Montcross Area Chamber Business Buzz Local and Regional - PowerPoint PPT Presentation

Montcross Area Chamber Business Buzz Local and Regional Transportation Update May 31, 2018 Working with the Gaston-Cleveland-Lincoln MPO Working with Comprehensive Metropolitan State Transportation Transportation Plan (CTP) Transportation


  1. Montcross Area Chamber Business Buzz Local and Regional Transportation Update May 31, 2018

  2. Working with the Gaston-Cleveland-Lincoln MPO Working with Comprehensive Metropolitan State Transportation Transportation Plan (CTP) Transportation Plan (MTP) Improvement Program GCLMPO (STIP) • Long-range (30+ years) • 30-year, fiscally constrained plan • Short-range (10 years), • Formerly the fiscally constrained plan “Thoroughfare Plan” • Formerly the “Long Range Transportation Plan“ • Identifies funding and • Updated every 5-10 years (LRTP) scheduling of projects • Updated every 4 years • Updated every 2 years Multi-Modal

  3. Working with GCLMPO CTP

  4. Working with GCLMPO MTP

  5. Working with GCLMPO STIP

  6. 2018-2027 STIP Funded Highway Projects

  7. Funded:  Geometric safety improvements I-5000  Construction has begun  Completion: I-85/US 321 November 2019 Interchange  $22.8MM Improvements

  8.  Widening to 8 lanes  US 321 (Exit 17) to NC 273 (Exit 27)  Preliminary Interchange and Funded: Bridge Concepts presented  8 interchanges  6 roadway bridges I-5719  4 railroad bridges  Public Meeting - Summer 2018  Environmental Assessment (EA) - Winter 2019 I-85 Widening  ROW/Utilities – FY 2021  Construction – FY 2021  Completion – FY 2024  $257.5MM

  9. Funded:  Combined with I-85 Widening Project U-3608  NC 7 from I-85 to US 29/74  Improvements: Design modifications and tie-ins for associated interchange NC 7 modifications at Exit 26 Improvements  $4.7MM

  10.  Titman Rd to Union-New Hope Rd Funded:  Widening to 4 lanes U-5821  Pedestrian accommodations?  ROW – FY 2019  Utilities – FY 2019 NC 279 Widening  Construction – FY 2021 (2 yr)  $57.6MM

  11.  Widening to 4-lane divided  Tuckaseegee Rd (at Beatty Dr) to Highland St (at A&E Funded: Dr)  Sidewalks and Bike Lanes U-3633  Construction has begun  Completion – July 1, 2020  Powder-coated mast arms NC 273 Widening and pedheads  Some planted medians  $19.5M

  12. Funded:  Intersection U-5959 Improvements  ROW & Utilities – FY 2020  Construction – FY 2021 US 74 / NC 273  $700K Intersection Improvements

  13. Funded:  NC 7 to East Bank of Catawba River US 74  Construction – FY 22  Project will address Catawba capacity and design issues and provide a River safer facility with improved traffic flow. Bridge  Potential through bridge design for future rapid transit option .

  14. 2020-2029 STIP Development “P5.0”

  15. How STI Works

  16.  Segment A  South Carolina State Line to Exit 10 (US 74) Funded  Widen to 6 lanes  ROW – FY 24 (draft):  Construction – FY 25  $143.2MM I-5985  Segment B  Exit 10 (US 74) to Exit 17 (US 321) I-85 Widening  Widen to 8 lanes  ROW – FY 24 Statewide Mobility Tier  Construction – FY 25  $141.3MM

  17. Funded (draft):  ROW – FY 25 I-6016  Construction – FY 26  $12.7MM I-85 /I-485 Interchange Improvements Statewide Mobility Tier

  18.  NC 273 / Lucia Riverbend Hwy Intersection Improvement  NC 273 / Sandy Ford Rd Regional Intersection Improvement  NC 273 Widening – A&E Dr to Impact Tier Lanier Ave  US 74 Widening – Market St to Alberta Ave (South Fork Highway Bridge Widening) Projects  NC 7 / US 74 Intersection Improvement  NC 273 / South Point Rd Intersection Improvement

  19. P5.0 Regional Impact Projects Public Comment Period

  20. P5.0 Regional Impact Projects Public Comment Period

  21. Interactive Map for Public Comment

  22. Regional Planning Efforts

  23. NC 16 4 mi NC 27 3 mi I-85 < 1 mi Catawba US 74 Crossings 10 mi SC 49

  24. Catawba Crossings

  25. LYNX West Corridor W HAT HAS CHANGED ? A IRPORT C OMMERCIAL • D EVELOPMENT S TRATEGY R IVER D ISTRICT • W EST B LVD • C ORRIDOR S TUDY W ILLINGNESS TO EXPLORE • NEW ROW CONCEPTS I DENTIFIED AS EXTENSION • OF S ILVER L INE G ASTON C OUNTY • STAKEHOLDERS HAVE EXPRESSED INTEREST

  26. Study Timeline October-December 2018 July- September Study 2018 Options July- September 2018 System Integration June-July Refinement 2018 of Leading Alternatives Second Round of Public Outreach April-June 2018 Detailed Evaluation of Alternatives

  27. Planning for all Modes of Transportation

  28. Funded Bike/Ped Mt. Holly Mt. Holly River Front Greenway Bike/Ped Feasibility Study Projects 2018-2027 State Transportation Improvement Program (STIP) Belmont Cramerton Belmont Rail Trail Lakewood Park Trail

  29.  Gaston ACCESS  Administration Funded  Capital Transit  Gastonia Transit  Bradley Station Projects Addition  Transit Enhancements  Walkways 2018-2027  Shelters State Transportation Improvement Program  CATS (STIP)  85X Mid-Day Route

  30. Funded  Runway Realignment Alternatives Analysis & New Airport Site Selection Analysis Aviation  Rehabilitate Fuel Farm Drive, Construct Loading Pad, New Projects Self Serve Av-gas Tank, Rehabilitate Taxilane  Taxiway Lighting & Signage  Rehabilitate Corporate Hangar 2018-2027 Taxiway State Transportation Improvement Program TOTAL - $1.7MM (FY 2018) (STIP)

  31. 2020-2029 STIP Development P5.0 Regional Impact Projects (Highway) • 15-day public comment period – May 25 – June 8, 2018 Call to • 3 public meetings • Tuesday, June 5 th , 11am – 1pm – Gastonia City Hall Action: P5.0 Division Needs Projects (Highway, Bike/Ped, Transit, Aviation) Get • 15-day public comment period – Sept. 28 – Oct. 12, 2018 • 3 public meetings Involved

  32. Contact: Randi Gates, AICP Principal Transportation Planner randig@cityofgastonia.com 704.854.6604 www.gclmpo.org