thursday april 4 th 2019 lok sabha elections 2019
play

Thursday, April 4 th , 2019 Lok Sabha Elections 2019 NAMMA - PowerPoint PPT Presentation

MPLAD FUND UTILIZATION STUDY REPORT Bengaluru City Parliamentary Constituencies Suddi Mane, Press Club of Bengaluru Thursday, April 4 th , 2019 Lok Sabha Elections 2019 NAMMA BENGALURU PRIDE REGISTER | VOTE | PARTICIPATE MPLAD STUDY


  1. MPLAD FUND UTILIZATION STUDY REPORT Bengaluru City Parliamentary Constituencies Suddi Mane, Press Club of Bengaluru Thursday, April 4 th , 2019

  2. Lok Sabha Elections 2019 NAMMA BENGALURU PRIDE REGISTER | VOTE | PARTICIPATE MPLAD STUDY PERFORMANCE of MP ETHICAL ELECTIONS COMPREHENSIVE CANDIDATE INDEPENDENT CRITERIA BASED DON’T GIVE UP ON DEMOCRCY INFORMATION ASSESSMENT CITIZENS MEET CANDIDATE 2

  3. Members of Parliament Local Area Development Fund (MPLAD) About MPLADS • MPLADS scheme: Developmental works in the Parliamentary Constituency • INR 5 cr per annum is allocated to the MP’s per Parliamentary Constituency Study Objective • To analyze the utilization level of MPLADS in the three Parliamentary Constituencies which are under Bangalore Urban district . Methodology • Phase 1: Data collection and compilation – Data collected from the District Collector (DC) office for 4 financial years 2014-15 to 2017-18. • Phase 2: Analysis of the data • Phase 3: Validating the analyzed data from the MP’s office 3

  4. Members of Parliament Local Area Development Fund (MPLAD) Fund Meeting D V Sadananda Gowda to Meeting P C Mohan to Meeting Tejaswinini Ananthkumar, W/o late H N submit MPLAD study submit MPLAD study Ananth Kumar to submit MPLAD study 4

  5. Key Takeaways of MPLAD Utilization Study ★ Total available funds: 60 cr; Total Utilized funds: 55.53 cr - constituting 92 % utilization (across all three Parliamentary Constituencies) ★ Bengaluru North (100 % utilization) ; Bengaluru Central (95 % utilization); Bengaluru South (82 % utilization) ★ Citizen centric projects undertaken across the three parliamentary constituencies ★ 86 % of the MPLADS fund spent within the BBMP limits; 14 % in off BBMP limits ★ Drinking water and water infrastructure (25.98 %), Infrastructure development (12.62 %) and Public amenities (10.78%) form top three allocations across the three Parliamentary Constituencies ★ Hebbal 13 % in Bengaluru North , Basavangudi 25 % in Bengaluru South and Chamrajpet 28 % in Bengaluru Central form Assembly Constituencies with highest allocation 5

  6. Launch of MPLAD landing page Bengaluru City Parliamentary Constituencies https://bpac.in/election-habba-2019/mp-lad-fund-utilization-study/ 6

  7. MPLAD Analysis: Summary D V Sadananda Gowda P C Mohan Late H N Ananth Kumar Bengaluru North Bengaluru Central Bengaluru South Parliamentary Constituency Parliamentary Constituency Parliamentary Constituency 20.04 19.05 16.44 Total MP LAD fund spent (in INR crores) % utilization 100 % 95 % 82 % Water Infrastructure ₹ 6.36 ₹ 3.73 Water infrastructure ₹ 5.13 Health & Family Welfare ₹ 6.15 Water infrastructure ₹ 2.94 Public amenities ₹ 2.91 Infrastructure dvpmnt Top Spends Sports &Youth Services ₹ 2.76 Railway Infrastructure ₹ 2.86 Trust and Societies ₹ 2.10 from MPLAD Education ₹ 1.29 Public amenities ₹ 2.42 Education ₹ 1.68 fund Sports & Youth Services ₹ 1.76 ₹ 1.22 (in INR Development of women Yoga Kendra and child ₹ 0.86 crores) Key Projects Construction of Volley Ball and Construction of halt station and Construction of foot over bridge at ITPL - ₹ 2.86 cr Basket Ball stadium at Krishnadevaraya Halt Station, Malleshwaram - ₹ 2.15 cr Vijaynagar - ₹ 0.70 cr Supply of medical equipment's to Construction of RCC drains and Vani Vilas and Victoria Hospital - Construction of Multipurpose asphalting of roads - ₹ 0.70 cr ₹ 3.38 cr halls - ₹ 1.75 cr 7

  8. MPLAD Analysis: Bengaluru North Parliamentary Constituency 8

  9. Key Observations: Bengaluru North Parliamentary Constituency • The entire amount of Rs. 20 crores for the reference period was utilized. • Drinking water and related infrastructure (31.74%), Infrastructure development (30.68%) and sports and youth services (13.79%) constitute 76 % of the allocation under MPLADS • 30 % of the works under MPLADS funds were undertaken in the Assembly Constituencies which are beyond BBMP Limits. • Hebbal (13%), Malleshwaram (12%) and Yeshwantpura (11%) constitute 35 % of the work allocation under MPLADS funds 9

  10. MPLAD Analysis: Bengaluru Central Parliamentary Constituency 10

  11. Key Observations: Bengaluru Central Parliamentary Constituency • Health and Family Welfare (19.5%), Drinking water and related infrastructure (15.43%) and Railway infrastructure (15.01%) constitutes 50 % of allocation under MPLADS • Chamrajpet (28%), Mahadevpura (20%) and Sarvagnanagar (12%) constitute 60 % of the work allocation under MPLADS funds . • Areas in the Off BBMP limits of the PC has received allocation of ₹ 2.12 crores (11.13%) 11

  12. MPLAD Analysis: Bengaluru South Parliamentary Constituency 12

  13. Key Observations: Bengaluru South Parliamentary Constituency • Drinking water and related infrastructure (31.17%), public amenities (17.70%) and Trust and societies (12.77%) constitute 60 % allocation under MPLADS • Basavangudi (25%), Vijaynagar (16%) and Chickpet (14%) constitute 55 % of the work allocation under MPLADS funds • 2014-15 (20 %) , 2015-16 (16 %) of the MPLAD funds spent on Multipurpose halls 13

  14. THANK YOU forbangalore@bpac.in 14

Recommend


More recommend