Timeline to date Kempsey By Bypa pass a s appr pproved f for c - PowerPoint PPT Presentation

Timeline to date Kempsey By Bypa pass a s appr pproved f for c const struction by NSW Minister for Planning July 2008 Stakeholder fo focus g gro roup c conve vened by KSC to prepare Background Issues Paper on bypass 2009


  1. Timeline… to date • Kempsey By Bypa pass a s appr pproved f for c const struction by NSW Minister for Planning July 2008 • Stakeholder fo focus g gro roup c conve vened by KSC to prepare Background Issues Paper on bypass 2009 • Fin inal R Report on Bypass Issues delivered to KSC June 2010 • KSC intern rnal c l consult ltative g group c convened to develop a comprehensive Bypass Strategy July 2010 • KSC Bypass Strategy placed on Public ic E Exhibit itio ion March 2011 • KSC Bypass Strategy ado adopted May 2011 • Bypas ass C Coordin dinat ator a appoin inted d and Strategy Implementation Program prepared July 2011

  2. Entry G y Gateways ys and nd S Sign gnage Economic ic Political al Strate tegy Enga ngage gement nt Develo lopment Asse ssets Cont ntrol Pl Plans Bypass Future Fu Kempsey Consu sultation Strategy Inno nnovation Pro rogram Strate tegy Infrastruct cture Marke keting Strate tegy Plans Plac ace B Based Commu mmunity Eve vents Promo motions s Urban Ur ban D Design - Masterplann nning ng

  3. THE ROLE OF THE BYPASS COORDINATOR Successfully coordinate Coun uncil’s s strategic response nse to the implications associated with the Pacific Highway Bypass Assist in developing positive r relatio ionship ips a and partnerships with the Kempsey community through sound communication and consultation on the implementation of the Bypass Strategy Provide a responsive and achievable urban des design mo model for Kempsey town centre and the villages of South Kempsey and Frederickton

  4. KEY FACTORS 1. Public Consul ultat ation on and Participation 2. Development of the Co Corri rridor Ma Master P r Plan 3. Preparation of de detailed d pr precinct ct de designs

  5. New ewslet etters Questionnai aire Fact S t Sheets ts and S Surveys Public Consul ulta tation n Media a Worksho hops and d Rele leas ases Feed eedback Bypass Intervi views ws Infor ormat ation Gro roup Market et S Stalls ls

  6. THE CORRIDOR MASTER PLAN Looking at g at the b e bigger gger picture e : go good urban an des esign gn Creating an intersection of lands dsca cape architecture, infrastructure • engin ineerin ing, urban business economics cs and planni ning ng Preparation of draft master p plan n covering South Kempsey, Kempsey • and Frederickton and adjoining corridor linkages Ensures a comprehensive approach to infrastructure planning and • execution of works within the Corridor into the future Blueprint to further direct the precinct design program • Foundation document to assist in attracti ting C Commo mmonwealth th a and • Sta tate f fund unding to support future construction programs

  7. PRECINCT DESIGN Mak aking i g it w work: ge getting t g the e detai ail r righ ght • Informed by the master plan, detail desig igns prepared for South Kempsey, Kempsey and Frederickton • Selection of materia ials, finishes, and plan lanting plans determined • Preparation of constructio ion documentation.

  8. PUBLIC CONSULTATION AND PARTICIPATION Draft Consultation Program August 2011 – June 2012 Stage ge Activity Timefr fram ame • 1. U Understand nding ing the p project, c community v values, s, Project website August – November 2011 • aspirations a s and interest sts Community surveys • Bypass Information Group [BIG1] • Stakeholder interviews • Community conversations [Oct/Nov] • Newsletter/fact Sheet #1 2. M Master plan d develop opment - options a and • BIG2 [early Feb 2012] December 2011 – March 2012 • concepts Newsletter / Fact Sheet #2 • Website update • Community conversations [present options] March 2012 • 3. F Finalisation of f mas aster p plan an BIG3 [May] April – June 2012 • Additional meeting with key stakeholders • Public exhibition of draft master plan • Website updated

  9. PUBLIC CONSULTATION AND PARTICIPATION Draft Consultation Program July 2012 – June 2013 Stage ge Activity Timefr fram ame • 1. 1. P Preci cinct design d develop opment – options a and BIG4 [July 2012] July – Sept 2012 • concepts Newsletter #3 • Update website • 2. 2. P Preci cinct design d develop opment - detaile led BIG5 [Dec 2012] October – December 2012 • Display final precinct designs • Update website • 3. F Finalisation of precinct d designs BIG6 [April 2013] January – June 2013 • Newsletter #4 • Update website • BIG7 [June 2013] • Community signoff [June 2013]

  10. THE CORRIDOR MASTER PLAN Draft Master Plan Program August 2011 – June 2012 Stage ge Activity Timefr fram ame • 1. U Understand nding ing the p project; c community v values, s, Define scope and working budget August – November 2011 • aspirations a s and interest sts Review existing documentation and identify gaps • Develop community survey and fact sheet • 2. M Master plan d develop opment – options a and Prepare outline plan and analysis December – March 2012 • concepts Prepare concept options • Prepare preliminary estimates of total project cost • Prepare preferred options to present to public • 3. F Finalisation of f mas aster p plan an Prepare firmer estimates of TPC April - June 2012 • Prepare final draft master plan based on preferred option • Place master plan on public exhibition • Adopt master plan

  11. PRECINCT DESIGN Draft Precinct Design Program July 2012 – June 2013 Stage ge Activity Timefr fram ame • 1. 1. P Preci cinct design d develop opment – options a and Establish scope of design, resources TPC and July – September 2012 concepts budget • Prepare concept design for each precinct • Select preferred option for each precinct 2. 2. P Preci cinct Design d develop opment - details ls • Develop schedule of materials and finishes October – December 2012 • Prepare detail documentation • Prepare final construction estimates • Prepare final precinct design drawings and place on display 3. F Finalisation of Precinct d designs • Prepare construction documentation of each January – June 2013 final precinct design • Undertake planning for the preparation of plans of management for key public open space within the corridor