second avenue subway
play

Second Avenue Subway Quarterly Public Workshop October 21, 2015 1 - PowerPoint PPT Presentation

Second Avenue Subway Quarterly Public Workshop October 21, 2015 1 Current Project Status Overall Construction Progress is 87.8% complete as of 10/1/2015. All 10 SAS Contracts have been awarded for Phase 1 5 Construction


  1. Second Avenue Subway Quarterly Public Workshop October 21, 2015 1

  2. Current Project Status • Overall Construction Progress is 87.8% complete as of 10/1/2015. • All 10 SAS Contracts have been awarded for Phase 1 • 5 Construction Contracts Completed: − Tunnel Boring Machine Tunneling − 86 th St Excavation, Utility Relocation, and Road Decking − 96 th St Site Work and Heavy Civil − 72nd St Cavern Mining, Tunnels and Heavy Civil (1/14/14) − 86 th St Cavern Mining & Heavy Civil (12/16/14) MTA Capital Construction 2

  3. Station Renderings 72 nd Street Platform Level 86 th Street Mezzanine - South Go to http://www.mta.info/SAS and click on Vision Gallery 63 rd Street Mezzanine Fare Array 96 th Street Proposed Art Installation 3 3 Artist – Sarah Sze, MTA Arts & Design commissioned work

  4. Q-Line Service and Connections • The Re-routed Q train will travel from the new 96 th Street Station south through Manhattan and into Brooklyn, terminating at Coney Island. 4

  5. Community Information Center • 14,100 visitors to date • 85 presentations and events conducted, including 48 presentations to school groups with over 1,600 students attending • New exhibit coming next month Hours Monday: 10AM - 6PM Tuesday: 11AM - 7PM Wednesday: 10 AM - 6PM Thursday: 11AM - 7PM Friday: 10AM - 6PM Saturday: 11AM - 3PM* Sunday: Closed Closed most public holidays *Open the second Saturday of every month. 5 Opened July 2013 5

  6. Second Avenue Subway Simulator Tournament • First and second place winners from three age groups received $100 and $50 gift certificates • Marianne Vera Salon, Le Tarte Flambée, The Penrose, Eneslow Shoes, Beach Café, Grace’s Marketplace supplied the gift certificates • Tournament covered by News 4 New York and Fox 5 News 6

  7. Community Tours • We have hosted 55 tours with 1,700 participants to date A marriage proposal took place in the 86 th Street cavern • • Make sure you are on the SAS email list: outreach@2Avesubway.com 86 th Street Cavern Tour October 11, 2014 7

  8. 96 th Street Station Area MTA Capital Construction 8

  9. Ancillary Building #2 Construction and Rendering SW corner 97th Street and Second Avenue MTA Capital Construction 9

  10. Entrance 1 Escalator and Stair Installation SW corner 94 th Street and Second Avenue 10 9/4/2015

  11. 9/15/2015 Entrance 2 Escalators - NE corner of 94 th Street and Second Avenue 11 11

  12. Street utility work - west side of Second Avenue ??? 2015 12 Between 93 rd and 92 nd Streets looking south

  13. Street restored after work moved to west side of Second Avenue East side of Second Avenue at 97th Street looking north 13 13

  14. 86 th Street Station Area MTA Capital Construction 14

  15. Installation of electrical, HVAC ducts and service carries continues MTA Capital Construction 15 15

  16. Escalator Installation – Platform to Mezzanine 16 16

  17. Elevator Construction Entrances at Yorkshire Building at 86 th Street MTA Capital Construction 17 17 looking East

  18. 72 nd Street Station Area MTA Capital Construction 18

  19. Ancillary 2/Entrance 2 at northwest corner of 72 nd Street and Second Ave – construction and rendering MTA Capital Construction 19 19

  20. 72 nd Street Station Area Main Cavern – Mezzanine level service carrier frame installation 20 20

  21. 72 nd Street Station Area Main Cavern (platform level) – Granite floor tile installation 21 21

  22. 72 nd Street Station Area Entrance 1 (northeast corner of 69th Street and Second Avenue) incline viewed from main cavern 22 22

  23. Lexington Ave / 63 rd Street Station Area MTA Capital Construction 23

  24. 63rd Street Station Area South side of 63rd Street between Lexington and Park Avenue (between 128 E. to 116 E. 63rd Street) North side of 63rd Street between Lexington and Park Avenue (in front of 123 and 125 E. 63rd Street) MTA Capital Construction 24 24

  25. 63rd Street Station Area Entrance – Northwest corner of 63 rd Street and Third Avenue – and rendering of adjoining plaza MTA Capital Construction 25

  26. 63rd Street Station Area Escalator installation at Entrance 1 – Southeast Corner of 63 rd Street and Third Avenue MTA Capital Construction 26 26

  27. Station rehabilitation includes new track slide wall Lower level platform – Q track 27 27 June 2015

  28. CONTRACT 3: 63rd Street Station 28 28

  29. Second Avenue Subway Email distribution list: outreach@2Avesubway.com 29

Recommend


More recommend