november 18 2015 joint base fort myer henderson hall to
play

November 18, 2015 Joint Base Fort Myer- Henderson Hall to the - PowerPoint PPT Presentation

November 18, 2015 Joint Base Fort Myer- Henderson Hall to the Pentagon Reservation 2 Joint Base Fort Myer- Henderson Hall to the Pentagon Reservation What the County will be getting : Two (2) 4-inch conduits each containing three 1.25 inch


  1. November 18, 2015

  2. Joint Base Fort Myer- Henderson Hall to the Pentagon Reservation 2

  3. Joint Base Fort Myer- Henderson Hall to the Pentagon Reservation What the County will be getting :  Two (2) 4-inch conduits each containing three 1.25 inch innerduct totaling 19,070 feet.  Two (2) 144 count loose tube fiber optic cables for the entire length.  Conduit and cable run from Clarendon’s Fire Station 4 to the Pentagon Reservation 3

  4. Conduit with Innerduct Conduit One Conduit Two 144 Strands 144 Strands Of Of Fiber Cable Fiber Cable 4

  5. Joint Base Fort Myer- Henderson Hall to the Pentagon Reservation Benefits the County and Base could receive from these facilities: • Enhanced communication capabilities • Redundancy • Computer aided dispatch • Interoperability 5

  6. Current Status, ConnectArlington 2.0 • Hand hole replacement completed (204 total) • All conduit proofed and repaired • 864 count fiber cable being installed now – Rosslyn to CHP complete, CHP to FS4 in progress • Cold weather moratorium approx. Dec ‘15 - April ’16 • Planned completion Summer 2016 6

  7. Benefits of CA 2.0 for Dark Fiber Licensees  Security - highly secure, dedicated fiber that enables collaboration with the nation's top defense and research agencies  Cost savings - access to varied, competitive pricing options to improve your bottom line  Speed - enables transmission far greater than those currently offered with the right equipment  Scalability - dedicated bandwidth allows you to grow along with your business needs  Redundancy - allows for distinct fiber routes to increase reliability  Compliance - secure continuity of operations for those operating in regulated industries 7

  8. Recent Accomplishments & Work In-Progress • JBFM-HH DVP Easement and Conduit/Fiber • Virginia Tech Agreement/Interconnection • UMD/MAX Proposed Agreement • GMU Interest for Arlington Campus • Virginia Tech/Vornado Interest • Service Provider Interest • Fiber Management System Review & Analysis 8

  9. Fiber Optic Cable Pull – 864 fibers/cable 9

  10. Fiber Optic Cable Pull – Figure 8 Layout 10

  11. Fiber Optic Cable Pull – Handhole Pull Point 11