the waste tires thermolysis plant geo power group
play

the Waste Tires Thermolysis plant Geo Power Group Directors & - PowerPoint PPT Presentation

the Waste Tires Thermolysis plant Geo Power Group Directors & mediators of New Energy projects Geo Power Group is a Dutch company with the aim to develop, finance, realize and manage new energy and waste to energy projects for the


  1. the Waste Tires Thermolysis plant

  2. Geo Power Group Directors & mediators of New Energy projects Geo Power Group is a Dutch company with the aim to develop, finance, realize and manage new energy and waste to energy projects for the generation and large scale supply of green electricity, heat, oil, gas, reusable materials and organic fertilizers. Climate change, dwindling resources, the growth of the world population and the increase of our prosperity make greater demands on finding new and renewable sources of energy and materials for our daily needs and the environment. The figures, results and images in this presentation are based on current market and assumed practical conditions and can only be finalized after feasibility study and (feedstock) testing of the referred project(s).

  3. Geo Power Group Directors & mediators of New Energy projects Organisation Our experienced company and project management team(s), with many years of experience in various complementary disciplines, has a broad and large international network. All have a passion for creating large supplies of sustainable energy and materials from renewable sources in conjunction with profitable projects. Our Focus Our focus is on Thermolysis, Waste to Energy, Solar, Biomass & biofuels, Hydro, Wind and Deep geothermal in co-operation with professional international management -, production - and operational partners. In the base using proven techniques, but with an eye for new innovative applications.

  4. Waste tires – an environmental and health problem ● a non-degradable waste product ● continuous contamination of the groundwater ● harmfull emissions from tire landfills ● harmfull emissions from burning tire landfills ● health risks from emissions and groundwater pollution ● a breeding ground for mosquitoes - health risks ● an increasing amount of waste tires per year

  5. the Waste Tires Thermolysis project (WTT) ● thermal anaerobic (oxygen free) process ● nearly 100% convertion of waste tires into reusable products ● proven and operational tested technology – experienced engineering ● start with most proven feedstock: waste tires ● end-products: high quality carbon blacks, oil, gas, metal & textile ● environmentally friendly waste treatment process ● low emissions, well within EU guidelines ● solid preparation and testing period in cooperation with international end product buyers

  6. the WTT project ● from development to operations ● project development & realization - Geo Power Group & partners ● in cooperation with experienced thermolysis and feedstock professionals ● contracting the feedstock - permanent market search ● selection of location(s) ● feasibility study ● support / grants / participation from governments, companies and private investors ● financial & organizational structure ● realization and coordination ● management and maintenance ● continuity and innovation

  7. the WTT plant ● process ● anaerobic combustion of waste tires / waste tire granulate ● basic plant treats 11.500 ton of waste tires per year ● own granulation unit for input control ● pre treatment and shreddering of the waste tires ● pyrolysis latest techniques & engineering ● milling and pelletizing of the carbon blacks ● gasification and condensation for gas & oil ● 35% carbon black, 45% oil, 15% metal, 5% textile ● continuous operation - at least 7500 hours per year ● about 5000 m2 working area needed

  8. the WTT project ● some figures ● treats 11.500 ton of waste tires / waste tire granulate per year ● total investment capital – inclusive pre treatment – 15 million euro ● project result – around 15% ● at least 7500 production hours per year ● from order till operations – about 1,5 year ● good results for equity partners ● (co)finance possibilities by Geo Power Group & partners

  9. The advantages of the WTT project ● no more environmental and health problems from waste tires ● large quantities of waste tires available world wide ● environmentally friendly process – most strengthen clean up criteria ● nearly 100% convertion of the waste tires into reusable products ● decentralized placement possible ● broad market for sale of end products – purchase intentions ● good results and bankable project – good investment opportunity ● (co)finance oppertunities by Geo Power Group ● continuous operations ● basis plant only takes 5000 m2 working area

  10. Cooperation possibilities ● joint venture ● purchase of equipment ● funding / finance / participation ● maintenance support & contract ● (operational) supervision ● open to discuss (other) options

  11. Contact & more information Geo Power Group B.V. Hattem, The Netherlands Contactperson: E.B.L. (Guido) Jellema www.geopowergroup.com T. +31 (0)38 303 11 90 E. info@geopowergroup.com

Recommend


More recommend