Spirit 2014 NAU ASCE Concrete Canoe Team Design Team: Brent Allman Ariel Suarez Hannah Adele Williams Shuo Zhang Project Management Hannah Adele Williams Project Manager, Reinforcement Lead Shuo Zhang Structural Analysis Lead Brent


  1. Spirit 2014 NAU ASCE Concrete Canoe Team Design Team: Brent Allman Ariel Suarez Hannah Adele Williams Shuo Zhang

  2. Project Management Hannah Adele Williams Project Manager, Reinforcement Lead Shuo Zhang Structural Analysis Lead Brent Allman Ariel Suarez Concrete Lead Hull Design Lead 2 Hannah Adele Williams

  3. Project Management continued Technical Advisor Client Thomas Nelson Mark lamer, PE, MEng., Project Engineer Instructor Hubbard and Merrel NAU 3 Hannah Adele Williams

  4. Presentation Overview • Project Understanding • Scope of Services • Schedule • Cost of Engineering Services 4 Hannah Adele Williams

  5. Project Understanding • Background on Concrete Canoe • Stakeholders • Project Description • Goals and Technical Aspects 5 Shuo Zhang

  6. Background • Annual ASCE competition • NAU ASCE student chapter depends on completed product • Night Fury • Must comply with 2014 rules and regulations 6 Shuo Zhang

  7. Stakeholders • NAU CE Department • NAU ASCE Student Chapter 7 Shuo Zhang

  8. Project Description • Construct a thin shelled, lightweight concrete canoe • 2014 ASCE National rules and regulations • Participate in ASCE PSWC • Canoe will be judged on a number of different levels • National Competition 8 Shuo Zhang

  9. Goals and Technical Aspects • Build off of Night Fury’s morale boost • Use Night Fury as a stepping stone • Place in top 5 • Relate engineering knowledge 9 Ariel Suarez

  10. Scope of Services PHASE I: Research Task 1.0 Begin PHASE IV: Conference Task 2.0 Concrete Mix Design Task 8.0 Design Report Task 3.0 Hull Design Task 9.0 Paddling Task 10.0 Oral Presentation PHASE II: Design Task 11.0 Conference Task 4.0 Structural Analysis Task 5.0 Reinforcement Design PHASE V: Capstone Task 12.0 Deliverables PHASE III: Construction Task 6.0 Canoe Construction Task 7.0 Display Construction 10 Ariel Suarez

  11. Exclusions Tasks to be excluded from this project: o Design strong back o Build mold o Drawing canoe in AutoCAD Civil 3D o Structural analysis on mode of transportation 11 Ariel Suarez

  12. R.I.P. Impacts Night Fury Sunrise: March 2013 Economical Sunset: TBD Building canoe every year Environmental Material waste Educational Mentorship Program Real-world application Ariel Suarez 12

  13. Schedule 13 Brent Allman

  14. Schedule continued 14 Brent Allman

  15. Cost Estimate of Engineering Services 1.0 .0 Per ersonnel Per erson Hou ours Ra Rate, $/hr Cos Cost, $ Project Manager 150 40 6,000 Hull Designer 150 30 4,500 Structural Analyst/Reinforcement Designer 150 20 3,000 Concrete Designer/Lab Technician 150 10 1,500 Total personnel 15,000 2.0 2.0 Travel Local meetings 3.0 3.0 Overhead 1,200 4.0 4.0 TOTAL 16,200 Brent Allman 15

  16. Project Summary • Optimize last year’s design • Build a thinshelled, light weight concrete canoe • Attend and participate in the ASCE PSWC Brent Allman 16