APPENDIX G: Meeting Materials Presentation Boards November 16, - PDF document

APPENDIX G: Meeting Materials Presentation Boards November 16, 2016 45 Welcome! PURPOSE OF TODAYS MEETING To obtain public input


  1. APPENDIX G: Meeting Materials Presentation Boards November 16, 2016 45

  2. ����������������������������������� Welcome! PURPOSE OF TODAY฀S MEETING � To obtain public input on preliminary design plans for the Loop 202 (South Mountain Freeway) Project � Not to debate project alignment and “build or no build” options AGENDA 6 - 6:30 p.m. Visit information stations and speak one-on-one with project representatives 6:30 - 7:30 p.m. Formal presentation followed by brief Q&A 7:30 - 8 p.m. Visit information stations and speak one-on-one with project representatives YOUR INPUT IS IMPORTANT TO US! � Submit your comments at today’s meeting � Speak to project representatives in person � Write your comments on the forms provided and hand them to a project team member � Send us your comments � Email: southmountainfreewayinfo@c202p.com � Project website: southmountainfreeway.com � Mail your comments to us at the following address � South Mountain Freeway Project Team; 411 N. Roosevelt Ave. Chandler, AZ 85226 � Call us at the project hotline: � 1.855.SMF.L202 (1.855.SMF.L202) / Para español: 623.239.4558 November 16, 2016 46

  3. Construction Se gments and Schedule 75th Ave. 67th Ave. 59th Ave. 51st Ave. 43rd Ave. SR 17 51 LEGEND 10 SR 202L Alignment Roosevelt South Mountain Freeway Van Buren Interchange Locations Downtown I-10 Papago 10 UPRR Phoenix Gila River Indian Community Segment Buckeye Rd. RID Canal 17 Lower Buckeye Rd. Elwood 10 Broadway Rd. r i v e R S a l t Phoenix Southern Ave. Salt River 60 Segment Baseline Rd. LACC Dobbins Rd. Elliot Rd. South Mountain Park Estrella Dr. Center Pecos 51st Ave. Segment Segment 10 Ivanhoe St. Gila River Indian Community LOOP 202 Desert Foothills 17th Ave. Pkwy. 24th St. 32nd St. 40th St. 2016 2017 2018 2019 WINTER SPRING SUMMER FALL WINTER SPRING SUMMER FALL WINTER SPRING SUMMER FALL WINTER SPRING SUMMER FALL PROJECT SCHEDULE OVERVIEW Design Phase and Preconstruction Activities Utility Relocation Construction Phase* PUBLIC INVOLVEMENT OPPORTUNITIES* Public Meetings to Obtain Input Pecos, Salt River Center on Preliminary Design Plans and I-10 Segments Segment Public Meetings to Share Final Plans, Present Pecos, Salt River Center Construction Information and and I-10 Segments Segment Introduce Construction Managers *Notes: 1. Preliminary Schedule ฀ Subject to Change. 2. Due to the nature of the design-build project delivery method being used for the South Mountain Freeway Project and the fact that it is a 22-mile project, construction activities will occur in multiple locations within each construction segment during the construction phase. November 16, 2016 47

  4. Landscaping and Aesthetic Design Concepts Five Different Character Areas for Landscape Architectural Design Five Unique Aesthetic Areas November 16, 2016 48

  5. Landscape and Aesthetics Noise Right-of-Way Diverging Diamond Interchange ADOT Title VI Notice November 16, 2016 49

  6. APPENDIX H: Preliminary Design Public Input Meetings Presentation November 16, 2016 50