Route 5 3 1 Term inus Route 5 3 1 Term inus I m provem ent Project Public I nform ation Meeting Septem ber 3 0 , 2 0 1 0 New York State Departm ent of Transportation I n Cooperation w ith The Federal Highw ay Adm inistration The Federal Highw ay Adm inistration
W elcom e and I ntroduction Kevin Bush Regional Design Engineer g g g Route 5 3 1 Term inus I m provem ent Project – 9 / 3 0 / 1 0
Meeting Overview Paul Moore Meeting Facilitator g Route 5 3 1 Term inus I m provem ent Project – 9 / 3 0 / 1 0
Project Overview Dan Farrelly Project Design Engineer j g g Route 5 3 1 Term inus I m provem ent Project – 9 / 3 0 / 1 0
Route 5 3 1 Term inus Potential Location Specific I m provem ents Route 31 Improvements (Future) Consider median treatments to enhance safety between eastbound and westbound travel lanes Route 531 Terminus Improvements (2012) Partial Interchange with Route 36 g Route 36 / Colby Street (Future) Consider Roundabout or other safety improvements Route 5 3 1 Term inus I m provem ent Project – 9 / 3 0 / 1 0
Purpose and Needs Statem ent Purpose and Needs Statem ent � To improve safety by reducing the number � To improve safety by reducing the number and severity of accidents � To reduce congestion at the Route 531 terminus � To safely transition from a high speed expressway to a two-lane rural arterial l l l Route 5 3 1 Term inus I m provem ent Project – 9 / 3 0 / 1 0
Route 5 3 1 / 3 6 Accident Diagram / g Route 531 Route 5 3 1 Term inus I m provem ent Project – 9 / 3 0 / 1 0
Route 3 1 / 3 6 Accident Diagram / g Route 31 Route 5 3 1 Term inus I m provem ent Project – 9 / 3 0 / 1 0
Alternatives Evaluated During Alternatives Evaluated During Project Scoping • At-Grade interchange • Grade Separated half diamond interchange • Grade Separated full diamond interchange Route 5 3 1 Term inus I m provem ent Project – 9 / 3 0 / 1 0
Route 3 1 I m provem ents from Route 3 1 I m provem ents from new Route 5 3 1 I nterchange to east of Route 2 6 0 to east of Route 2 6 0 � Necessary to provide a safe transition y p from the expressway to Route 31 � Necessary to enhance safety from Gallup Necessary to enhance safety from Gallup Road to east of Route 260 Route 5 3 1 Term inus I m provem ent Project – 9 / 3 0 / 1 0
Project Schedule Project Schedule Public Hearing Summer 2011 Summer 2011 Construction Construction Spring 2013 thru Fall 2014 Route 5 3 1 Term inus I m provem ent Project – 9 / 3 0 / 1 0
Presentation of Alternatives Dave Balthaser Dave Balthaser Stantec Consulting Route 5 3 1 Term inus I m provem ent Project – 9 / 3 0 / 1 0
Half Diam ond Alternative Route 3 1 Continuous C Connector t D i Driveway access Roadway Modify Traffic Signal Signal Half Diamond Interchange Route 5 3 1 Term inus I m provem ent Project – 9 / 3 0 / 1 0
Full Diam ond Alternative Full Diam ond Alternative Route 3 1 Com bined w ith Route 5 3 1 Cul-de-sac Cul-de-sac Modify Traffic Signal Full Diamond Interchange Route 5 3 1 Term inus I m provem ent Project – 9 / 3 0 / 1 0
Full Diam ond I nterchange Full Diam ond I nterchange Route 5 3 1 / Route 2 5 9 View Route 5 3 1 Term inus I m provem ent Project – 9 / 3 0 / 1 0
Route 3 1 I m provem ents Route 3 1 I m provem ents Route 3 1 I m provem ents Route 3 1 I m provem ents Gallup Road to Salm on Creek Road Gallup Road to Salm on Creek Road CARDs ROW w/o Access Raised median Third center turn lane Route 5 3 1 Term inus I m provem ent Project – 9 / 3 0 / 1 0
Route 3 1 I m provem ents R Route 3 6 to east of Gallup Road t 3 6 t t f G ll R d Widen Route 31 on the south, for a raised median � Acquire Right of Way without access (no driveways) q g y ( y ) � from the new interchange to Gallup Road Hubbell Road Access – currently under discussion with � Monroe County) y) Route 5 3 1 Term inus I m provem ent Project – 9 / 3 0 / 1 0
Route 3 1 I m provem ents G ll Gallup Road to Salm on Creek Road R d t S l C k R d Widen Route 31 to provide a center turn lane and turn � pockets for the intersections and improve residential pockets for the intersections and improve residential driveway access Route 5 3 1 Term inus I m provem ent Project – 9 / 3 0 / 1 0
Route 3 1 I m provem ents S l Salm on Creek to Route 2 6 0 C k t R t 2 6 0 Provide Centerline Audible Roadway Delineators � (CARDs) between traffic flow from Salmon Creek Road (CARDs) between traffic flow from Salmon Creek Road to Campbell Road. CARDs placed where the double yellow lines are used � Reduce sideswipe and head-on accidents Reduce sideswipe and head on accidents � � Campbell Road CARDs Route 5 3 1 Term inus I m provem ent Project – 9 / 3 0 / 1 0
Discussion of the Tw o Discussion of the Tw o Alternatives and Route 3 1 I m provem ents Paul Moore Paul Moore Meeting Facilitator Route 5 3 1 Term inus I m provem ent Project – 9 / 3 0 / 1 0
Discussion of the Half Discussion of the Half Diam ond Alternative • Pads of Paper & Pencils Pads of Paper & Pencils • Verification of the design Verification of the design • Introduce yourself to your neighbor y y g • Discussion with your neighbor • Complete forms, pass to the center Route 5 3 1 Term inus I m provem ent Project – 9 / 3 0 / 1 0
Half Diam ond Alternative Half Diam ond Alternative Route 3 1 Continuous Route 5 3 1 Term inus I m provem ent Project – 9 / 3 0 / 1 0
Discussion of the Full Diam ond Discussion of the Full Diam ond Alternative • Pads of Paper & Pencils • Pads of Paper & Pencils • Verification of the design g • Introduce yourself to your neighbor • Discussion with your neighbor • Complete forms, pass to the center Route 5 3 1 Term inus I m provem ent Project – 9 / 3 0 / 1 0
F ll Di Full Diam ond Alternative Route 3 1 d Alt ti R t 3 1 com bined w ith Route 5 3 1 Route 5 3 1 Term inus I m provem ent Project – 9 / 3 0 / 1 0
Discussion of the Route 3 1 Discussion of the Route 3 1 I m provem ents • Pads of Paper & Pencils Pads of Paper & Pencils • Verification of the design Verification of the design • Introduce yourself to your neighbor y y g • Discussion with your neighbor • Complete forms, pass to the center Route 5 3 1 Term inus I m provem ent Project – 9 / 3 0 / 1 0
Route 3 1 I m provem ents Route 3 1 I m provem ents Gallup Road to Salm on Creek Road Route 5 3 1 Term inus I m provem ent Project – 9 / 3 0 / 1 0
Panel Question and Answ ers Panel Question and Answ ers Route 5 3 1 Term inus I m provem ent Project – 9 / 3 0 / 1 0