Stadium Boulevard Road Reconstruction Public meeting December 2, 2014
Agenda ! Welcome and introductions (15 min.) ! Presentation (15 min.) ! Project goals ! Rationale and activities related to each goal ! Public engagement overview ! Discussion (50 min.) ! Gather thoughts and ask questions at tables ! Reconvene as large group to report-out and discuss ! Timeline and next steps (10 min.) Stadium Boulevard Reconstruction Project 2
Project Goals 1. Road reconstruction – Stadium Boulevard from Hutchins to Kipke – Potter and Prescott, as a result of utility work 2. Underground utility improvements – Water mains (clean drinking water) – Stormwater management 3. Non-motorized amenities under consideration – Bike lanes in the roadway – Mid-block crossings – Sidewalk installation on south side of E. Stadium Stadium Boulevard Reconstruction Project 3
Stadium Boulevard: Hutchins to Kipke STADIUM BOULEVARD RECONSTRUCTION PROJECT VICINITY DRAWING (File No. 2014-035) 30" Watermain work - may include roadway reconstuction Stadium Blvd Reconstruction feet 4000 km 1 Stadium Boulevard Reconstruction Project 4
Goal 1: Road Reconstruction ! Rationale: - Improve the quality of the road surface from Hutchins to Kipke - Bring this remaining stretch of Stadium Boulevard up to current standards ! Activities: - Total road reconstruction, including sub-base - Adjust lane alignment and fine tune curb lines ! Guiding Standards: - American Association of State Highway Transportation Officials policies - City of Ann Arbor Complete Streets policy - Americans with Disabilities Act Stadium Boulevard Reconstruction Project 5
Stadium Boulevard Road Surface Stadium Boulevard Reconstruction Project 6
Goal 2: Underground Utility Work ! Rationale: – Improve quality, reduce the rate of release of stormwater in the area – Address capacity needs and poor condition of water mains (raw water, drinking water) ! Activities: – Provide underground storage for stormwater – Replace, up-size, and re-route water mains* ! Guiding Standards: – Ann Arbor Code of Ordinances Chapter 63: Storm Water Management and Soil Erosion and Sedimentation Control – National Pollutant Discharge Elimination System *Note: neighborhood streets Potter and Prescott are likely to require reconstruction as a result of water main re-routing Stadium Boulevard Reconstruction Project 7
Water Main Upgrade Needed Stadium Boulevard Reconstruction Project 8
Goal 3: Non-Motorized Amenities ! Rationale: – Improve safety and access for pedestrians, cyclists ! Activities: – Provide for visible, accessible mid-block crossings at logical intervals – Accommodate bike lanes within roadway – Studying the elimination of existing sidewalk gap on south side of Stadium Boulevard, near the UM football stadium ! Guiding Standards: - American Association of State Highway Transportation Officials policies - City of Ann Arbor Complete Streets policy – City of Ann Arbor Non-Motorized Plan – Americans with Disabilities Act Stadium Boulevard Reconstruction Project 9
South Side of Stadium Boulevard Stadium Boulevard Reconstruction Project 10
Public Engagement Overview ! Stakeholder engagement – University of Michigan – Ann Arbor Public Schools – Ann Arbor Golf & Outing Club – AAATA – Local public safety/law enforcement organizations – Pedestrian Safety and Access Task Force – Washtenaw Biking and Walking Coalition – Adjacent residential and business communities ! Public meetings (three planned) ! Outreach to adjacent residential and business communities is ongoing Stadium Boulevard Reconstruction Project 11
Discussion 1. Construction impacts 2. Underground utilities 3. Non-motorized amenities 4. Other questions, concerns, suggestions? Process: ! Table discussions on the above topics (25 min.) ! Report-out and discuss as one group (25 min.) Stadium Boulevard Reconstruction Project 12
Proposed Timeline ! Stakeholder engagement: ongoing throughout ! First public meeting: December 2, 2014 ! Preliminary design drawings ! Second public meeting: February 2015 - Share preliminary design; gather feedback ! Complete final design ! Final public meeting: TBD - Share final design, construction plans, contact information ! Construction bidding process ! Construction: 2016-2017 Stadium Boulevard Reconstruction Project 13
Recommend
More recommend