Hillside Elementary HOH BOARD PRESENTATION 12.16.19 ORIGINAL BOND RENDERING PRE VOTE JAN 2019 Hillside Elementary MUSIC EXISTING STORAGE EXISTING LESSONS BUILDING 255 SF BUILDING CLASSROOM CLASSROOM CLASSROOM CLASSROOM 504 SF NOT


  1. Hillside Elementary HOH BOARD PRESENTATION 12.16.19

  2. ORIGINAL BOND RENDERING PRE VOTE JAN 2019 Hillside Elementary

  3. MUSIC EXISTING STORAGE EXISTING LESSONS BUILDING 255 SF BUILDING CLASSROOM CLASSROOM CLASSROOM CLASSROOM 504 SF NOT IN NOT IN 932 SF 932 SF 8 1 5 SF 8 01 SF SCOPE SCOPE UP UP UP DN DN NEW ADDITION ABOVE KITCHEN ENL 642 SF 30 6 SF CAFETORIUM 4,310 SF BASEMENT FLOOR PLAN LEGEND: EXISTING BUILDING NOT IN SCOPE AREA OF ADDITION STAGE 1ST FLOOR = 9,340 SF 1, 76 6 SF BASEMENT = 3,082 SF TOTAL = 12,422 SF RENOVATED AREA 1ST FLOOR = 1,276 SF BASEMENT = 304 SF TOTAL = 1,580 SF 1ST FLOOR PLAN ORIGINAL BOND AREA PLANS SCALE: 1/16" = 1'-0" As indicated PRE VOTE JAN 2019 Hillside Elementary

  4. Hillside Elementary PBDW SHEMATIC DESIGN AUGUST 2019

  5. PROGRAM SPACES AREA - MIN. SF SUPPORT SPACES AREA - SF 300 sf TOILETS CAFETORIUM 4,200 sf For Cafeteria/Auditorium capacity Cafeteria use: 240 - 280 people Lunch period for two full grade levels 240 sf TABLE STORAGE Auditorium use : 540 - 600 people For cafeteria tables when in Auditorium use STAGE 800 + sf 60-100 students 450 sf RETRACTABLE SEATING Significantly larger than existing stage 550sf For ease of set up and flex use KITCHEN 650 + sf 60 sf ELEVATOR Cooking kitchen for food service capacity For handicap access to basement level CLASSROOMS (4 total; 22-24 students ea) 900 + sf ea 300 sf EGRESS STAIR 2x Kindergarten classrooms on main level (exist. Kindergarten 1,000+sf) For access between floors 2x Second grade classrooms on lower level (existing Second grade 900+sf) 800 sf FACILITIES STORAGE MUSIC LESSONS 300 + sf ea For general Hillside facilities use 2x individual and small group music lessons (13 students) KITCHEN STORAGE 100 sf RESOURCE ROOM 300 + sf For dry food supplies 5 students Specialized instruction area for limited class time 60 + sf DATA ROOM For Auditorium equipment 300 + sf MECHANICAL/PLUMBING AREAS Hydronic heat pumps Water heater for kitchen use PROGRAMMING Hillside Elementary

  6. CLASSROOM SIZES ARE 900SF+ TO MEET MIN. CODE REQUIREMENTS FOR CLASSROOM SIZES ARE 900SF KINDERGARTEN USE. TO MATCH EXISTING CLASSROOM SIZE AT BASEMENT EXISTING EXISTING CLASSROOM CLASSROOM BUILDING CLASSROOM CLASSROOM BUILDING LEVEL. NOT IN NOT IN 91 9 SF 9 20 SF 921 SF 923 SF THE NEW STAIR IS PULLED OUT OF THE SCOPE SCOPE CORRIDOR SPACE TO ALLOW FOR A EXTENT OF DN UP CONNECTION TO ANY POTENTIAL BOND PLAN FUTURE EXTENSION. STAIR STAIR 315 SF 209 SF CORRIDOR CORRIDOR CORRIDOR CORRIDOR ADEQUATE BATHROOM SPACE ELEV ELEV. FOR THE AUDITORIUM AND CAFETERIA USE. KITCHEN DATA MECH & PLUMB 651 SF GREEN ROOM/ RESOURCE 67 SF 292 SF STORAGE BASEMENT STORAGE/ MECHANICAL MUSIC LESSONS ROOM 790 SF 365 SF 383 SF AREA UNDER THE KITCHEN IS A STORAGE BACKSTAGE RESULT OF CAPTURING SPACE DUE 242 SF STORAGE FOR FOLDED 3 5 1 SF TO THE NATURAL GRADE CHANGE. CAFETERIA TABLES TO MEET FLEXIBLE CAFETORIUM PROGRAM USE. STAGE 868 SF BASEMENT FLOOR PLAN LEGEND: CAFETORIUM 43 1 0 SF RETRACTABLE SEATING STORAGE TO EXISTING BUILDING NOT IN SCOPE MEET FLEXIBLE CAFETORIUM PROGRAM USE. ENTRY AREA OF BOND ADDITION = 12,422 SF 300 SF INCRESED AREA FROM BOND NEW TOTAL AREA OF ADDITION SEAT STORAGE 448 SF 1ST FLOOR = 1,500 SF 1ST FLOOR = 10,840 SF BASEMENT = 1,245 SF BASEMENT = 4,335 SF TOTAL = 2,745 SF TOTAL = 15,175 SF NEW ENTRY VESTIBULE FOR EVENING EVENTS ALLOWS RENOVATED AREA OVER BOND BY 2,753 SF FOR STAGE CONNECTION INCRESED SCOPE FROM BOND: BACK TO EXISTING BUILDING. BAY WINDOW - KINDERGARDEN SIZE CLASSROOMS 195 SF - BATHROOMS FOR AUDITORIUM - SEAT & TABLE STORAGE AREAS - NEW ENTRY NOTE: 1ST FLOOR PLAN - STAIR TO ALLOW FOR CONNECTION BAY WINDOW ALLOWS FOR GLAZING OVERALL AREAS LISTED IN GROSS SF TO FUTURE EXPANSION CONNECTION TO EXISTING - DESIGN DEVELOPMENT FOR MEP PROGRAM AREAS LISTED IN NET SF PLAYGROUND AREAS. CURRENT PROPOSED AREA PLANS SCALE: 1/16" = 1'-0" As indicated 10. 21 .19 Hillside Elementary MARK-UP 12.16.19

  7. CLASSROOM SIZES ARE 100SF SMALLER STAIR FOOTPRINT WOULD SMALLER THAN EXISTING REQUIRE DEMOLITION AND CLASSROOM EXISTING EXISTING CLASSROOM CLASSROOM BUILDING CLASSROOM BUILDING 800 SF 1ST/2ND GRADE CLASSROOMS. REPLACEMENT OF STAIR TOWER FOR NOT IN NOT IN 91 9 SF 9 20 SF 802 SF SCOPE STAIR SCOPE DOES NOT MEET PROGRAM. FUTURE ADDITION. 163 SF DN UP PLUMB MECH MECHANICAL AND PLUMBING STAIR 62 SF 150 SF SPACE IS UNDERSIZED FOR THE BUILDING NEEDS. COMPRESSED KITCHEN LOCATION CORRIDOR CORRIDOR CORRIDOR CORRIDOR RESULTS IN A CONGESTED FOOD SERVICE AREA WILL LOOSE ONE ROW OF TABLES ELEV ELEV. FOR REQUIRED CIRCULATION. SEATING CAPACITY WILL DROP DATA KITCHEN GREEN ROOM/ RESOURCE UNDER 280 STUDENTS. 67 SF 648 SF AREA BELOW KITCHEN IS A MUSIC LESSONS ROOM DOES NOT MEET PROGRAM. 365 SF 383 SF RESULT OF THE NATURAL X BACKSTAGE GRADE CHANGE. THIS AREA STORAGE 381 SF WILL NEED TO BE BACKFILLED IF CORNER BAY WINDOW CAN BE NOT BUILT OUT. X STAGE REMOVED. WE HAVE 746 SF INCORPORATED THIS CHANGE INTO THE NEXT ROUND OF DRAWINGS. X BASEMENT FLOOR PLAN CAFETORIUM LEGEND: 4148 SF COMPRESSED SEAT STORAGE NOTE THAT THE REDUCED SQUARE PUSHES THE OPEN SEATBANK OUT TO FOOTAGE ON THE FIRST FLOOR IS ENTRY EXISTING BUILDING NOT IN SCOPE A CLOSE DISTANCE (6'-0") 262 SF ONLY 620 SF, WHICH WILL RESULT IN TO THE STAGE, AND WILL BLOCK A VERY TIGHT FOOTPRINT AND AREA OF BOND ADDITION = 12,422 SF CIRCULATION TO THE BAY WINDOW. MINIMAL COST SAVINGS. DECREASED AREA FROM SD NEW TOTAL AREA OF ADDITION SEAT STORAGE THE BULK OF THE SQUARE FOOTAGE 1ST FLOOR = 620 SF 1ST FLOOR = 10,230 SF IS BASEMENT SPACE THAT WILL BASEMENT = 1,290 SF BASEMENT = 2,976 SF REQUIRE ADDITIONAL COST TO TOTAL REDUCTION = 1,910 SF TOTAL = 13,206 SF BACKFILL IF NOT BUILT OUT. SMALLER ENTRY VESTIBLUE PUSHES RENOVATED AREA OVER BOND BY 784 SF STAGE BACK REDUCING STAGE SIZE BY 100SF: DOES NOT MEET PROGRAM NOTE THE PROPOSED PLAN ACCOUNTS FOR DECRESED SCOPE FROM SD: REQUIREMENTS OF OVER 800SF STAGE. ADEQUATE BATHROOM SPACE FOR THE AUDITORIUM AND CAFETERIA USE, NOT - SMALLER STAGE AREA PREVIOUSLY PLANNED FOR IN THE BOND SF. - NO GLAZING CORNER TO WOODS 1ST FLOOR PLAN - SMALLER CLASSROOMS AT BASEMENT NOTE: - NO BONUS STORAGE SPACE OVERALL AREAS LISTED IN GROSS SF - STAIR ADJUSTMENT REQUIRED FOR FUTURE EXPANSION PROGRAM AREAS LISTED IN NET SF REDUCED AREA PLANS SCALE: 1/16" = 1'-0" As indicated 10. 21 .19 Hillside Elementary MARK-UP 12.16.19