unmanne d ae r ial syste ms uas
play

Unmanne d Ae r ial Syste ms (UAS) 1 Ce nte r fo r Ac c e le ra - PowerPoint PPT Presentation

Ce nte r fo r Ac c e le ra ting I nno va tio n Unmanne d Ae r ial Syste ms (UAS) 1 Ce nte r fo r Ac c e le ra ting Inno va tio n What is Every Day Counts (EDC)? State-based model to identify and rapidly deploy proven but underutilized


  1. Ce nte r fo r Ac c e le ra ting I nno va tio n Unmanne d Ae r ial Syste ms (UAS) 1

  2. Ce nte r fo r Ac c e le ra ting Inno va tio n What is “Every Day Counts” (EDC)? State-based model to identify and rapidly deploy proven but underutilized innovations to:  shorten the project delivery process  enhance roadway safety  reduce congestion  improve environmental sustainability  EDC Rounds: two year cycles  Initiating 5 th Round (2019-2020) - 10 innovations  To date: 4 Rounds, over 40 innovations For more information: https://www.fhwa.dot.gov/innovation/ FAST Act, Sec.1444 2

  3. Ce nte r fo r Ac c e le ra ting Inno va tio n Unmanned Aerial Systems  What ar e the y?  “Dro ne s”  Multi-use a irc ra ft c o ntro lle d fro m a lic e nse d o pe ra to r o n the g ro und  Co uple d with se nso rs suc h a s hig h de finitio n c a me ra s a nd L iDAR  What ar e the y use d for ?  E nha nc e d da ta a c q uisitio n fo r: › Str uc tur al Inspe c tion › Constr uc tion Inspe c tion › E me r ge nc y Re sponse 3

  4. Ce nte r fo r Ac c e le ra ting Inno va tio n Benefits  Impr ove d Safe ty  Inc r e ase d E ffic ie nc y  Inc r e ase d Quality  Re duc e d Costs “An ave rag e c o st saving s o f 40% o ve r traditio nal inspe c tio n me tho ds” - Minne so ta DOT “Wo rkfo rc e was 45% mo re pro duc tive and the pro je c t was c o mple te d ahe ad o f sc he dule ” - Utah DOT “Re duc e d lane c lo sure s and inc re ase d safe ty fo r b o th wo rke rs and the trave ling pub lic ” - Ne w Je rse y DOT 4

  5. Ce nte r fo r Ac c e le ra ting Inno va tio n Mission Statement T o fa c ilita te the Na tio na l De plo yme nt o f Unma nne d Ae ria l Syste ms (UAS) to inc re a se sa fe ty a nd e ffic ie nc y, while sa ving time a nd mo ne y fo r the ta xpa ye rs. Pho to Cre dit: Ohio DOT Pho to Cre dit: No rth Ca ro lina DOT Pho to Cre dit: Ohio DOT 5

  6. Ce nte r fo r Ac c e le ra ting Inno va tio n Structural Inspection  Br idge Inspe c tion  High Mast L ighting  Confine d Spac e Inspe c tion  Re taining Walls  T Pho to Cre dit: Ohio DOT unne ls Pho to Cre dit: I o wa Sta te Unive rsity 6

  7. Ce nte r fo r Ac c e le ra ting Inno va tio n Construction Inspection  Sur ve ying  Routing Inspe c tion  Constr uc tion Quantitie s  Pr e - Constr uc tion/ Pr oje c t Sc oping  Wor k Zone T r affic Monitor ing Pho to Cre dit: Ohio DOT Pho to Cre dit: Ohio DOT 7

  8. Ce nte r fo r Ac c e le ra ting Inno va tio n Emergency Response  F looding E ve nts  Wind E ve nts  E ar th Move me nt (landslide s, mudslide s, volc anoe s)  F ir e E ve nts  E ar thquake s Pho to Cre dit: No rth Ca ro lina DOT Pho to Cre dit: Ohio DOT 8

  9. Ce nte r fo r Ac c e le ra ting Inno va tio n Core Implementation Team James Gray Connie Yew Office of Infrastructure, FHWA Office of Infrastructure, FHWA Dennis O-Shea Sharon Gordon John Haynes Fred Judson Bridge Safety, Local Aid Support, Division Office, Lead State Champion, FHWA FHWA FHWA Ohio DOT Jennifer Wells Glenn Stott Basil Yap Paul Wheeler Lead State Champion, Lead State Champion, Lead State Champion, Lead State Champion, Minnesota DOT New Jersey DOT North Carolina DOT Utah DOT Cameron Chasten Robin Murphy Brian Deery Rich Juliano Army Corps of Engineers Emergency Response ARTBA Representative AGC Representative Representative Texas A&M University 9

  10. Ce nte r fo r Ac c e le ra ting Inno va tio n Opportunities and Obstacles Opportunities Obstacles/Threats   UAS F AA Pilot Pr ogr am L ac k of or ganizational  Public pe r c e ption str uc tur e at the state le ve l  (E xc ite me nt) Re sistanc e to c hange   ST IC and AID funding No c ontr ol ove r othe r s using  F AA r e gulations dr one s 10

  11. Ce nte r fo r Ac c e le ra ting Inno va tio n How to achieve our mission? Ongoing Efforts Proposed Efforts  F  Pe e r HWA National UAS Pe e r e xc hange s  We binar E xc hange s  PIARC Re por  Guide spe c ific ations t and We binar  Dome stic SCAN  UAS tr aining pr ogr ams  T  Re gional Wor e c hBr ie f De ve lopme nt kshops  Br idge Inspe c tion Data Manage me nt Pr oje c t 11

  12. Ce nte r fo r Ac c e le ra ting Inno va tio n EDC-5 Funding Opportunities:  State Transportation Innovation Council (STIC) Incentive  Up to $100,000 per STIC per year to standardize an innovation  https://www.fhwa.dot.gov/innovation/stic/  Accelerated Innovation Deployment (AID) Demonstration  Up to $1 million available per year to deploy an innovation not routinely used  https://www.fhwa.dot.gov/innovation/grants/ 12

  13. Ce nte r fo r Ac c e le ra ting Inno va tio n Innovation De ployme nt Ne ws We e kly ne wsle tte r Bi-mo nthly ma g a zine T o Subsc ribe : E ma il: https:/ / www.fhwa .do t.g o v/ inno va tio n/ T e xt: Se nd “F HWA Innova tion” to 468311 13

  14. Ce nte r fo r Ac c e le ra ting Inno va tio n Unma nne d Ae r ia l Syste ms (UAS) for : 14

  15. Ce nte r fo r Ac c e le ra ting Inno va tio n Unmanned Aerial Systems  Spotlight on:  Br idge Inspe c tions Je nnife r We lls, Minne so ta DOT Sta te Bridg e I nspe c tio n E ng ine e r  Sur ve ying Pa ul Whe e le r, Uta h DOT L e a d UAS Co o rdina to r Pho to Cre dit: No rth Ca ro lina DOT 15

Recommend


More recommend