AMPO Conference, October 2017 Dave Hutchinson, Executive Director
1. I T ’ S THE LAW SO WE HAVE TO
1. I T ’ S THE LAW SO WE HAVE TO
2. M AKE IT ABOUT MONEY Performance Measures Invest resources in IMPLEMENTATION projects cts to achieve Reviewed 2040 Long Range Transportation individual Plan Goals targets ts Collected and analyzed consistent, readily that collectively available data will make progress Aligned MPO project prioritization with toward national mandated performance measures goals ls . Implemented new scoring criteria with 2017 call for projects
2. M AKE IT ABOUT MONEY SAFETY/SECURITY: High Crash Location Evacuation Route INFRASTRUCTURE CONDITION: Fair MOBILITY/CONGESTION/RELIABILITY: Low Reliability High Congestion Desoto Bridge ECONOMY/FREIGHT: $7.5 Million High Truck Volume Major Commuter Route for PD&E ENVIRONMENT/LIVABILITY: No Pedestrian/Bike Facilities
3. I T ’ S A CHANCE TO CHANGE FOR THE BETTER Spec ecia ial l Flood od Hazar zard d Area ea INFRASTRUCTURE CONDITION stat ate e of good repair air RESILI SILIENC NCY: Impr prove ve the e resili siliency ency and nd reli liabili bility ty of the trans anspor ortati ation on sys ystem tem and nd redu duce ce or mitiga tigate te stormw rmwater ter impacts pacts of surface ace trans anspor ortati ation on. FA FAST T Act
4. T AKE YOUR TIME AND TELL THE STORY Flori rida a Top 20 Coun unti ties es Pedestr estrian ian and nd Bicy cycle cle Injur juries es and nd Death aths MAP 21 / FAST Act SAFETY AND SECURITY Significant reduc ucti tion on in traf affic ic fatali lities ties and nd seriou rious s injuri uries es on all public roads #10 10 Most t danger angerous ous metro o area ea for wa walki lking g in the e Uni nited ted St States tes Dan ange gerou ous s by Design ign 2016
4. T AKE YOUR TIME AND TELL THE STORY 8
4. T AKE YOUR TIME AND TELL THE STORY SAFETY TARGETS: Safety Audits Number of fatalities Rate of fatalities $116,000 for Planning Number of serious injuries Rate of serious injuries Number of non-motorized fatalities and non-motorized serious injuries
4. T AKE YOUR TIME AND TELL THE STORY Performance Measures TIMELINE 2017-2018 2017-2018 Februar ruary 27, 2018 18 Safety, Security Performance Measure Targets 2018 Novemb ember er 16, 2018 18 Infrastructure, Freight, Mobility, Congestion, Reliability Performance Measure Targets
5. B E THE BROKEN RECORD . B E THE BROKEN RECORD . MAP-21 MA 21 (2012) 2) Mov oving ing Ahe head ad fo for Progress ss in the 21 21st t Centu tury y Act FAS AST Act ct (2015) 5) Fixing America’s Surface Transportation Act Inv nves est resources rces in projec ects ts to to achieve e indiv ividu idual al targ rgets ets th that collecti ectivel ely y will make e progress ess to toward national onal goals .
5. B E THE BROKEN RECORD . B E THE BROKEN RECORD . In Invest t re resour ources ces in n pr proje jects cts to ac achi hieve ve ind ndividua idual l tar argets gets Th That at coll llectiv ctively ely will l make ake pr progress ress towar ard d na nati tional nal goal als .
6. B ORROW FROM THE BEST 2015 AMPO Annual Conference Performance-Based Planning Weighting Performance Measures as a Method to Refine Project Evaluation October 21, 2015 Chattanooga-Hamilton County/N. GA Transportation Planning Organization
6. B ORROW FROM THE BEST Chattanooga-Hamilton County/N. GA Transportation Planning Organization
7. D IG FOR DATA 2015 Na Nati tiona onal l Bridge idge Inventor entory • Re Read adil ily y avai availa labl ble • Ea Easily y un unde derstood tood • Gener neral ally ly ac accepted epted • Cons nsis istent tent ac across ss jur urisd sdic iction tions • Sup uppl plem ement ntal al to re requ quired red da datas asets ts
8. S EEK OUT NEW STAKEHOLDERS
9. COMMITTEES ARE KEY • TEC ECHNI HNICAL AL ADVISO VISORY RY COMMITTEE MITTEE WO WORKSH RKSHOPS PS • BO BOARD ARD SUB UB-COMM COMMIT ITTEE TEE
10. EXPERTS ARE ALWAYS FROM OUT OF TOWN
Recommend
More recommend