Welcome bureau of engineering City of Los Angeles 5/2/2018 Silver Lake Reservoir Complex Master Plan Discussion of Consultant Hiring Process COMMUNITY OPEN HOUSE FRIENDSHIP AUDITORIUM 3201 RIVERSIDE DRIVE MAY 1, 2018 Page 1 Council


  1. Welcome bureau of engineering City of Los Angeles 5/2/2018 Silver Lake Reservoir Complex Master Plan Discussion of Consultant Hiring Process COMMUNITY OPEN HOUSE FRIENDSHIP AUDITORIUM 3201 RIVERSIDE DRIVE MAY 1, 2018 Page 1  Council District 4 David E. Ryu (Councilmember) Rachel Fox Nikki Ezhari  Council District 13 Mitch O’Farrell (Councilmember) Christine Peters Mary Rodriguez Page 2 1

  2. Agenda Project Team 5/2/2018 Bureau of Engineering (BOE)  Deborah Weintraub, AIA, LEED AP Chief Deputy City Engineer  Cyril Charles, P.E. Project Manager  Armen Dermenjian Asst. Project Manager  Mary Nemick Director of Communications In coordination with Los Angeles Dept. of Water and Power (LADWP) Page 3  Background  Process for Hiring Consultant for Master Plan  Project Overview  Project Schedule Page 4 2

  3. Project Introduction Background 5/2/2018  Memorandum of Agreement (MOA) was approved by LADWP Board in January 2018  MOA was approved by Board of Public Works in March 2018  MOA was approved by City Council on March 27, 2018 Council File (CF No. 08-3420-S1) Page 5  Introduction  Objectives  LADWP Facilities  LADWP Scheduled and Planned Projects  Project Description Page 6 3

  4. Project Objectives Introduction 5/2/2018  Silver Lake and Ivanhoe Reservoirs  Engineered by William Mulholland and completed in 1908  Located on an approximately 127 acre site  Both reservoirs are decommissioned and replaced with a new covered water storage facility north of Griffith Park Page 7  Update from Year 2000 Master Plan  Guide Future Public Uses and Future Physical and Operational Changes  Stakeholder and Community Input  Maintain LADWP Access Page 8 4

  5. LADWP Facilities and Scheduled Projects 5/2/2018 Page 9 LADWP Facilities  Approximately 81 acres of reservoir surface (64%) and 46 acres of land area (36%)  Approximately 13 acres of the land space is restricted for LADWP facilities and infrastructure Page 10 5

  6. LADWP Facilities and Scheduled Projects LADWP Facilities and Scheduled Projects 5/2/2018 LADWP Scheduled and Planned Projects  Pollock Well #3 Groundwater Supply Project  Gate Well Modifications  Silver Lake Stormwater Capture Project  Aeration and Recirculation Systems Project Page 11 LADWP Scheduled and Planned Projects  Modular Offices for LADWP  Reservoir Re-characterization Permit with the Los Angeles Regional Water Quality Control Board  Silver Lake Reservoir Walkway (COMPLETED Spring 2018)  Ivanhoe Reservoir Walkway Page 12 6

  7. Project Description Project Description 5/2/2018  Current Publicly Accessible Areas  Areas to Be Considered for Expanded Public Access and New Uses  Natural Resources  Water Level in Reservoirs Page 13  Water Sources  Reservoir Edge Condition  Potential Support Facilities  Public Activities on the SLRC Site  Envision Guidelines Page 14 7

  8. Master Plan Consultant Selection Process Project Schedule 5/2/2018 2018 2019 2020 Start End Task J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D Date Date Memorandum of Agreement Approved Mar-18 Mar-18 Develop Project Description and Scope of Work Mar-18 May-18 Select Master Plan Consultant Jun-18 Oct-18 Issue Notice to Proceed to Selected Consultant Oct-18 Oct-18 Draft Master Plan Oct-18 Oct-19 Prepare and Submit Final Master Plan Oct-19 May-20 Master Plan Approval May-20 Nov-20 Page 15  Prepare and Issue Request for Proposals  Interview and Short-List Firms  Short-Listed Firms to Present to the Community (Fall 2018)  Select Highest Rated Firm  Award Contract  Start Master Plan Design Process Page 16 8

  9. Comment Cards 5/2/2018 http://eng.lacity.org/silverlake_reservoirs Page 17 Page 18 9

  10. Comment Cards 5/2/2018 Page 19 moving forward  City Council MOA approval (CF No. 08-3420-S1) available at: https://cityclerk.lacity.org/lacityclerkconnect/index.cfm  Project Description Available for comments on May 2, 2018  Project Description Available at: eng.lacity.org/silverlake_reservoirs  Comment Period Closes on May 22, 2018 Page 20 10

  11. 5/2/2018 THANK YOU! Page 21 11