tia tr 42 liaison to ieee 42 liaison to ieee tia tr
play

TIA TR- -42 Liaison to IEEE 42 Liaison to IEEE TIA TR Val - PowerPoint PPT Presentation

TIA TR- -42 Liaison to IEEE 42 Liaison to IEEE TIA TR Val Rybinski Rybinski Val Chair, TR- -42.7 42.7 Chair, TR Sterling Vaden Vaden Sterling Vice- -Chair, TR Chair, TR- -42.7 42.7 Vice October, 2005 October, 2005 Milpitas, CA


  1. TIA TR- -42 Liaison to IEEE 42 Liaison to IEEE TIA TR Val Rybinski Rybinski Val Chair, TR- -42.7 42.7 Chair, TR Sterling Vaden Vaden Sterling Vice- -Chair, TR Chair, TR- -42.7 42.7 Vice October, 2005 October, 2005 Milpitas, CA Milpitas, CA October 2005 IEEE 802.3

  2. TIA TR- -42.7 Meeting 42.7 Meeting TIA TR • Oct 3- -4, 2005 4, 2005 • Oct 3 • Alexandria, VA • Alexandria, VA st ballot for TSB • 1 st ballot for TSB- -155 closed 155 closed • 1 st ballot for ‘568 • 1 st ballot for ‘568- -B.2 B.2- -10 closed 10 closed • 1 • comment review process ongoing • comment review process ongoing • ‘568- -B.2 B.2- -11 approved for publication 11 approved for publication • ‘568 October 2005 IEEE 802.3

  3. Status of TSB- -155 155 Status of TSB st ballot for TSB • 1 st ballot for TSB- -155 closed 155 closed • 1 • approximately 30 comments pending • approximately 30 comments pending resolution resolution • teleconference scheduled for 10/21 • teleconference scheduled for 10/21 • procedure identified for 30- -day ballot day ballot • procedure identified for 30 • draft will be forwarded to IEEE when • draft will be forwarded to IEEE when ballot requirements are satisfied ballot requirements are satisfied October 2005 IEEE 802.3

  4. Status of ‘568- -B.2 B.2- -10 10 Status of ‘568 st ballot for TSB • 1 st ballot for TSB- -155 closed 155 closed • 1 • approximately 40 pages of comments • approximately 40 pages of comments pending resolution pending resolution • ballot resolution will continue at interim • ballot resolution will continue at interim meeting scheduled for December 6- -8 8 meeting scheduled for December 6 • objective to re- -ballot after interim ballot after interim • objective to re October 2005 IEEE 802.3

  5. Status of ‘568- -B.2 B.2- -11 11 Status of ‘568 Approved for Publication: SP- -3 3- -4426 4426- -AD11 AD11 Approved for Publication: SP Specification for Increased Diameter of Specification for Increased Diameter of 4- -Pair UTP and ScTP Cables Pair UTP and ScTP Cables 4 “ The requirement in clause 4.3.3.4 of TIA/EIA The requirement in clause 4.3.3.4 of TIA/EIA- - “ 568- -B.2 shall be revised as follows: B.2 shall be revised as follows: 568 The diameter of the completed cable shall be The diameter of the completed cable shall be less than 9.0 9.0 mm (0.354 in)*. mm (0.354 in)*.” ” less than * previously 6.35 mm (0.25 in.) * previously 6.35 mm (0.25 in.) October 2005 IEEE 802.3

  6. Next TIA Meeting Next TIA Meeting December 6- -8, 2005 8, 2005 December 6 Safety Harbor, FL Safety Harbor, FL www.tiaonline tiaonline.org .org www. October 2005 IEEE 802.3

  7. Thank you Thank you Contact Information: Contact Information: Val Rybinski Val Rybinski The Siemon Company The Siemon Company 101 Siemon Company Drive 101 Siemon Company Drive Watertown, CT 06795 Watertown, CT 06795 cell phone: (602) 793- -4029 4029 cell phone: (602) 793 valerie_ _rybinski rybinski@ @siemon siemon.com .com valerie October 2005 IEEE 802.3

Recommend


More recommend