1 SOUTH KENSINGTON CWG: 06 JULY 2016 06 JULY 2016 South Kensington: Consultative Working Group - Design Update
2 SOUTH KENSINGTON CWG: 06 JULY 2016 Progress update: pre-application comments Further pre-app meeting with Royal Borough officers Officers reviewed design and further considerations shared with TfL: 1) Greater design context to the existing station, with Edwardian fabric applied throughout 2) Consideration of canopy design and how it integrates with existing station 3) Use and type of brick stock applied throughout the station design 4) Style of ticket hall extension and the look and feel of facade Site visit at Farringdon station arranged
3 SOUTH KENSINGTON CWG: 06 JULY 2016 Revised canopy design
4 SOUTH KENSINGTON CWG: 06 JULY 2016 Revised canopy design
5 SOUTH KENSINGTON CWG: 06 JULY 2016 Revised canopy design
6 SOUTH KENSINGTON CWG: 06 JULY 2016 Overbridge design
7 SOUTH KENSINGTON CWG: 06 JULY 2016 Stairwell design and platform barrier Reflecting on RBKC comments, further consideration on brick application around staircase, providing greater harmony with existing station design
8 SOUTH KENSINGTON CWG: 06 JULY 2016 Emergency stairwell
9 SOUTH KENSINGTON CWG: 06 JULY 2016 Ticket hall design
10 SOUTH KENSINGTON CWG: 06 JULY 2016 Next Steps 29 June: meeting scheduled with RBKC officers 8 July: site visit with RBKC officers at Farringdon station 13 July: public drop-in session July: submit listed building consent application
11 SOUTH KENSINGTON CWG: 06 JULY 2016 Questions?