MP-ECBC CELL Let’s build ‘ Tomorrow ’ presentation by Mr. Rajeev Ralhan Director, PwC India
MP-ECBC CELL HISTORY ENERGY CONSERVATION BUILDING CODE (ECBC)
MP-ECBC CELL HISTORY OF INDIA 233 450 1993 2000 values are of PRIMARY ENERGY DEMAND (in MTOE) source: world energy outlook reports
MP-ECBC CELL HISTORY OF INDIA 1250 - 1500 233 450 716 1993 2000 2020 2030 values are of PRIMARY ENERGY DEMAND (in MTOE) source: world energy outlook reports
MP-ECBC CELL HISTORY OF INDIA (values are of PRIMARY ENERGY DEMAND in MTOE) 233 1250 - 1500 450 716 2030 1993 2000 2020 770 MTOE 2012 source: world energy outlook reports
MP-ECBC CELL 233 450 In 2001 Nations’ 1993 2000 Energy Conservation Act source: world energy outlook reports
MP-ECBC CELL Energy Conservation Act, 2001 5 ENERGY DESIGNATED CONSERVATION CONSUMERS FUND STAR AND ENERGY LABELLING OF CONSERVATION APPLIANCES BUILDING CODE INSTITUTIONAL SETUP
MP-ECBC CELL Energy Conservation Act, 2001 5 ENERGY DESIGNATED CONSERVATION CONSUMERS FUND STAR AND ENERGY LABELLING OF CONSERVATION APPLIANCES BUILDING CODE INSTITUTIONAL SETUP
MP-ECBC CELL Energy Conservation Act, 2001 5 ENERGY DESIGNATED CONSERVATION CONSUMERS FUND STAR AND ENERGY LABELLING OF CONSERVATION APPLIANCES BUILDING CODE INSTITUTIONAL SETUP
MP-ECBC CELL Provide legal framework and Energy Conservation Act, 2001 institutional arrangement to embark energy efficiency drive Exert leadership and develop policies and provide direction to National Energy Conservation and Efficiency efforts and programs Section 15 of the Act empowers State Designated Agency to coordinate, regulate and enforce efficient use of energy and its conservation MPUVN State Designated Agency
MP-ECBC CELL JOURNEY OF MP-ECBC
MP-ECBC CELL JOURNEY OF ECBC IN MADHYA PRADESH Introduced Sensitization 2007 2007 2014 ECBC Workshops, 2007 Conferences were -2016 for the first time by organized BEE State Level 2007 2007 established Steering 2009 2016 ECBC CELL Committee (Arch. & Engg.) was established ECBC 2007 Progress 2007 2007 2010 Amendment from Lets Discuss! -2014 Document was 2016 prepared
MP-ECBC CELL JOURNEY OF ECBC IN MADHYA PRADESH Progress Steering MP-ECBC docs Situation prepared in both Committee From Analysis English and Meetings 2016 was performed Hindi were organised Integrated Demo- Amendments Enforcement Projects were made as per Mechanism with PWD & MPUVN ECBC -2017 with existing (under process) approval system Amendments Stakeholder were made as per NOTIFICATION Consultation ECBC Rules- (under process) for drafting MP- 2018 ECBC documents
MP-ECBC CELL MP-ECBC COMPLIANCE MECHANISM Difference between ECBC and MP-ECBC?
MP-ECBC CELL We should follow ECBC 2017 or MP-ECBC 2017 ?
MP-ECBC CELL INDIA 29 STATES and 7 UT’s STATES & UT’s DIVISIONS HOT-DRY WARM-HUMID COMPOSITE TEMPERATE COLD https://www.google.co.in/imgres?imgurl=https%3A%2F%2Fimage.slidesharecdn.com%2F01introduction-140504232059-phpapp02%2F95%2Fecbc01introduction-27- 638.jpg%3Fcb%3D1399245941&imgrefurl=https%3A%2F%2Fwww.slideshare.net%2Fmathangi_advit%2F01-introduction- 34276080&docid=ZRdAxMowv5FRcM&tbnid=xGePbqsqjL9tnM%3A&vet=10ahUKEwjE5a6bkqbdAhUZA4gKHfelAd4QMwhAKAIwAg..i&w=638&h=480&safe=active&bih=631&biw=1366&q=ECBC%20CLimatic%20zones &ved=0ahUKEwjE5a6bkqbdAhUZA4gKHfelAd4QMwhAKAIwAg&iact=mrc&uact=8
MP-ECBC CELL STATE OF MADHYA PRADESH 51 DISTRICTS ADMINISTRATIVE DIVISION Chambal Chambal division Sagar Gwalior Gwalior division Bhopal division Bhopal Ujjain division Ujjain Indore division Rewa Narmadapuram division Jabalpur division Shahdol division Rewa division Shahdol Sagar division Indore Narmadapuram Jabalpur http :// stcr.gov.in/farmer/HTML/Fertility_Maps_Macro/Maps/MadhyaPradesh/Madhya%20Pradesh%20P.JPG
MP-ECBC CELL Climatic Division of Madhya Pradesh Bhind Morena Gwalior Sheopur Datia Shivpuri Tikamgarh Rewa Hot-Dry Neemuch Ashoknagar Chhatarpur Satna Guna Climatic Sidhi Panna Mandsaur Vidisha Damoh Rajgarh regions Sagar Katni Composite Shahdol Ratlam Umaria Bhopal Ujjain Shajapur climatic Jabalpur Raisen Sehore Annupur Narsimhapur regions Indore Dindori Jhabua Hoshangabad Dewas Dhar Mandla Seoni Harda Chhindwara West East Barwani Nimar Betul Nimar Balaghat Burhanpur http :// stcr.gov.in/farmer/HTML/Fertility_Maps_Macro/Maps/MadhyaPradesh/Madhya%20Pradesh%20P.JPG
MP-ECBC CELL MP-ECBC COMPLIANCE MECHANISM MP-ECBC IN BRIEF
MP-ECBC CELL New Construction having Connected Load of 100kW or above New Construction Existing Buildings OR need to renew its Existing connected load because Buildings of addition/alteration (Addition / Alteration) due to which its connected load will be 100kW or above
MP-ECBC CELL BUILDING ELEMENTS BUILDING ENVELOPE New COMFORT SYSTEMS & Construction CONTROLS OR Existing LIGHTING & CONTROLS Buildings (Addition / Alteration) ELECTRICAL & RENEWABLE ENERGY SYSTEMS
MP-ECBC CELL Exemptions • Buildings that do not use electricity or fossil fuels • Equipment and portion of the building systems that use energy primarily for manufacturing processes • When this Code is in conflict to Safety, Health and Environment codes shall prevail
MP-ECBC CELL COMPLIANCE MECHANISM COMPLIANCE Mandatory PROCESS Prescriptive COMPLIANCE Energy Efficiency SUBMITTALS Performance Level
MP-ECBC CELL COMPLIANCE SUBMITTALS ENERGY Annual Energy Consumption PERFORMANCE = Built-up Area (in sq. m.) INDEX (EPI) EPI of Proposed Building EPI RATIO = EPI of Standard Building
MP-ECBC CELL COMPLIANCE PROCEDURE EPI RATIO Prescriptive Method ENERGY PERFORMANCE Whole Building INDEX (EPI) Performance Method
MP-ECBC CELL MP-ECBC ENFORCEMENT MECHANISM WHATS ARE RULES? ECBC OR MP-ECBC
MP-ECBC CELL RESPONSIBILITIES ? 0 100 CODE REGULATION MONITORING TRANSPERANCY & VERIFICATION CHECKLISTS
MP-ECBC CELL MP-ECBC ENFORCEMENT MECHANISM DEPARTMENTS HAVING THEIR ROLE AND RESPONSIBILITIES
MP-ECBC CELL ADMINISTRATIVE ROLES A uthority H aving M adhya P radesh J urisdiction U rja V ikas N igam MP-ECBC VIDYUT VITRAN CO. I mplementation /DISCOM C ommittee MP-ECBC T echnical G rievances R edressal C ommittee
MP-ECBC CELL PROCEDURE OF ENFORCEMENT
MP-ECBC CELL CONSTRUCTION DESIGNING POST-CONSTRUCTION Check for minimum criteria Owner Owner Will assist in compliance with MP-ECBC 2018 and submit relevant FORMS EEA EEA (Building) (Building) Generate UBID on approval of submittals circulate UBID AHJ AHJ SDA SDA DISCOM COM
MP-ECBC CELL CONSTRUCTION DESIGNING POST-CONSTRUCTION To construct building as per submittals Owner Owner will verify construction process and submit relevant compliance FORMS EEA EEA (Building) (Building) SDA SDA AHJ AHJ Grant new- permanent Electrical Connection DISCOM COM
MP-ECBC CELL CONSTRUCTION DESIGNING POST-CONSTRUCTION Will take necessary action if not in Owner ner EEA EEA compliance (Building uilding) will provide annual energy consumption details of the UBID’s and DISCOM COM share with SDA Will monitor EPI of UBID SDA SDA MP-ECBC Implementation Committee will resolve appeal raised by Owner
MP-ECBC CELL CONSTRUCTION DESIGNING POST-CONSTRUCTION Will take necessary For multiple-use of single buildings, UBID need to be action if not in Owner ner followed by syntax from EEA EEA compliance (Building uilding) Owner: UBID_T(n) will provide When building is occupied or used by various annual energy tenant(s) and having provision of sub-metering for consumption energy consumption is provided by Owner details of the UBID’s and DISCOM COM share with SDA DISCOM: UBID_M(n) When building is having multiple owner(s) and sub-metering for energy consumption is provided by Will monitor EPI of DISCOM UBID SDA SDA Under such cases, especially when sub-meter NEC or SEC is under Owner scope, will be liable to provide necessary will resolve appeal raised annual energy consumption whenever asked by SDA by Owner
MP-ECBC CELL Mixed-use Buildings (Sold by Owner) If Owner sales spaces of building to different consumers after construction then, BUILDING ( with UBID as ‘ xxxx /ECBC’ ) Hospital having MULTIPLE OWNERS Hospital DISCOM shall need to be Offices add UBID with syntax as ‘ xxxx/ECBC-Mn ’ Offices Where, Retails Mn = M1, M2, M3, M4 … Mn (n=no. of multiple of owners) Relevant energy details need to be shared with SDA
MP-ECBC CELL Mixed-use Buildings (Leased by Owner) If Owner make a lease agreement (rent) for the spaces of building with different tenants then, BUILDING Hospital ( with UBID as ‘ xxxx /ECBC’ ) having Hospital MULTIPLE OWNERS Offices OWNER shall be liable to monitor energy consumption Offices via sub-metering Retails While DISCOM need to share energy details for whole building as per UBID shared by AHJ with SDA