEIGHTS n y l k PIER 4 o o r B DOWNTOWN Interim BROOKLYN Greenway M o n t a g u e S t r e e t MONTAGUE ST COMMERCIAL CORRIDOR R C o u r t S t r e e t PIER 5 OPEN 2 3 B o r o u g h H a l l Joraleman Street 4 5 PIER 6 Pier 6 OPEN Development Sites Atlantic Avenue B63 ATLANTIC AVE COMMERCIAL t e e r t S CORRIDOR a i COBBLE HILL b m u l o C

  3. John Street site description • Located on vacant lot just east of Manhattan Bridge Located on vacant lot just east of Manhattan Bridge • Site is 130’ by 74’ with footprint of 9,600 sq. ft. • Development controls: D l t t l o Up to 130 residential units comprising 101,000 sq. ft. of residential space o Ground floor retail and up to 110 parking spaces o Maximum height of 130 ft.

  4. John Street Park Illustrative Plan Illustrative Plan 10 Jay Street John Street (Existing) development site

  5. RFP goals RFP goals • Enliven northern entrance of the Park • Create a high-quality, visually appealing residential development • Seamlessly integrate with the Park and surrounding community • Generate revenue to support the maintenance and operation of the Park • Achieve LEED certification

  6. J h John Street RFP Timeline St t RFP Ti li • November 05, 2012: Received feedback from Committee on Design/Const. • December 17, 2012: Release of Request for Proposals (RFP) • January 23, 2013: Information session and site visit (90 attendees) • March 11, 2013: Submissions due (11 proposals received) • May 28, 2013: Presentation to the CAC • June 28, 2013: Design feedback provided by CAC • Summer 2013: Select winning respondent

  7. Team 1 Team 1 Brooklyn Bridge Park John Street RFP John Street RFP

  8. 2 PROJEcT DEScRIPTION View facing West

  9. F View facing South

  10. GYM RETAIL 1,150 SF MECHANICAL 680 SF RESIDENTIAL LOBBY 520 SF RESTAURANT TERRACE RETAIL CAR 1,000 SF HOIST CAFE 915 SF ENTRANCE SCALE: 3/32” = 1’-0” Ground floor plan

  11. View facing east

  12. Team 2 Team 2 Brooklyn Bridge Park John Street RFP John Street RFP

  13. View facing east

  14. View facing east

  15. “CASSETTE” “CASSETTE” 3 BR 1 BR RETAIL OPEN TO BELOW DINING RETAIL MEZZANINE OPEN TO BELOW LOBBY PARKING RETAIL loBBy (+7’ / aT graDe) PoDium (+13’ / From Sea level) mezzaNiNe (+21’) Ground floor plan

  16. View facing northwest

  17. View facing west

  18. View facing east

  19. Team 3 Team 3 Brooklyn Bridge Park John Street RFP John Street RFP

  20. View facing southwest

  21. View facing east

  22. Ground floor plan

  23. View facing north

  24. Team 4 Team 4 Brooklyn Bridge Park John Street RFP John Street RFP

  25. View facing southeast

  26. View facing east

  27. Ground floor plan

  28. View facing south

  29. Team 5 Team 5 Brooklyn Bridge Park John Street RFP John Street RFP

  30. View facing south

  31. View facing northwest

  32. South facade detail

  33. East facade detail

  34. Ground floor plan

  35. Team 6 Team 6 Brooklyn Bridge Park John Street RFP John Street RFP

  36. View facing southeast

  37. View facing northwest

  38. Facade joint detail

  39. Ground floor plan

  40. View facing south

  41. Team 7 Team 7 Brooklyn Bridge Park John Street RFP John Street RFP

  42. View facing south

  43. View facing east

  44. PARK SERVICES BIKES LEASING & MGMT RESIDENTIAL BLDG RETAIL SERVICES LOBBY (+5') BLDG SERVICES PEARL STREET MAIL SERVICES REFUSE RETAIL POP UP RETAIL FARM SHOP R A M U P P JOHN STREET Ground floor plan

  45. View facing northeast

  46. Team 8 Team 8 Brooklyn Bridge Park John Street RFP John Street RFP

  47. View facing northeast

  48. GGP-TA John Street LLC RiverPark Facade detail

  49. Terrace R a m p Retail 1 : 1 2 Mechanical/ Storage Shed Retail Service Pets Mail Lobby RESIDENTIAL UNITS COMMON SPACE AMENITIES RETAIL TERRACE SUPPORT/MECHANICAL Ramp 1:20 Ground floor plan

  50. View facing northwest

  51. Team 9 Team 9 Brooklyn Bridge Park John Street RFP John Street RFP

  52. View facing southeast

  53. View facing northwest

  54. View facing south

  55. BROOKLYN BRIDGE PARK BROOKLYN BRIDGE PARK Retail Space (6160 sf) JOHN STREET EAST RIVER  EAST RIVER  Service Entry Residential Mechanical Lobby and Storage Blg Con- Pkg. Mail Service ierge Rm. Services PEARL STREET PEARL STREET Ground floor plan (DEMAPPED) (DEMAPPED)

  56. Team 10 Team 10 Brooklyn Bridge Park John Street RFP John Street RFP

  57. View facing northeast

  58. View facing southeast

  59. ������ ������ ��������� ������������ ������� ���� ������� ������ ������ ����� ������� ������� Ground floor plan

  60. View facing north

  61. Team 11 Team 11 Brooklyn Bridge Park John Street RFP John Street RFP

  62. View facing south

  63. View facing southeast

  64. NEW RETAINING WALL OUTDOOR STAGE INDOOR STAGE PARK UTILITY (TBD) BOH AMENITY (+0’-0”) (+5’-6”) RETAIL MECHANICAL (+0’-0”) (+9’-6”) RETAIL DROP OFF (+8’-6”) (+0’-0”) LOBBY (+5’-6”) ADA Ground floor plan

  65. View facing northwest

  66. View facing east

  67. N Next steps t t • June 05, 2013: Workshop with CAC Design Committee • June 28, 2013: Design feedback provided by CAC • Summer 2013: Select winning respondent