PILE GROUP (TOWER) MULTI-MEDIA CAP PENETRATION
RESTORATION OF CAP BELOW PILE GROUP
COMPLETED FOUNDATION
PILE BOOT DETAIL (BOOT SEALS MEMBRANE TO PILE WALL)
Dust and Air Management Cap Before Construction Cap During Construction Cap After Construction Storm Water Diversion Surface Concrete Slab Berm Excavation Concrete Zone Pile Cap Clean Cover Soil (minimum 30 inches) Cap Depth Cap Depth Temporary Cover Minimum Minimum to Prevent Dust 54 inches 42 inches and Contact with Membrane Contaminated Gravel Asphalt Soil Sump Contaminated Soil Seal Concrete Membrane Filled Pipe to Piles and Piles Pile Caps Air Monitoring Station Water Spray for Dust Suppression * Daily Samples Lab Testing * There will be multiple air monitoring stations along the site Excavation perimeter and work zone during construction. Zone Sump HARBOR POINT 199768 - Revised 30 SEP 2013