2016 adopted hike bike plan
play

2016 Adopted Hike & Bike Plan Target Audience 8 to 80 Context - PowerPoint PPT Presentation

Active Transportation Initiatives 2017 Public Hearing on Active Transportation Matt Dawson-Mathur, P.E. April 19, 2017 2016 Adopted Hike & Bike Plan Target Audience 8 to 80 Context Sensitive Designs Connect Regional Points


  1. Active Transportation Initiatives 2017 Public Hearing on Active Transportation Matt Dawson-Mathur, P.E. April 19, 2017

  2. 2016 Adopted Hike & Bike Plan • Target Audience “8 to 80” • Context Sensitive Designs • Connect Regional Points of Interest • Texas A&M University • Blinn College • Downtown Bryan • Schools • Parks • Trails

  3. 2015 Transportation Alternatives Program (TAP) 1. South College Avenue Phase 1 (FY18 Construction) 2. FM 158 Safety Lighting (Under Construction) 3. Safe Routes to School East 29 th Street Shared 4. Use Path 5. South College Avenue Phase 2

  4. 2017 Transportation Alternatives (TA) Set-Aside Program 1. Coulter Drive Sidewalks and Bike Lanes a. S College Avenue to William J Bryan Parkway (FM 158) b. 6’ sidewalks and 5’ (min.) bike lanes c. Connections i. S College Ave Bike Lanes ii. Neighborhoods iii. Stephen F Austin Middle iv. St Joseph Catholic School v. Sue Haswell Park

  5. 2017 TA Set-Aside Program 2. Earl Rudder Freeway (SH 6) E Frontage Road Shared Use Path (SUP) a. Boonville Road (FM 158) to Old Reliance Road b. 12’ Separated SUP c. Connections i. FM 158 SUP ii. Kroger, etc. iii. Premier Cinema, etc. iv. Sam Rayburn Middle

  6. 2017 TA Set-Aside Program 3. Villa Maria Road (FM 158) Shared Use Path and Lighting a. Harvey Mitchell Parkway (FM 2818) to Riverside Parkway (SH 47) b. 12’ Separated SUP with Pedestrian Lighting c. Connections i. Wal-Mart, etc. ii. Neighborhoods iii. Parks/Trails iv. Branch Elementary v. Brazos Christian School vi. Future BISD School

  7. 2017 TA Set-Aside Program 4. Safe Routes to Schools Sidewalks a. Kemp, Sul Ross, and Johnson Elementary Schools b. 5’ and 6’ sidewalks

  8. Upcoming Projects • Separated Shared Use Path (MPO – FY20)  William J Bryan (FM 158) from SH 6 to Coulter Drive • Buffered Bike Lanes (HSIP – FY17)  Finfeather Road from Groesbeck Street to City Limits • Two Way Cycle Track (Unfunded)  Wellborn Road from Natalie Street to Tee Drive • Clay Street Extension (COB – FY17)  Bike Lane / SUP from Wellborn Road to College Main

Recommend


More recommend