integrated
play

INTEGRATED OPERATIONS via Pl System Presented by Mohd Haris - PowerPoint PPT Presentation

Reimagining the Journey of INTEGRATED OPERATIONS via Pl System Presented by Mohd Haris Shukri Business Challenge Many assets that are working in silo mode No transparency and visibility of real time data Wasted opportunity of to


  1. Reimagining the Journey of INTEGRATED OPERATIONS via Pl System Presented by Mohd Haris Shukri

  2. Business Challenge • Many assets that are working in silo mode • No transparency and visibility of real time data • Wasted opportunity of to allow a maximized data usage for analysis, planning and optimization • Lacking of data integration, where there is no real capability of information to be brought up to the next level of hierarchy, which is allowing other systems to consume and use the collected data 2

  3. Background • Major oil and gas company that have installations and productions around the globe • Many assets that are either having a silo or no real time data historian • A lot of planning, decision making and analysis are using offline data, based on chains of reporting practice 3

  4. Objectives • To have a centralized PI System, where all real time data are available at different layers and areas • To break down the operation silos • To support and provide information for integration operation, such as supporting knowledge management, provide data capability for collaborative work environment, cross discipline cooperation • To allow full consummation of data by decision making, analysis, planning and optimization tools 4

  5. Overview • Product Agnostic domain consultants across O&G and petrochemicals Industry • Customer requirements analysis and best fit consultants recommendation • PI customizations and solutions • Deep understanding of PI benefits Architecture (PI solutions and value and pitfalls adds) • Complex PI implementation architecture • Implementation services • Support Services PI Implementation and support team • Re implementation services • PI Training facility OSI PI CoE • PoC centre 5

  6. Framework PI Optimization Consultancy Visualization Support Management Value Added Implementation and Analytic Report Centralized PI Value Engineering Automation Support KPI Dashboard User Assessment Study and Design Solutioning Integration Management Calculation Remote Support Engine PI Solutioning End to End Process Display Design Implementation and Visualization Point Management Central Alert and Site Support Notification Governance and IT Assets Report Real Time Data Best Practice Delivery Generation Factory Asset Product Upgrade Categorization PI Records and Inventories Technology Enhancements Information on Roadmapping and Upgrades the Web Process Data System Health Analysis Monitoring Backup, Integrity Technical and Primary Data Derived Data Information on Periodical and Recovery Business Gap Quality Analysis Quality Analysis Mobile Evaluation and Analysis and Assurance and Assurance Audit 6

  7. Architecture 7

  8. Central PI Server (HA) PI ACE RTWebParts and Mobile PI PSA 3 rd party apps Regional PI Server (HA) Regional PI ACE Plant PI Server (with optional HA) Control system network Interface Nodes Control Systems 8

  9. Roadmap 3 pilot asset, establishment of central PI system, central KPI dashboard 10+ assets and establishment of regional PI system 10+ assets and establishment of centralized support model 10+ assets and pilots of automation of calculations and reporting initiative 10+ assets and several pilot IO collaborative work 9

  10. Maturity Steps 10

  11. PI System Components 11

  12. Usage Example Process Data Drilling Data Equipment Video Feed Information Engineering Well Data Documents Better Visibility and Decision Making!! 12

  13. Usage Example + Real Time Data and Asset Management and Asset Framework Maintenance = Predictive Asset Maintenance 13

  14. Usage Example Trending of main equipment Critical Operating Limit (COL) Alert on any COL excursion for the day using conditioning feature of Excel PI Data Link 14

  15. Usage Example + Onshore – offshore Process Graphics and Trends collaboration meeting = Collaborative Work Environment 15

  16. Mohd Haris Shukri bin Jahabar Solution Architect 16

Recommend


More recommend