This presentation was delivered by Bill Gething at the Soft Landings User Group meeting on 5 October. The slides describe the changes Bill is suggesting to the RIBA to bring the Plan of Work more into line with the Soft Landings Framework Words highlighted in yellow and green show the proposed changes. This is work in progress.
A Green Overlay for the Plan of Work Bill Gething Sustainability + Architecture October 2011
The Team Adrian Dobson RIBA Practice Bethany Winning RIBA Practice Carol Costello Edward Cullinan Architects Nigel Craddock Pascall + Watson Jess Hrivnak Max Fordham and Partners Saud Muhsinovic Fulcrum Mott MacDonald Alan Short University of Cambridge Lynne Sullivan sustainableBYdesign Marcella Ucci UCL
1963 version A: Inception Predesign B: Feasibility C: Outline proposals D: Scheme Design Design E: Detail Design Pre-Construction F: Production Info ? G: Bills of Quantities H: Tender Action J: Project Planning Construction K: Operations on site L: Completion M: Feedback
< Localism? < Planning application < Building control application < BREEAM < EPC < Performance in practice
Outline 39 words
Checkpoints Outline Strategic assessment Re-use of materials & buildings Lifespan & future climate horizon Site Waste Management Plan Post Occupancy Evaluation Full team appointed Initial Part L Materials Plain English description Energy declaration Audit details Post Completion Service agreed Info from specialists Non technical user guide Contractor sustainability Cost cutting Commissioning & handover Occupants guide Observe & fine tune DEC