stillwater avenue bikeway meeting
play

STILLWATER AVENUE BIKEWAY MEETING June 27, 2017 Luke Hanson City - PowerPoint PPT Presentation

STILLWATER AVENUE BIKEWAY MEETING June 27, 2017 Luke Hanson City of Saint Paul, Public Works Stillwater Ave Bikeway Tonights Agenda: Present information on what is being proposed Answer Questions and talk to City Staff Get


  1. STILLWATER AVENUE BIKEWAY MEETING June 27, 2017 Luke Hanson City of Saint Paul, Public Works

  2. Stillwater Ave Bikeway • Tonight’s Agenda: • Present information on what is being proposed • Answer Questions and talk to City Staff • Get written feedback on the proposal

  3. Stillwater Ave Bikeway • Bike facilities are proposed on Stillwater Avenue • Objectives of Project: • Make Stillwater Avenue a safer place for people to bike • Provide a dedicated place to ride predictably, improving comfort for all users • Connect to existing facilities nearby

  4. Stillwater Ave Bikeway LARPENTEUR L A R P E N T E U R HAMLINE T H H O Y T G I Legend N CLEVELAND E K 5 PROSPERITY C 3 M E O T A T JACKSON S E EDGERTON R E D HORTON E C A COMO C O M O MARYLAND T C 2017 City Mill and I R N 7 R I A E N E R G Y P Overlay Projects A R K HIGHWAY 280 8 0 8 WHITE BEAR F R O N T 2 PIERCE BUTLER Y G N 1 A RAYMOND Grand Ave – Cretin to Cleveland N O W I R L S H E L COMO N G E F H I S N H O M I N N E H A H A N S MINNEHAHA 2 PENNSYLVANIA J Highland Pkwy – Snelling to Hamline A E R N T 9 Y A P N 3 Ramsey St – Summit to Grand O MOUNDS ROBERT UNIVERSITY I R A M INTERSTATE 94 I N T E R S T A T E 9 4 4 4 Selby Ave – Western to Summit 5 MARSHALL WARNER WARNER E HIGHWAY 52 L 5 Kellogg Blvd- John Ireland to W. 7th A 1 D HIGHWAY 61 INTERSTATE 35E 6 3 U P P E R A F T O N SHEPARD 6 Smith Ave – W. 7th to Kellogg PLATO WATER D MCKNIGHT N A 7 Johnson Pkwy – Phalen to E. Shore LOWER AFTON L LEXINGTON SHEPARD E WATER V E L C 8 Stillwater Ave – Hazel to McKnight H RANDOLPH 7TH I G Document Path: \\ATLANTIS\STP-PWUSERS\Administration\hansonlu\Desktop\2017 City Projects\ArcGISbasemapforProjects.mxd H C W O I A N 9 Third St – White Bear to McKnight N 2 Y C T O 5 E A N N A P O 2 R R L I S D S F O R D T A T E SAINT PAUL 3 5 M O N T R E A L E HIGHWAY 61 HIGHWAY 5 BAILEY 2017 Saint Paul Mill and Overlay N Projects 0 0.275 0.55 1.1 1.65 2.2 Miles

  5. Stillwater Ave Bikeway • Stillwater Resurfacing: • Between McKnight Rd and Hazel St • Top layer of the street is ground off and replaced • Pedestrian ramps will be replaced • Scheduled for late summer or fall 2017

  6. Stillwater Ave McKnight to Algonquin • Street is 44’ in width • Traffic Volumes: 3,800 – 4,400 vehicles per day • Speed Studies (2017): Average Speeds: 29 – 31 MPH 85 th Percentile Speeds: 33 – 36 MPH EB, 36 MPH WB • Signed Truck Route • Transit service (Route 74)

  7. Stillwater Ave McKnight to Algonquin • Bike lanes are proposed within the project limits. Why Bike Lanes? • Traffic Volumes and speeds • Heavy vehicles (signed truck route) • Bike Plan • Important east-west corridor

  8. Stillwater Ave McKnight to Algonquin Changes to the Street • Bike lanes in both directions • Narrower travel lanes • Removal of parking on one side of the roadway (south side proposed)

  9. Parking Counts

  10. Parking Counts

  11. Stillwater Ave Parking Counts

  12. Stillwater Ave Parking Counts

  13. Stillwater Ave Parking Counts

  14. Ruth – Algonquin – Case – Hazel Connection Proposed Facilities Outside of the Mill and Overlay Boundaries • Algonquin/ Ruth – Enhanced Shared Lanes from Minnehaha to Case • Case – Enhanced Shared Lanes from Algonquin to Hazel • Hazel – Bike Lanes from Case to Mechanic, Enhanced Shared Lanes north of Mechanic • Recommended in bike plan

  15. Ruth – Algonquin – Case – Hazel Connection Existing Proposed

  16. Ruth – Algonquin – Case – Hazel Connection Enhanced Shared Lane Example:

  17. Algonquin – Case – Hazel Connection Hazel Street • 44 ’ Wide between Case and Mechanic • Narrows twice north of Mechanic • Bike Plan recommends bike lanes • Low traffic volume (900 vehicles per day) • Parking Removal proposed on the east side of Hazel from Case to Mechanic • Very Low Parking Utilization (Average of 0.3 cars parked on the east side of Hazel across 15 counts) (Hazel St)

  18. Next Steps • Review the feedback collected • Finalize design details • Schedule a City Council Public Hearing

  19. Tonight Stillwater Avenue Bikeway Comment Form The City of Saint Paul is planning a street resurfacing on Stillwater Ave between McKnight Rd • Review info on Boards and Hazel St in 2017. Implementing bicycle lanes on Stillwater Ave as a component of this project is being proposed. To make important connections, extending bike facilities on Ruth/ Algonquin, Case, and Hazel St is also proposed. • Discuss with city staff Please provide written feedback on the proposed plans for Stillwater Ave by doing one of the following: • Write comments below • Send an email to city sta fg ( Luke.Hanson@ci.stpaul.mn.us ) • Leave a comment on Open Saint Paul (stpaul.gov/open) • Leave written comments Name, address (optional): Comments: • Sign-in at entry table

  20. Thank you for attending! Luke Hanson City of Saint Paul | Department of Public Works Transportation Planning and Safety Division Email: Luke.Hanson@ci.stpaul.mn.us Phone: 651-266-6146

Recommend


More recommend