Mountain Pump Station Mountain Pump Station Mountain Pump Station Hikurangi Swamp Pump replacement Proposal to defer further capital replacement of pumps by managing existing Pleugers Table: 1 Pump Replacement Programme (year of planned


  1. Mountain Pump Station

  2. Mountain Pump Station

  3. Mountain Pump Station

  4. Hikurangi Swamp Pump replacement Proposal to defer further capital replacement of pumps by managing existing Pleugers

  5. Table: 1 Pump Replacement Programme (year of planned replacement in bold, % of flow pumped by a particular pump in brackets) ~1.1 m 3 /s Pumps ~ 4.1 m 3 /s Pumps Station Station Capacity A B C D E (m 3 /s) Otonga Flygt (17%) Flygt (17%) Pleuger (65%) 6.3 (2018) Te Mata Pleuger (17%) Flygt (17%) KSB (65%) 6.3 (2018) (New 2012) Mountain Pleuger (50%) KSB (50%) 2.2 (2015) (New 2013) Tanekaha McKewen (50%) Pleuger (50%) 2.2 (2022) (2015) Junction Pleuger (100%) 1.1 (2015) Ngararatunua Pleuger (11%) Pleuger (11%) Pleuger (39%) Pleuger (39%) 10.4 (2018) (2018) (2018) (2015) Okarika Pleuger (10%) Pleuger (10%) Pleuger (10%) Pleuger (35%) Pleuger (35%) 11.5 (2022) (2022) (2021) (2015) (2018)

  6. LTP Capital Funding

  7. Overcoming problems with the Pleugers Rewinding is costly and time consuming; • SAAW offer an alternative to Flow Serve at a lower cost Insitu windings that are susceptible to leakage, and faulting of the pump • Maintain stock of spares Historically cannot be removed during a flood, meaning repairs during service are difficult; • Pumps Northland can replace 80hp pumps underwater. Some modifications to installations needed to make removal easier. • Question still remains about 240hp

  8. Recommendations Recommendation • That an 80hp Pleuger be sent to SAAW and be rewound as a spare this financial year and funded from the Opex budget. • That pump stations are modified to assist removal underwater • That a price to rewind a 240hp Pleuger be obtained from SAAW, with the work programmed to be done in July 2013 and funded from the Pump Renewal Capex Budget • That a 80hp pleuger be sent to SAAW next financial year and be rewound as a further spare. This work to be funded from the Pump Renewal Capex budget.

  9. Hikurangi Swamp Pumps Impact on debt position – assuming no pump capital 6,000,000 4,000,000 No Pump Replacement 2,000,000 Current Scenario 0 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 (2,000,000) (4,000,000) (6,000,000)

  10. Stock Restriction– Site Visit 11.2.13 Southern side – Okarika Pocket

  11. Pugging Damage to Okarika spillway

  12. Ngaratunua pump station – looking West

  13. Otonga Pocket – looking North from bank

  14. Mountain Pocket – looking North from bank