PAYANDAN 1. Company Background Creative Path to Growth
Payandan Shareholders PAYANDAN Payandan’s shares belong to Mostazafan Foundation of Islamic Revolution. • Mostazafan Foundation owns 49% • Sina Energy Development Company owns 51% Mostazafan Foundation of Islamic Revolution Sina Energy Development Company PAYANDAN
Mostazafan Foundation of Islamic Revolution PAYANDAN SEDCO Sina Financial Paya Saman Pars (Oil & Gas) & Investment Co (Road & Building) Sina Food Industries Iran Housing Group Saba Paya Sanat Sina (Power & Electricity) (Tire, Tiles, Glasswork, Textile, Etc) Ferdos Pars Sina ICT Group (Agriculture) Parsian Tourism Kaveh Pars & Transport Group (Mining) Alavi Foundation Alavi Civil (Charitable) Engineering Group
Sina Energy Development Holding Company PAYANDAN SEDCO as one of subsidiaries of The Mostazafan Foundation of Islamic Revolution is considered one of pioneer holding companies in area of oil & gas which aims on huge projects in whole chains of oil and gas. Payandan (Oil & Gas General Contractor) North Drilling (Offshore Drilling) Pedex (Onshore Drilling) Behran (Oil Refinery Co) Dr Bagheri Coke Waste Water Refining Co SEDCO Managing Director
Payandan in Numbers PAYANDAN +40 1974 Years ESTABLISHED +1400 +4000 EMPLOYEES CONTRACTOR +200,000,000 $ ANNUAL TURNOVER 75 COMPLETED PROJECTS
Company Background PAYANDAN • 56 ” Saveh-Loushan • South Pars – SP No. 14 • 48 ” Zanjan-Mianeh Pipeline Pipeline (190KM) • South Pars – SP No. 13 • 56" Dezfoul- Kouhdasht Pipeline (160KM) 1974 1996 2003 2005 2007 2009 2011 2013 2015 2017 • F & G Lavan • 56 ” Asaluyeh • Nargesi Gas • South Pars – SP Pipeline Gathering & No. 17 & 18 Injection • 30 ” Iran - • South Pars – SP No. 22,23,24 Payandan is Armenia • 48 ” Iraq Pipeline Naftkhane- established (oil and Pipeline gas contractor) Baghdad (63KM) (113KM) • 56 ” Naeen-Tehran Gas Pipeline (133KM) • Parsian Gas Refinery • 56 ” Loushan-Rasht Gas Pipeline (81KM) • Pars Petrochemical Port • Arak Shazand Refinery • Kangan Gas Compressor Station • South Pars – SP No. 15 & 16 • Sardasht Gas Compressor • 500,000 BBL Oil Storage Tank in Lavan Island • Well Head Facilities, Gas Gathering & Station • 56 ” Kazeroun-Nourabad Injection in Lavan Island Pipeline (136KM) • 56 ” Genaveh-Aghajari South Pars Projects (PC) Pipeline (156KM) Gas Refinery (C)
Contracting Competency Certificate PAYANDAN 1. Class I in Gas & Petroleum Field • Transfer Lines & Reservoirs, Gas & Petroleum Networks • Gas, Petroleum, Petrochemical Refineries 2. Class I in Construction & Building 3. Class I in Installations & Equipment
Company Chart PAYANDAN Dr Mousavi Managing Director
PAYANDAN 2. Payandan Values What we believe in
Values PAYANDAN Integrity Long-Term Innovation Relationships Health VALUES Organizational HSE Excellence Social Safety EFQM Responsibility ISO Environment Standards
Values PAYANDAN Integrity Acting with honesty and in an ethical manner Social Responsibility Contributing to society, and behaving in socially responsible ways Innovation Encouraging creativity and innovative ideas Organizational Excellence Pursuing continual improvement HSE Ensuring occupational health and safety, and protecting the environment Long-Term Relationships Seeking long-term relationships by creating trust
PAYANDAN 3. Machineries & Facilities The power of the machinery and facilities we use
PAYANDAN Machineries
Machineries PAYANDAN Some of Payandan Machineries Loader 13 Sideboom 46 14 Crane Excavator 11
Machineries PAYANDAN 405 Rectifier 188 Generator 9 Truck and Trailer 79 Tower Crane
Machineries & Equipment PAYANDAN No Name Producer Model Count 1 Sideboom Komatsu- Cat- B.A. - F.A. D9 or 355 46 2 Bulldozer Komatsu- Cat- Hepco D7 or D10 3 Excavator Komatsu - Hyundai- Daewoo Different Models 3 11 4 Grader Cat -Hepco Different Models 1 5 Loader and Mini Loader Cat- Hyundai- Volvo Different Models 13 6 Bending Machine CRC 8 to 56 inches 4 7 Crane Tadano- Kato- Benz 3 to 30 tons 14 Forklift Komatsu - Daewoo- Hyster 3 to 7 tons 8 1 9 Pay Welder Fiat Different Models 3 10 Internal Clamp Vikma- CRC 10 to 56 inches 11 11 External Clamp A.I. 6 to 56 inches 35 12 Welding Mig Machine GAM Electric 500 amp 36 Welding Set Lincoln- Miller- Hobart 400 to 500 amp 13 16 14 Rectifier G.E. - Cara 630 amp 405 15 Generator Volvo- Cat- GM- Perkinz- Benz- Komatsu- Cummenis 30 to 700 KVA 188 16 Compressor Ingersourland- I.S. – Atlas- Pars- Cat- Sulair CFM 175 to 1750 16 17 Concrete Pump Schwing Different Sizes 3 Hydraulic Hammer NPK- Forokava Different Models 18 6 Truck-Trailer Mack- Scania- Benz - Volvo Different Models 16 19 20 Truck Mixer Benz- Mac 6 to 11 cubic meters 15 21 Truck - Fuel Tank Benz- Amico Different Models 48 22 Pickup Truck (2 & 4WD) Toyota- Pars- Mazda- Nissan Single or Double Cabin 80 Vehicle (4WD) Pars – Nissan- Jeep- Korando- Toyota- Sozuki- Kia Different Models 23 55 Vehicle Ikco- Saipa Different Models 63 24 25 Ambulance Mazda- Toyota- Nissan Land Cruiser - Patrol 13 _ 26 Bus - Mini Bus - Van Volvo- Benz 8 _ 27 Tractor Romani- M.F. 8 Batching Machine Rah Machine- Liebherr 30 Cubic Meters per Hour 28 3 Tower Crane Potain 8 and 12 tons 29 9 30 Tower Light Kubota 4 Projector 15 31 Road roller Mikasa – Hepco – Bomag – Three Star Different Models 24 32 Fire Engine Iveco - 2
Facilities PAYANDAN Khouzi Steel Structure Factory Asaluyeh Central Warehouse Kangan Warehouse Kangan Spoolshop
Facilities PAYANDAN Khouzi Steel Structure Factory Mohr, Iran Production Capacity: 2000 ton/month 19500 m 2 Area: Workshops: 3100 m 2 2200 m 2 Residential Camp: Offices: 340 m 2 Steel Structure production for projects in Asaluyeh Area such as: South Pars Gas Field Development Phases: 13, 14, 15-16, 17-18, 22-23-24
Facilities PAYANDAN Payandan Asaluyeh Central Warehouse Asaluyeh, Iran 24000 m 2 Area: 3000 m 2 Covered Warehouse 520 m 2 Residential Camp
Facilities PAYANDAN Kangan Warehouse Kangan, Iran 90000 m 2 Area: 2000 m 2 Covered Warehouse: 2x250 m 2 ColdRoom
Facilities PAYANDAN Kangan Spoolshop Kangan, Iran 30000 m 2 Area: 4x3000 m 2 Covered Workshops Workshops: 1 Shot Blast Workshop 8x10 tons Cranes Production Capacity: 2000 dia/inch per day
PAYANDAN 4. Projects A glimpse of what we have achieved so far
Projects PAYANDAN R e f i n e r y & P e t r o c h e m i c a l P i p e l i n e W e l l h e a d S t o r a g e T a n k F a c i l i t i e s
PIPELINE PROJECTS PAYANDAN 43 Total Projects: +6000 KM Total Pipeline Projects Length: +600 M$ Total Contract Value:
56 ” Dezfoul-Kouhdasht Gas Pipeline (PC) PAYANDAN Client: Naftanir / Iranian Gas Engineering & Development Company Duration: 11 Months Start: 2014 Location: Khouzestan, Iran Price: 70,000,000 $ The project is part of IGAT VI (Iran Gas Allover Trunk line) and using API5LX70 steel pipes its length riches 160km. the main parts of project include: • 6 valve stations • 1 launcher station • 1 receiver station • 2 interconnections • 2 cathodic protection stations • 30 km power transmission line • Telecommunication buildings • 160 km optical fiber cable
48 ” Iraq Gas Pipeline (C) PAYANDAN The 48 ” pipeline starts near Iran-Iraq border and its API5LX65 steel pipes continue for 68 km. The project includes: • 1 launcher station • 1 launcher & receiver station • 2 mainline valve stations • 1 C.P Station Client: ICG Group Iraq Oil Ministry Duration: 12 Months Start: 2012 Location: Iraq Price: 13,000,000 $
30 ” Iran - Armenia Gas Pipeline (EPC) PAYANDAN Client: National Iranian Gas Company The project is part of gas export pipeline Duration: 21 Months which starts from Tabriz compressor station Start: 2005 (in Iran) to the border of Armenia for total Location: Tabriz, Iran length of 115 kilometers API5LX52 steel Price: 49,000,000 $ pipes. It transfers 10 million cubic meters of natural gas to Armenia. Payandan was successful in reduction of execution time from 900 days to 650 days.
Refinery and Petrochemical Projects PAYANDAN 12 Total Projects: Total Contract Value: 1180 M$
Parsian Gas Refinery (EPC) PAYANDAN Parsian Gas Refinery 1 Project is constructed in the south of Fars province to receive and refine 1520 MMCF/day sweet gas from Tabnak oil reservoir. The project was completed in partnership with IPMI. The construction part of the project includes: • Building: 32,000 m² • Concrete work: 40,000 m³ Client: National Iranian Gas Company (NIGC) • Mechanical equipment: 4,000 tons Duration: 45 months • Steel structures: 8,500 tons Start : 2003 • Location: Lamerd, Iran Piping: 200,000 in-dia Price: 101,000,000 $ • Cabling: 330 km • Instrument and electrical system • F&G system
Top Deck Installation of Pars Petrochemical Port (EPC) PAYANDAN