Eielson Air Force Base R e a d y T o G o A t 5 0 B e l o w Moose Lake Utilities Repair P r e p a r e - D e p l o y - E n a b l e 1 Overview Project Duration: late February 30 September Cost: $31.4M for the Entire Moose


  1. Eielson Air Force Base R e a d y T o G o … A t 5 0 B e l o w Moose Lake Utilities Repair P r e p a r e - D e p l o y - E n a b l e 1

  2. Overview  Project Duration: late February– 30 September  Cost: $31.4M for the Entire Moose Lake Subdivision  Phase A 2016 (completed) – Eielson Place/Timberwolf Ct  Phase B 2017 – Misty Fjord/Sundog Ct  Phase C 2018 (projected) – South Mukluk Loop  Phase D 2019 (projected) – North Mukluk Loop/Coldfoot St  Project Provides Upgraded Utilities to Moose Lake Residents P r e p a r e - D e p l o y - E n a b l e 2

  3. Construction Overview P r e p a r e - D e p l o y - E n a b l e 3

  4. Construction Overview Parking/Two-way Traffic One-way Traffic Construction Fencing Walking Path P r e p a r e - D e p l o y - E n a b l e 5

  5. Impacts  Work Hours-  Authorized: 7 days/week from 0800-2000  Planned: 6 days/week (Monday-Saturday) from 0800-1800  Frequent Contractor Access to Mech Rooms Starting Late Feb thru 30 Sep  Mech Rms & Thru-Path Clear of Personal Property by 20 Feb  Outages-  Minimum of 48 hour Notice (Except in Case of Emergencies)  Cannot Start Prior to 0900 or Exceed 6 hours in Duration  See Following Slides for Tentative Timeline  Heavily Weather Dependent (May Slip Forward or Backward)  Dewatering-  Pumps will be Online 24/7 for the Duration of the Project P r e p a r e - D e p l o y - E n a b l e 6

  6. Safety / What to Expect  Residents - Avoid All Construction Areas  Street Light & Tree Removal  Dust and Noise  Changes in Traffic Patterns and Parking – Parking Provided Behind Homes (2 Spaces/Home)  Excavation Begins Mid Apr  No Heat After 4 days with Low Temperature Above 40 o F (historically Mid May – Mid Sep)  No Access to Front Yard, Street, Driveway  Large Garage Items Should be Removed Prior to Project Start Unless They Can be Left There for Project Duration P r e p a r e - D e p l o y - E n a b l e 7

  7. Expected Utility Outages Outage Affected Units Purpose Tentative Duration Type Start Date Water Sundog, Misty Fjord Temp Water Heater Install Late Feb 4 hours Water and Sundog, Misty Fjord Temp Lift Station Install Mid Apr 4 hours Sewer Hot Water N. Mukluk, Misty Fjord, Sundog, Switch to Temp Hot Water Early May 6 hours and Heat Coldfoot Water Timberwolf, Eielson Place, Cut Loop to Existing Utilities Early May 6 hours Mukluk, Misty Fjord, Sundog, Coldfoot Heat N. Mukluk, Coldfoot, Misty Fjord, Demo Existing Heat Weather Thru Sundog Dependent Project Hot Water N. Mukluk, Coldfoot Demo Existing Heat Weather 6 hours Dependent Water Sundog, Misty Fjord, N. Mukluk, Commission New Water Line End Jul 6 hours Coldfoot Hot Water Sundog, Misty Fjord, N. Mukluk, Tie In New Heat to Existing End Jul 6 hours Coldfoot Water and Sundog, Misty Fjord Commission New Sewer Line Early Aug 2 hours Sewer P r e p a r e - D e p l o y - E n a b l e 8

  8. Expected Power/Comm Outages Affected Units Purpose Tentative Duration Start Date ALL Base, GCI, ACS Outage Mid May 6 hours ALL Primary Power Outage Mid May 6 hours ALL Secondary Power Outage Mid May 6 hours P r e p a r e - D e p l o y - E n a b l e 9

  9. Expected Road Closures Affected Roads Purpose Tentative Duration Start Date Moose Lake between Temp Utility Crossing Mid Mar 12 hours Timberwolf and Coldfoot Install Mukluk Temp Lift Station Install Mid Mar 12 hours Moose Lake between Temp Tie In at Mech Early May Thru Mid Timberwolf and Coldfoot Rooms Sep Misty Fjord Cut Loop to Existing Early May Thru Mid Utilities Sep Sundog Demo Existing Heat Early May Thru Mid Sep P r e p a r e - D e p l o y - E n a b l e 10

  10. Safety – What to Expect P r e p a r e - D e p l o y - E n a b l e 11

  11. Safety – What to Expect P r e p a r e - D e p l o y - E n a b l e 12

  12. Project Contact Information  Project Contact Info: 907-377-2100 (CE Customer Service)  Inform the Operations Manager that your call is related to the Moose Lake Utilities Project P r e p a r e - D e p l o y - E n a b l e 13

  13. Questions? P r e p a r e - D e p l o y - E n a b l e

  14. RESIDENT SUPPO RT DURING UT ILIT Y C O NST RUC T IO N P r e p a r e - D e p l o y - E n a b l e

  15. Resident/family Support  Little Things Go A Long Way Monthly Neighborhood Outdoor Dinner – Food Provided by Corvias  Mosquito Abatem ent  Yard Carts  ATV/ RV Storage in FSS Lot – Paid by Corvias!!!  Trash Service – We will have a centralized are that will have dum psters. We will  update as we determ ine that location. P r e p a r e - D e p l o y - E n a b l e

  16. Resident/family Support  Utilities  We are working with Conservice to determ ine the best way to adjust to the im pacts.  Garage Im pact Concession  $40 0 one tim e check (one tim e paym ent in Septem ber)  Will be prorated for fam ilies that m ove our during that tim e.  If you occupy the hom e from and past the 15 th of that m onth you will receive the whole prorate for that m onth.  PCS Move Out Support  Corvias/ HMO will Coordinate Move Out Dates With Construction Schedule P r e p a r e - D e p l o y - E n a b l e

  17. Contacts  90 7-372-230 0 during business hours  90 7-372-230 2 after hours P r e p a r e - D e p l o y - E n a b l e