ALBERTO RIBOLLA C.E.O. Sices S.p.A. Lunedì 21 aprile 1008 Palazzo Affari ai Giureconsulti Piazza Mercanti, 2 - Milano
Owners are present in the company holding managing positions. Ownership Share 33,3 33,3 33,3 RIBOLLA SAPORITI ZAROLI
The first workshop
Total Area: 72.000 sqm Covered Area: 21.500 sqm
Total Area: 58.000 sqm Covered Area: 10.000 sqm Total Area: 10.000 sqm Covered Area: 600 sqm
Total Area: 35.000 sqm Covered Area: 11.000 sqm
Total Area: 60.000 sqm Covered Area: 37.000 sqm April 2008
Year Frequency Gravity index index 2004 3,2 98 2005 2,3 49 Gravity and safety index, k = 200.000 2006 2,4 44 2007 2 45
Location - SAUDI ARABIA 7.500 mm diameter, 13,5 m lenght, 126.000 Kg weight, UNS 31803 material, N. 1 powder treatment vessels, ASME “U” stamp
Location – Republic of Kazakhstan 1.778 mm diameter, material SA 516 Gr. 70 + 316L, supplied already equipped for rail transportation, weight 191.000 Kg Manufactured according to ASME and GOST standard
Location INDIA Number 2 of 3 rd stage separator vessel with internal refractory lining, 8.600 mm diameter, 11,2 m lenght, 180.000 Kg weight
Location – Brindisi Italy Length 17.500 mm, weight 131.700 Kg Carbon steel 516 Gr. 70 material
Location PAKISTAN Diameter 3.000 mm and 26 m length, 130.000 Kg, Internal weld overlay
Location OMAN Diameter 2.650 mm, 140 mm thickness, 15.8 m Lenght, 196.500 Kg weight Material DIN 17102 TSE 315 LT50
Location Sannazzaro (Pv) – Italy Column for benzene desulphurization plant 3.100 mm diameter, 39 + 2 mm Clad thickness, 29m lenght, 150.000 Kg weight Material A516 gr. 70 cladded A240 TP 304L
Location Abu Dhabi - UAE Column for DOE amine gas absorber “U” stamped 3.100 mm diameter, 36 + 4,5 mm Clad thickness, 33m lenght, 140.000 Kg weight
Heat Location Louisiana – USA Crude Styrene Condenser – ASME Stamp 4.318 mm diameter, 16,7 m length, 340.000 Kg weight
Location - Mantova - ITALY Internal diameter 3.800 mm, 200.000 Kg weight, Shell FE 410 UNI 5869 Clad Tp 304 Tube sheet : A182 F 304, Tubes: A213 TP304 Equipped with 10.021 tubes (1” dia, 16.5mm thick.) April 2008
Turn key plant Location - EGYPT Design & Fabrication of “MEG RECOVERY UNIT”
Location EGYPT LTCS material, 1.600 mm diameter, 18.7 m lenght
Location Russia N. 8 skids – Oil separation
Remote manifold skid Location KAZAKHSTAN 13 high pressure skids, according to ANSI B313/GOST, A333 Gr. 6 / A420 WPL6 / A350 LF2 material
Heat Recovery Steam Generator HRSG Location Vercelli – Italy For combined cycles and high efficiency. Modular shop construction for on-site assembly.
WHB boiler
FB boiler Location: Torviscosa - Italy
Polypropylene Plant Location POLAND Civil, mechanical, electrical, instrumental works, precommissioning, Commissioning & start-up of polypropylene plant and a polyethylene plant
Erection of steam generation recovery boiler Location Ponti sul Mincio – Italy
CFC steam generator Location Sulcis – Sardinia – Italy
FCCU plant Location – SWITZERLAND Supply, assembling at site and erection of pressure equipment (columns, reactors, strippers) for a FCCU Plant
350.000 EUR (.000) 300.000 250.000 "CORE" STAKES 200.000 TOTALE 150.000 100.000 50.000 0
(by Customer’s origin – Year 2007) Middle East West Europe 20% 18% USA 11% Italy 34% East Europe 9% Asia Africa 0% Far East 5% 3%
(by End User’s origin – Year 2007) West Europe 3% USA 8% Middle East East Europe 31% 11% Africa 7% Far East 12% Italy 18% Asia South America 0% 10%
(Year 2007)
Year 2007