dgs central utility plant sacramento ca
play

DGS Central Utility Plant Sacramento, CA South Elevation 24 0 72 - PowerPoint PPT Presentation

DGS Central Utility Plant Sacramento, CA South Elevation 24 0 72 48 Site Plan Boilers Boilers Steam Control Turbine Generator Pumps Open Open Staff Chillers to to Staff & Above Below & Support Support


  1. DGS Central Utility Plant Sacramento, CA South Elevation

  2. 24 0 72 48 Site Plan

  3. Boilers Boilers Steam Control Turbine Generator Pumps Open Open Staff Chillers to to Staff & Above Below & Support Support Administration/ Entry Electrical Administration 1 ST FLOOR 2 ND FLOOR Floor Plan

  4. Residential Residential Office Warehouse Office Residential Vicinity Plan

  5. West Elevation – Highly Articulated for Civic Presence

  6. North Elevation – Thermal Energy Storage (TES) Tank in Background

  7. Exterior from Southwest

  8. Boiler Room Equipment

  9. Chillers and VFD’s at First Floor – Pumps and Control Room on Second Floor

  10. Pumps and Piping on Second Floor

  11. TES Tank & Splash

  12. Details

  13. Sustainability Features

Recommend


More recommend