WELCOME OLD CHENEY PAVEMENT REPAIR PROJECT | 40 th Street to Highway - PowerPoint PPT Presentation

WELCOME OLD CHENEY PAVEMENT REPAIR PROJECT | 40 th Street to Highway 2 NDOR Project LCLC 5202(9), CN 13315, City 540041 56 th ST 56 th ST OLD CHENEY RD OLD CHENEY RD OJECT | 40 th Street to Highway 2 OLD OLD CHEN CHENEY P EY PAVEMEN


  1. WELCOME OLD CHENEY PAVEMENT REPAIR PROJECT | 40 th Street to Highway 2 NDOR Project LCLC – 5202(9), CN 13315, City 540041 56 th ST 56 th ST OLD CHENEY RD OLD CHENEY RD OJECT | 40 th Street to Highway 2 OLD OLD CHEN CHENEY P EY PAVEMEN VEMENT REP REPAIR PR IR PROJECT NDOR Project LCLC – 5202(9), CN 13315, City 540041

  2. CONSTRUCTION CONSIDERATIONS PHASING/TRAFFIC CONTROL DAILY CONSTRUCTION TYPE OF CONCRETE • Maintain Traffic • Standard • 47B Standard Concrete (1 lane in each direction) ( 7 Day Cure Time) • Nighttime Only with Lane Closures • 47B-HE High Early Strength • 24 Hour • Head to Head Traffic ( 2- 3 Day Cure Time) • Total Closure with Detour • PR3 Pavement Repair ( 6 Hour Cure Time) OLD CHENEY PAVEMENT REPAIR PROJECT | 40 th Street to Highway 2 NDOR Project LCLC – 5202(9), CN 13315, City 540041

  3. ALTERNATIVES CONSIDERED Minimum Estimated Minimum Cost Scope of Work / Safety Duration Quality Relative to Type of Concrete Traffic Control / Access Standards Daily Construction (days) Standards Preferred 1 Repair w/ 47B Full Intersection Closure Exceeds Standard 24 Yes 93% 2 Repair w/47B-HE Full Intersection Closure Exceeds Standard 14 Yes 100% 3 Repair w/ PR3 Full Intersection Closure Meets Night Time Only 14 No 164% 4 Repair w/ 47B-HE Lane Closure Only Meets Standard 28 Yes 137% 5 Repair w/ PR3 Lane Closure Only Meets Night Time Only 24 No 218% 6 Full Reconstruction w/ 47B Full Intersection Closure Exceeds Standard 28 Yes 154% 7 Full Reconstruction w/ 47B-HE Full Intersection Closure Exceeds Standard 14 Yes 164% Preferred Not Viable OLD CHENEY PAVEMENT REPAIR PROJECT | 40 th Street to Highway 2 NDOR Project LCLC – 5202(9), CN 13315, City 540041

  4. N Preferred Alternative

  5. Proposed Detour Map

  6. COMMITMENTS TO MINIMIZE IMPACTS • Maintain Bicycle and Pedestrian Traffic • Maintain at Least One Access Point to All Businesses • Provide Temporary Median Breaks on 56 th Street • Include Contractor Incentive/Disincentive Compensation • Allow 24 Hour Construction (if requested by contractor) OLD CHENEY PAVEMENT REPAIR PROJECT | 40 th Street to Highway 2 NDOR Project LCLC – 5202(9), CN 13315, City 540041

  7. COPING WITH CONSTRUCTION Ac Access ss D Duri ring C ng Cons nstruction truction Clos Closur ures an and d De Detours Utilities ities Access ccess Af After C r Cons nstruction truction Ne New En Envir vironm nmen ent Tips and Tips and Ideas Ideas Advice and vice and Ex Expe perience rience Glo Glossar sary of of Usef Useful ul Terms rms Freq eque uently Ask Asked d Questi Questions For more information: Temporary G Te Guide Signs http://lincoln.ne.gov/city/pworks/engine/dconst/copecnst Down Do wnload ad PDF Br PDF Broch ochure re OLD CHENEY PAVEMENT REPAIR PROJECT | 40 th Street to Highway 2 NDOR Project LCLC – 5202(9), CN 13315, City 540041

  8. THANKS FOR ATTENDING! STEPHANIE RITTERSHAUS ERIKA NUNES Public In Public Involv lvement Coor ement Coordinat dinator or Project Engineer Pr oject Engineer Alfred Benesch & Company City of Lincoln Engineering Services 825 "M" Street, Suite 100 949 W Bond Street, Suite 200 Lincoln, NE 68508 Lincoln, NE 68521 402-479-2200 402-326-1037 srittershaus@benesch.com enunes@lincoln.ne.gov OLD CHENEY PAVEMENT REPAIR PROJECT | 40 th Street to Highway 2 NDOR Project LCLC – 5202(9), CN 13315, City 540041