neighborhood storage project
play

NEIGHBORHOOD STORAGE PROJECT Hibbard Park & Community Rec - PowerPoint PPT Presentation

NEIGHBORHOOD STORAGE PROJECT Hibbard Park & Community Rec Center Underground Storage PRESENTATION OUTLINE 1. Summary of Hibbard Park Flood Storage 2. Community Rec Center Future Facility Assessment 3. Underground Storage Configuration 4.


  1. NEIGHBORHOOD STORAGE PROJECT Hibbard Park & Community Rec Center Underground Storage

  2. PRESENTATION OUTLINE 1. Summary of Hibbard Park Flood Storage 2. Community Rec Center Future Facility Assessment 3. Underground Storage Configuration 4. Next Steps

  3. HIBBARD PARK FLOOD STORAGE Underground Flood Storage = 10 acre-ft

  4. HIBBARD PARK SITE PLAN

  5. HIBBARD PARK PROGRAM ANALYSIS

  6. HIBBARD PARK PROGRAM DIAGRAM

  7. CONCEPT FACILITY ONE FLOOR

  8. EXISTING FACILITY

  9. CONCEPT FACILITY REVISED SCHEME A – TWO FLOORS

  10. CONCEPT FACILITY REVISED SCHEME B – TWO FLOORS

  11. CONCEPT FACILITY REVISED SCHEME C – TWO FLOORS

  12. UNDERGROUND STORAGE CONFIGURATION • Underground Storage • Volume = 10 acre-ft • Height of system = 5’8” • Average depth of cover ≈2 ft • No pump station required • Tree Survey • Completed March 2019 • Approximately 40 trees within footprint • Opportunities for replacement on perimeter • Existing Amenities Replaced • Skate park, parking, open space • Site drainage improvements • Geotechnical Analysis • Silty Clay/Lean Clay Soils • Groundwater varies

  13. NEXT STEPS Continue discussions with Park District • Site meeting on April 24, 2019 • 30% design development of underground storage •

  14. END OF PRESENTATION QUESTIONS?