part 2 neighborhood framework update
play

PART 2: NEIGHBORHOOD FRAMEWORK UPDATE ROSA PARKS - CLAIRMOUNT - PowerPoint PPT Presentation

PART 2: NEIGHBORHOOD FRAMEWORK UPDATE ROSA PARKS - CLAIRMOUNT | 27 COMMUNITY ENGAGEMENT | WHAT WE HEARD SO FAR 7 NEIGHBORHOOD AGENCY TABLES THIS FRAMEWORK PRODUCES/ ENABLES: 3 PUBLIC STABILITY: Restore existing housing &


  1. PART 2: NEIGHBORHOOD FRAMEWORK UPDATE ROSA PARKS - CLAIRMOUNT | 27

  2. COMMUNITY ENGAGEMENT | WHAT WE HEARD SO FAR… 7 NEIGHBORHOOD AGENCY TABLES THIS FRAMEWORK PRODUCES/ ENABLES: 3 PUBLIC STABILITY: Restore existing housing & develop FORUM MEETINGS affordable, diverse housing options 10 OPPORTUNITY: Attract Mixed Use development ADVISORY + FOCUS GROUP MEETINGS CONVENIENCE: Expand Neighborhood Retail 12 What we heard from residents: WEEKS ON-SITE COHESION: Reactivate the Landscape OPEN OFFICE • We value our neighbors and want to stay HOURS • S afety 7 SAFETY: Provide safe passage that connects • Address vacant buildings, home & land people to key neighborhood destinations RESIDENT • Maintain continuity of the architectural style of existing housing STORY TELLING • Bring back neighborhood amenities, such as retail and educational centers SESSIONS ROSA PARKS - CLAIRMOUNT | 28

  3. COMMUNITY ENGAGEMENT | WHAT WE HEARD PLACEHOLDER RESIDENT PHOTOS + QUOTES ROSA PARKS - CLAIRMOUNT | 29

  4. NEIGHBORHOOD IDENTITY | 12 TH STREET HERITAGE 12 TH St. CLAIRMOUNT TAYLOR HAZELWOOD ROSA PARKS - CLAIRMOUNT | 30

  5. PRESENTATION CONTENTS  STRATEGY 1: CONNECT NEIGHBORHOODS BY IMPROVING ROS A (12 TH S P ARKS T .)  STRATEGY 2: PROMOTE DEVELOPMENT EAS T OF THE LODGE  STRATEGY 3: S TRENGTHEN NEIGHBORHOOD RETAIL  STRATEGY 4: CREATING GREAT NEIGHBORHOOD P ARKS ROSA PARKS - CLAIRMOUNT | 31

  6. STRATEGY 1 CONNECT NEIGHBORHOODS: IMPROVING (12 TH S ROS A P ARKS T .) ROSA PARKS - CLAIRMOUNT | 32

  7. LOCAL CONNECTIVITY | ROSA PARKS BLVD. ROAD BOND PROJECTS: A ROSA PARKS STREETSCAPE IMPROVEMENTS A • LANDS CAPED MEDIAN + S TREET TREES • 12 TH S T . S IGNAGE/ BRANDING • PROTECTED BIKE LANES • ENHANCED CROS S ING AT PINGREE S T . B REDESIGN INTERSECTION AT GRAND BLVD. B ROSA PARKS - CLAIRMOUNT | 33

  8. PROJECT A | ROSA PARKS (12 TH STREET) STREETSCAPE PROTECTED LANDS CAPED MEDIAN & BIKE LANES S TREET TREES 12 TH S T . BRANDING ENHANCED & S IGNAGE CROS S WALK ROSA PARKS - CLAIRMOUNT | 34

  9. VIRGINIA PARK PLAZA | EXISTING CONDITIONS 1 CONNECT NEIGHBORHOOD TO COMMUNITY AS S ETS 2 PROVIDE S AFE P AS S AGE 3 BEAUTIFY 12 TH S TREET NEIGHBORHOOD ROSA PARKS - CLAIRMOUNT | 35

  10. VIRGINIA PARK PLAZA | EXISTING CONDITIONS Virginia Park Plaza Before: Virginia Park Plaza Existing Entry Condition ROSA PARKS - CLAIRMOUNT | 36

  11. VIRGINIA PARK PLAZA PROPOSED PROMENADE $500K $500K CAPI APITAL FUND UNDING NG 1 Proposed Virginia Park Plaza Promenade 2 CREATE FRONT DOOR S UPPORT VPP ACCES S TO BUS INES S COMMUNITY CORE REVITALIZATION ROSA PARKS - CLAIRMOUNT | 37

  12. VIRGINIA PARK PLAZA | EXISTING CONDITIONS SENIOR HOUSING VIRGINIA PARK PLAZA MEDICAL CENTER REC. CENTER PARK & SPLASH PAD ROSA PARKS - CLAIRMOUNT | 38

  13. VIRGINIA PARK PLAZA PROMENADE P SENIOR HOUSING P VIRGINIA PARK PLAZA GREEN S P ACE W/ TORIC 12 TH S MEDICAL HIS T . CENTER FOOTPRINT PROMENADE P CONNECTION FROM 12 TH S T . TO P ARK REC. CENTER P PARK & POP-UP MARKET S P ACE SPLASH PAD TORIC 12 TH S W/ HIS T . FOOTPRINT ROSA PARKS - CLAIRMOUNT | 39

  14. LOCAL CONNECTIVITY | ROSA PARKS BLVD. ROAD BOND PROJECTS: A ROSA PARKS STREETSCAPE IMPROVEMENTS A • LANDS CAPED MEDIAN + S TREET TREES • 12 TH S T . S IGNAGE/ BRANDING • PROTECTED BIKE LANES • ENHANCED CROS S ING AT PINGREE S T . B REDESIGN INTERSECTION AT GRAND BLVD. B ROSA PARKS - CLAIRMOUNT | 40

  15. PROJECT B | GRAND BLVD. INTERSECTION VD. VD. BL BL ARKS ARKS LOTHRUP AVE. LOTHRUP AVE. A P A P ROS ROS CLOS E NORTH- BOUND S ECTION OF ROS A P ARKS REDES IGN W. GRAND BL VD. W. GRAND BL VD. INTERS ECTION AT GRAND BL VD ADD BIKE LANES AND 2-WAY S TREET CONVERS ION FERRY PARK ST. FERRY PARK ST. EXISTING: North – S outh Traffic Pattern PROPOSED: Reconfigured Traffic Pattern ROSA PARKS - CLAIRMOUNT | 41

  16. REGIONAL CONNECTIVITY | ROSA PARKS BLVD $3.3 M ROAD BOND 3.5 MI. PROJECT LENGTH 2018 DES IGN 2019 INS TALL 1-WAY TRAFFIC 1-WAY TRAFFIC DPW 2-WAY TRAFFIC 2-WAY TRAFFIC EXISTING: NORTH – S OUTH TRAFFIC P ATTERN PROPOSED: RECONFIGURED TRAFFIC P ATTERN AGENCY ROSA PARKS - CLAIRMOUNT | 42

  17. REGIONAL CONNECTIVITY | WEST RIVERFRONT ROSA PARKS - CLAIRMOUNT | 43

  18. REGIONAL CONNECTIVITY | WEST RIVERFRONT ROSA PARKS - CLAIRMOUNT | 44

Recommend


More recommend