Tasman Resources NL Tasman Resources NL Parkinson Dam Epithermal Gold, Silver, Lead and Zinc Epithermal Gold, Silver, Lead and Zinc
Tasman Resources NL Tasman Resources NL Epithermal Gold – – Silver Deposits Silver Deposits Epithermal Gold Figure from AIST, Japan website
Tasman Resources NL Tasman Resources NL Parkinson Dam – – Regional Targeting Regional Targeting Parkinson Dam • Hiltaba - Age mineralisation rims margins of GRV “plate” • Cu-Au-Ag (U, REE) occurs on N and NE margins • Au-Ag (Pb-Zn) occurs on S (& W margins) • Limited cover on S margin
Tasman Resources NL Tasman Resources NL Parkinson Dam - - Previous Calcrete Sampling Previous Calcrete Sampling Parkinson Dam
Tasman Resources NL Tasman Resources NL Parkinson Dam – – Local Geology Local Geology Parkinson Dam
Tasman Resources NL Tasman Resources NL Parkinson Dam - - Historical Historical Parkinson Dam • Mid-2005: Outcropping epithermal gold/silver discovered by Tasman following up (PIRSA compiled) calcrete data • Late-2005 and 2006: Drilling (PACE in 2005) locates multiple low grade gold-silver-lead-zinc zones. E.g. – 7.6% Pb, 10.5% Zn, 0.4% Cu, 1.20g/t Au, 120g/t Ag over 1.66m – 3.4g/t Au, 80g/t Ag over 3m • Mid-2007: High grade gold and silver (21g/t Au, 83g/t Ag) over 21m in PD 63 (inc. 9m at 31g/t Au, 152g/t Ag)
Tasman Resources NL Tasman Resources NL Parkinson Dam: Gold- -Silver Cross Section Silver Cross Section Parkinson Dam: Gold
Tasman Resources NL Tasman Resources NL Parkinson Dam: Lead- -Zinc Cross Section Zinc Cross Section Parkinson Dam: Lead
Tasman Resources NL Tasman Resources NL Parkinson Dam – – Surface Outcrops Surface Outcrops Parkinson Dam Unaltered, red arkosic Corunna Conglomerate showing weak sedimentary layering
Tasman Resources NL Tasman Resources NL Parkinson Dam – – Surface Outcrops Surface Outcrops Parkinson Dam Bleaching of red Corunna Conglomerate around narrow quartz vein
Tasman Resources NL Tasman Resources NL Parkinson Dam – – Surface Outcrops Surface Outcrops Parkinson Dam Narrow crustiform-colloform banded quartz vein (mineralised) with bleached alteration halo
Tasman Resources NL Tasman Resources NL Parkinson Dam – – Surface Outcrops Surface Outcrops Parkinson Dam Epithermal crustiform-colloform layered quartz veining
Tasman Resources NL Tasman Resources NL Parkinson Dam – – Surface Outcrops Surface Outcrops Parkinson Dam Breccia texture in epithermal quartz vein float
Tasman Resources NL Tasman Resources NL Parkinson Dam Parkinson Dam Cut and polished samples showing layered, colloform colloform- - Cut and polished samples showing layered, crustiform quartz veining quartz veining crustiform
Tasman Resources NL Tasman Resources NL Parkinson Dam – – Surface Surface Outrops Outrops Parkinson Dam Silicified red Corunna Conglomerate Kaolinitised red Corunna Conglomerate.
Tasman Resources NL Tasman Resources NL Parkinson Dam – – Mineralisation/Alteration Mineralisation/Alteration Parkinson Dam Narrow epithermal quartz vein (amethystine) with sulphides
Tasman Resources NL Tasman Resources NL Parkinson Dam – – Mineralisation/Alteration Mineralisation/Alteration Parkinson Dam Epithermal-style quartz – sulphide (pyrite, galena, sphalerite) mineraliation
Tasman Resources NL Tasman Resources NL Parkinson Dam – – Mineralisation/Alteration Mineralisation/Alteration Parkinson Dam Layered epithermal sphalerite –galena – pyrite – chalcopyrite – quartz vein (polished half-core sample; scale in cm and mm)
Tasman Resources NL Tasman Resources NL Parkinson Dam – – Mineralisation/Alteration Mineralisation/Alteration Parkinson Dam • PD 63: 21m @ 21g/t Au, 83g/t Ag (inc 9m @ 31g/t Au, 152 g/t Ag) • Distinctive late-stage epithermal veining: – Quartz & haematite – Apatite, chlorite, muscovite (vanadiferous phengite) – Lead, zinc & copper poor • Gold (electrum, ~ 35% Ag)
Tasman Resources NL Tasman Resources NL Parkinson Dam: Gold – – Silver Mineralisation Silver Mineralisation Parkinson Dam: Gold Free gold (electrum) associated with epithermal quartz and haematite
Tasman Resources NL Tasman Resources NL Parkinson Dam Parkinson Dam PD 63: 21m at 21g/t Au, 83g/t Ag PD 70: 1m at 9g/t Au Open ended East-West structure Follow-up drilling to commence shortly
Tasman Resources NL Tasman Resources NL Parkinson Dam Parkinson Dam The Story Continues.... The Story Continues....
Recommend
More recommend