community meeting
play

Community Meeting 30 March 2016 Stormwater Connection Improved - PowerPoint PPT Presentation

Tullamarine Landfill Community Meeting 30 March 2016 Stormwater Connection Improved Design Landscaped Channel No Pipe Concrete Pits and Pipes Amended Landscaped Channel Weir Landscaped Channel Road Crossing Instead of Concrete Pipe.


  1. Tullamarine Landfill Community Meeting 30 March 2016

  2. Stormwater Connection – Improved Design Landscaped Channel No Pipe Concrete Pits and Pipes Amended Landscaped Channel Weir Landscaped Channel Road Crossing Instead of Concrete Pipe.

  3. Stormwater Connection Improvements in Design  Increased frog habitat area  Less concrete  Softer Landscaping approach  Less likelihood of erosion  Improved water quality  Increased safety

  4. Groundwater Update  Currently Updating the Management and Monitoring Plan  Information on current monitoring frequency will be provided with Technical Review information  TECHNICAL REVIEW  Currently with the Auditor  The Technical Review Report will be ready for the community by end of April  Monitoring & Management Plan, including contingency requirements, will be included  Upon receipt of final report, welcome a special briefing session with community before next meeting

  5. New Landfill Gas Perimeter Boreholes Proposed Locations On Airport Land Prepared by Cardno Lane Piper for Cleanaway

  6. New Groundwater Monitoring Boreholes Proposed Proposed Locations Locations Non regulatory requirement

  7. Air Quality Testing Update  Flare sampling for methane destruction efficiency will take place in April 2016.  A second full emissions test is to be completed after methane testing is undertaken during May/June when climate conditions are colder.  Ambient air monitoring design and procedure being developed by our experts. This will be ready in June.  Ambient air monitoring will be undertaken concurrently with next emissions testing in second half of 2016.

  8. Flare Sampling Equipment - Calibrated In-Situ Equipment Methane (CH 4 ), Temp, Pressure, Flow

  9. Flare Equipment - New Sample Location

  10. Outlet Sample Flare Equipment Point Sample Canister for Laboratory Inlet Sample Point Methane Water Knock Detector Out Pot Calibrated Data Blower Sample Collection Canister for System Laboratory Flow Temperature Combustion Methane % Air Inlet Landfill Gas Inlet

Recommend


More recommend