Va Valle Risco Water System Im Improvements ts International Senior Design 12/9/2019 Team Introductions Sam Kiluk Camille Carlson Ceily Fessel Doan Civil Engineering Student Civil Engineering Student Environmental Engineering


  1. Va Valle Risco Water System Im Improvements ts International Senior Design 12/9/2019

  2. Team Introductions Sam Kiluk Camille Carlson Ceily Fessel Doan Civil Engineering Student Civil Engineering Student Environmental Engineering Structural focus Water Resources focus Student Tristan Odekirk Sultan Peace Corps Volunteer Tristan’s Dog Valle Risco, Panama Team Mascot 12/9/2019

  3. Presentation Schedule • Project Background • Problem Description • Data Collection & Analysis • Design Proposal • Cost and Scheduling • Conclusion • Questions 12/9/2019

  4. Project Background Valle Risco 12/9/2019

  5. Valle Risco • Supplied by 2 water distribution systems • Population: ~500 • 70 houses • Average household: ~7 persons • Ngäbe People 12/9/2019

  6. 12/9/2019

  7. Problem Description • No current water storage • Unreliable water supply • No water treatment • Breaks and leaks throughout system 12/9/2019

  8. Data Collection 12/9/2019

  9. Data Collection 12/9/2019

  10. Proposed Designs • Optimum: • Tank for future population • Replace all pipes • Sedimentation Tank & Sand Filter • Chlorine disinfection • Mid Range: • Smaller tank • Fix pipe breaks • Chlorine disinfection • Basic: • Fix pipe breaks • Solar disinfection • Boiling treatment 12/9/2019

  11. Chosen Design • Hydraulic Model • Junction Box • Storage Tank • Filtration System • Sedimentation Tank • Sand Filter • Pipe Crossings • Valves 12/9/2019

  12. EPANET Model Not to scale 12/9/2019

  13. 12/9/2019

  14. Junction Box 12/9/2019

  15. Sedimentation Tank 12/9/2019

  16. Sand Filter 12/9/2019

  17. Storage Tank 12/9/2019

  18. Pipe Crossings 12/9/2019

  19. Valves 12/9/2019

  20. Cost & Scheduling 12/9/2019

  21. Conclusion 12/9/2019