Welcome bureau of engineering City of Los Angeles 5/2/2018 Silver Lake Reservoir Complex Master Plan Discussion of Consultant Hiring Process COMMUNITY OPEN HOUSE FRIENDSHIP AUDITORIUM 3201 RIVERSIDE DRIVE MAY 1, 2018 Page 1 Council District 4 David E. Ryu (Councilmember) Rachel Fox Nikki Ezhari Council District 13 Mitch O’Farrell (Councilmember) Christine Peters Mary Rodriguez Page 2 1
Agenda Project Team 5/2/2018 Bureau of Engineering (BOE) Deborah Weintraub, AIA, LEED AP Chief Deputy City Engineer Cyril Charles, P.E. Project Manager Armen Dermenjian Asst. Project Manager Mary Nemick Director of Communications In coordination with Los Angeles Dept. of Water and Power (LADWP) Page 3 Background Process for Hiring Consultant for Master Plan Project Overview Project Schedule Page 4 2
Project Introduction Background 5/2/2018 Memorandum of Agreement (MOA) was approved by LADWP Board in January 2018 MOA was approved by Board of Public Works in March 2018 MOA was approved by City Council on March 27, 2018 Council File (CF No. 08-3420-S1) Page 5 Introduction Objectives LADWP Facilities LADWP Scheduled and Planned Projects Project Description Page 6 3
Project Objectives Introduction 5/2/2018 Silver Lake and Ivanhoe Reservoirs Engineered by William Mulholland and completed in 1908 Located on an approximately 127 acre site Both reservoirs are decommissioned and replaced with a new covered water storage facility north of Griffith Park Page 7 Update from Year 2000 Master Plan Guide Future Public Uses and Future Physical and Operational Changes Stakeholder and Community Input Maintain LADWP Access Page 8 4
LADWP Facilities and Scheduled Projects 5/2/2018 Page 9 LADWP Facilities Approximately 81 acres of reservoir surface (64%) and 46 acres of land area (36%) Approximately 13 acres of the land space is restricted for LADWP facilities and infrastructure Page 10 5
LADWP Facilities and Scheduled Projects LADWP Facilities and Scheduled Projects 5/2/2018 LADWP Scheduled and Planned Projects Pollock Well #3 Groundwater Supply Project Gate Well Modifications Silver Lake Stormwater Capture Project Aeration and Recirculation Systems Project Page 11 LADWP Scheduled and Planned Projects Modular Offices for LADWP Reservoir Re-characterization Permit with the Los Angeles Regional Water Quality Control Board Silver Lake Reservoir Walkway (COMPLETED Spring 2018) Ivanhoe Reservoir Walkway Page 12 6
Project Description Project Description 5/2/2018 Current Publicly Accessible Areas Areas to Be Considered for Expanded Public Access and New Uses Natural Resources Water Level in Reservoirs Page 13 Water Sources Reservoir Edge Condition Potential Support Facilities Public Activities on the SLRC Site Envision Guidelines Page 14 7
Master Plan Consultant Selection Process Project Schedule 5/2/2018 2018 2019 2020 Start End Task J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D Date Date Memorandum of Agreement Approved Mar-18 Mar-18 Develop Project Description and Scope of Work Mar-18 May-18 Select Master Plan Consultant Jun-18 Oct-18 Issue Notice to Proceed to Selected Consultant Oct-18 Oct-18 Draft Master Plan Oct-18 Oct-19 Prepare and Submit Final Master Plan Oct-19 May-20 Master Plan Approval May-20 Nov-20 Page 15 Prepare and Issue Request for Proposals Interview and Short-List Firms Short-Listed Firms to Present to the Community (Fall 2018) Select Highest Rated Firm Award Contract Start Master Plan Design Process Page 16 8
Comment Cards 5/2/2018 http://eng.lacity.org/silverlake_reservoirs Page 17 Page 18 9
Comment Cards 5/2/2018 Page 19 moving forward City Council MOA approval (CF No. 08-3420-S1) available at: https://cityclerk.lacity.org/lacityclerkconnect/index.cfm Project Description Available for comments on May 2, 2018 Project Description Available at: eng.lacity.org/silverlake_reservoirs Comment Period Closes on May 22, 2018 Page 20 10
5/2/2018 THANK YOU! Page 21 11
Recommend
More recommend