smart plan
play

SMART Plan ACE S Ve hic le s Subc ommitte e Aile e n Bo uc l , AI - PowerPoint PPT Presentation

Str ate gic Miami Ar e a Rapid T r ansit SMART Plan ACE S Ve hic le s Subc ommitte e Aile e n Bo uc l , AI CP, E xe c utive Dire c to r Mia mi-Da de T ra nspo rta tio n Pla nning Org a niza tio n No ve mb e r 20, 2019 ACE S Ve


  1. Str ate gic Miami Ar e a Rapid T r ansit SMART Plan ACE S Ve hic le s Subc ommitte e Aile e n Bo uc lé , AI CP, E xe c utive Dire c to r Mia mi-Da de T ra nspo rta tio n Pla nning Org a niza tio n No ve mb e r 20, 2019

  2. ACE S Ve hic le s Subc ommitte e  Critical multimodal transportation needs  Increasing congestion and system unreliability  Era of transformation in technology and travel  Emergence of CAV & social network transportation providers, e- commerce, advanced logistics & new mobility services  Changing models in mobility/land- use, public/private partnerships & government regulation

  3. SMART De monstr ation Pr ogr am • Re c og nize disruption- inve stme nts & ope ra tions • E nc oura g e innova tion a t loc a l le ve l • Ca pture wide ra ng e of sta ke holde rs • F orm ne w Public / Priva te Pa rtne rships • E mpha size fle xibility, a da pta bility a nd inte g ra tion • Urba n mobility te st- g round

  4. SERVICE AREA MAP FIRST/LAST MILE SOLUTIONS

  5. 2018 SMART De monstr ation Pr oje c ts Cur r e nt Status  City of Miami Flagami Trolley – Service Began July 2018  Doral FIU Trolley Service – Service Began September 2018  Coral Gables Flex Service – Service Began January 2019  Pinecrest Transitway Circulator – Service Began January 2019  North Bay Village SMART Feeder Route – Area Service July 2019  Palmetto Bay Transit Service – Service Began July 2019  Palmetto Bay Transit Facility – Opened July 2019  Medley Central Commuter Route – Winter 2019  Cutler Bay Express Service – Spring 2020  Civic Center Metrorail Station Area On-Demand – Spring 2020  South Miami Metrorail Station Area On-Demand – Spring 2020  Dadeland North Metrorail Station Area On-Demand – Spring 2020  Dadeland South Metrorail Station Area On-Demand – Spring 2020  NE Corridor Demonstration Station (Capital Funding) – FY 2021  NE Corridor Demonstration Train Service – FY 2022  Miami Shores SMART Feeder Route (discontinued via agency consensus)

  6. 2019 SMART De monstr ation Pr ogr am Pr oje c ts Bisc ayne Gar de ns T r ansit E xte nsion • T r i- Rail/ Me tr or ail T r ansfe r Station • On- De mand Se r vic e We st Dade Cir c ulator On- De mand • Se r vic e SW 344th Par k and Ride Station • (Constr uc tion) Panthe r Station to Dolphin Station • E xpr e ss Se r vic e T own of Miami L ake s E xpr e ss Se r vic e • to Palme tto Me tr or ail Station Sur fside / Bal Har bour / Bay Har bor • On- De mand Se r vic e Village of E l Por tal E xpr e ss Se r vic e • F IU/ Panthe r Station On- De mand • Se r vic e City of Hiale ah/ Hiale ah Gar de ns to • I- 75 Miami Gar de ns Par k & Ride City of Miami L ibe r ty City T r olle y • Se r vic e City of Miami Be ac h South Be ac h • T r olle y Se r vic e

  7. De fine the E va lua tion Pr oc e ss: • De ve lo p Pe rfo rma nc e SMART F ra me wo rk fo r Asse ssing Pro je c ts • Wo rk with Sta te & Munic ipa l De monstr ation Pa rtne rs fo r F ra me wo rk Pr ogr am Se le c tio n a nd E ndo rse me nt E valuation • Co lle c t E xisting Da ta fro m Pha se Cr ite r ia & I Pro je c ts Monitor ing • De ve lo p Da ta Co lle c tio n Me thodology Guide line s

  8. De ve lop Monitor ing Pr og r a m: • T ra ve l T ime (T o ta l &Sa ving s) • T o ta l Ride rship: L OS fo r Use rs SMART re q ue nc y, Se rvic e Spa n, On ‐ T F ime • Pe rfo rma nc e , De la ys, Sa tisfa c tio n De monstr ation • Re turn o n I nve stme nt Pr ogr am E valuation • Re duc tio n in VMT Cr ite r ia & • Ac c e ssib ility to Ma jo r Ac tivity Monitor ing Ce nte rs Me thodology Po pula tio n De nsity, E mplo yme nt De nsity • • Multimo da l Co nne c tivity

  9. Conne c te d Syste ms: Ve hic le to Infra struc ture

  10. Automate d & Conne c te d Syste ms

  11. 2045 L ong Range T r anspor tation Plan A F oc us on E me r ging T e c hnologie s  Co nne c te d & Auto no mo us Ve hic le s (CAV)  T r anspo r tatio n Ne two r k Co mpanie s/ Ride shar e  E -c o mme r c e and advanc e d lo gistic s  Ur ban Air Mo bility  Magle v T r ains  Sate llite -Base d Air T r affic Co ntr o l Syste ms  Smar t Ro ads/ Infr astr uc tur e  Ne w mo bility se r vic e s

  12. 2045 L ong Range T r anspor tation Plan (r e late d industr ie s) Auto mate d Me al De live r y Hype r lo o p T r anspo r tatio n Syste ms Dr o ne s So lar Ro adways

  13. L and De ve lopme nt Guide line s to Ac c ommodate ACE S Ve hic le s  Mia mi Be a c h Pilo t Ride sha re L o a ding Zo ne s  Pa rking Ga ra g e Sta nda rds  Re duc tio n in Pa rking Re q uire me nts

  14. L and De ve lopme nt Guide line s to Ac c ommodate ACE S Ve hic le s  E le c tric Ve hic le Pa rking  Cha rg ing Sta tio ns  SMART De mo Pro je c t: So uth Be a c h T ro lle y

  15. Be st Pr ac tic e in Collabor ation SMART Plan SMART Pla n Support from Sta te , Re g iona l & L oc a l Resolutions of Support

  16. Que stions & Disc ussion Aile e n Bouc lé , AICP T PO E xe c utive Dir e c tor www.MiamiDade T PO.or g

Recommend


More recommend