Presentation of CEI Services for Wiles Road from Riverside Drive to Rock Island Road Broward County, FL RLI NO. J211239P1
Wiles Road II Wiles Road II Outline Eisman & Russo’s Experience I. Experience and Qualifications with Roadway Construction a. Eisman & Russo b. Individual Team Members • Principal with Eisman & Russo II. Construction Management Approach • Over 20 Years in South East Florida a. Scope b. Utility • Largest CEI Division of Eisman & Russo c. Coordination d. Environmental • Extensive FDOT Roadway Construction III. Challenges and Solutions • Broward County Highway Engineering a. Scope • Municipal Roadway Construction b. Utility c. Coordination d. Environmental Experience and Qualifications Where Commitment And Action Meet
Wiles Road II Eisman & Russo’s Experience SR-7/US 441 Pembroke Road from SW 145 th Avenue to Reconstruction from Fillmore Street to Silver Shore Boulevard Stirling Road Broward, County Broward, County NW 57 th Avenue/Red Education Corridor Road From Okeechobee Improvements, Boulevard to West 29 st Coconut Creek. Street. Broward, County Miami Dade, County Experience and Qualifications
Wiles Road II Team Member’s Experience Organization Chart Broward County HCED Project Manager Manuel Fontan, P.E. CEI Project Manager J. Scott Gombar, P. E. QA/QC Team J. Scott Gombar, P. E. Senior Project Engineer Testing Lab – GCES Engineering Services (CBE) Ido Shimony, P. E. Leo Offredi, P. E. Survey – Aylward Engineering & Survey (CBE) Chris Charvat Aerial Photograph – Smith Aerial Photograph Project Engineer Guillermo Villanueva, EI Inspector Contract Senior Inspectors Peter S. McIntosh Compliance/Administrative Kyle Wann Assistant William Rhoades Marielena Gombar Experience and Qualifications
Wiles Road II Team Member’s Experience Qualifications/Certifications IMSA Traffic Signal IMSA Traffic Signal Nuclear Radiation CTQP Drilled Shaft Eisman & Russo, Inc. Florida Advanced CTQP Earthwork CTQP Earthwork CTQP Concrete / CTQP Asphalt CTQP Asphalt Paving Level 1 Paving Level 2 FDOT Critical CTQP Final Technician 1 Estimates 1 Estimates 2 ACI Level 1 CTQP Final Structures FDOT Prequalification Inspection CTQP QC Inspector Manager NPDES Level 1 Level 2 Safety MOT 10.1 Roadway Construction Engineering Inspection Position CEI Staff J. Scott Gombar, P. E. Project Manager Senior Project Leo Offredi, P. E. Engineer Project Engineer Guillermo Villanueva, E.I. S S S KyleWann S Senior Roadway Inspectors William Rhoades Roadway Peter McIntosh S Inspectors S = Scheduled Experience and Qualifications
Wiles Road II Team Member’s Experience Leonardo Offredi, P.E. – Senior Project Engineer 16 years of experience in bridge and roadway construction Identical current experience to Wiles II project Experience working with Broward County / No learning curve Experience working with FPL, FPL Fibernet, AT&T, TECO, Comcast, Broward County Traffic, SBDD, SFWMD Experience with Complete Streets Takes Ownership of Project Establish Project Specific Goals Manage Schedule and Budget Experience and Qualifications
Wiles Road II Team Member’s Experience Leo Offredi, P.E. Roadway Utility Drainage Earthwork Asphalt Signalization Lighting Construction Experience Relocation SR-7 Reconstruction from Fillmore X X X X X X Street to Stirling Rd. Pembroke Road from SW 145 th X X X X X X Avenue to Silver Shores I75 Express Lanes Segment D X X X X X X NW 135 th Street, Opa-Locka X X X X X X Experience and Qualifications
Wiles Road II Team Member’s Experience Guillermo Villanueva, EI –Project Engineer 11 years of experience in bridge and roadway construction CEI Project Engineer for I-75 Express lanes Project Contractor Project Engineer/Manager Successful partnering with Contractor Established trust with Contractor Has worked on numerous road and bridge projects with construction costs from $32-$86 M Experience working with FPL, Broward County Traffic, SBDD, SFWMD Experience in Scheduling Review Monthly Pay Requisitions Experience and Qualifications
Wiles Road II Team Member’s Experience Guillermo Villanueva, EI Roadway Utility Construction Experience Drainage Earthwork Asphalt Signalization Lighting Relocation SR 826 Palmetto Expressway (Coral Way 24 th St. to X X X X X X Tamiami Trail 8 th St. ) Beach Blvd./Kernan Blvd. X X X X X X Interchange SR 589 Veterans Expressway X X X X X X I75 Express Lanes Segment D X X X X X X Experience and Qualifications
Wiles Road II Team Member’s Experience Inspection Staff Kyle Wann 8 years of Experience Senior Inspector for Pembroke Road Project William Rhoades 21 years of Experience Senior inspector for Education Corridor Improvements in Coconut Creek Peter McIntosh 18 years of Experience Earthwork specialist for I-75 express lanes and Eller Drive projects Tested and inspected over 25,000 LF of drainage and 426 drainage structures Experience and Qualifications
Wiles Road II I. Experience and Qualifications II. Construction Management Approach III. Challenges and Solutions
Wiles Road II III. Coordination I. Scope MOT Traffic Control Phasing • Adjacent Project Drainage Widening • Motorists Traffic Milling and Resurfacing • Pedestrian Traffic Signalization and Lighting • Business Access Complete Streets Stakeholders II. Utilities • Homeowners Associations • Business FPL • Broward County Transit / Broward County Schools FPL Fibernet AT&T • Emergency Services TECO Gas IV. Environmental Comcast Red Lichen Sanctuary City of Coral Springs NPDES Advanced Cable Construction Management Approach
Wiles Road II Scope Traffic Control Phasing Phase I Phase III Phase II Phase IV Construction Management Approach
Wiles Road II Scope Drainage • 2,400 feet of Drainage Pipe • Connecting to Existing Drainage • New Drainage • 1,000 feet of French Drain Construction Management Approach
Wiles Road II Scope Widening Earthwork Curb and Gutter Sidewalk Construction Gravity wall construction Construction Management Approach
Wiles Road II Scope Milling and Resurfacing Overbuild Straightedge and Cross Slope Control Construction Management Approach
Wiles Road II Scope Signalization and Lighting Riverside Intersection W. Leiter Intersection Lighting installation on North side of project Construction Management Approach
Wiles Road II Utilities • FPL • FPL Fibernet • AT&T • TECO Gas • Comcast • City of Coral Springs • Advanced Cable Construction Management Approach
Wiles Road II Coordination • MOT • Adjacent Project • Motorists Traffic • Pedestrian Traffic • Business Access Construction Management Approach
Wiles Road II Coordination • Stakeholders • Broward County • EOR • Homeowners Associations • Business • Broward County Transit • Broward County Schools • Emergency Services Construction Management Approach
Wiles Road II Environmental Red Lichen Sanctuary / NPDES Construction Management Approach
Wiles Road II I. Experience and Qualifications II. Construction Management Approach III. Challenges and Solutions i. Scope ii. Utilities III. Coordination IV. Environmental
Wiles Road II Scope • Challenge: • Drainage Structure S-417 Conflict with Utilities • • Solution: • Drainage • Communication between contractor and utility companies/agencies Challenges and Solutions
Wiles Road II Scope • Challenge: • Solution: • Milling and Resurfacing • Milling and Resurfacing • Straight edge deficiencies at manholes Inspection staff to measure manhole lid • elevation at all locations Challenges and Solutions
Wiles Road II Scope • Challenge: • Signalization • Plans do not include existing signal for Pedestrian between E. Leitner and NW 74 th Avenue • Solution: • Signalization • Coordinate with EOR before project commences Challenges and Solutions
Wiles Road II Utilities • Challenge: • Solution: • Installation of new concrete • Review Commitments with County FPL poles from west project • Review Utility Work Schedules limit to 255+00 (1600 feet) • Pre-Activity meeting with utilities and contractor Utilities participate Progress meetings • Challenges and Solutions
Wiles Road II Coordination MOT • Challenge: • Phasing coordination with existing Wiles Rd project • Lane closure conflict with existing Wiles Rd project • Solution: • Invite CEI and Contractor of Wiles Rd I project • First item of discussion is MOT Coordination between Projects Challenges and Solutions