This Project is funded by the European Union Supervision and Environmental Monitoring of River Training and Dredging Works on Critical Sectors on the Danube River STAKEHOLDER S FORUM MEETING No.4 09.November 2018 Republic of Serbia


  1. This Project is funded by the European Union Supervision and Environmental Monitoring of River Training and Dredging Works on Critical Sectors on the Danube River STAKEHOLDER ’ S FORUM MEETING No.4 – 09.November 2018 Republic of Serbia Ministry of Construction, Transport and Infrastructure

  2. Hydromorphology Futog km 1267.400 to km 1261.600 Morphology Hydrology

  3. General Flow Conditions 7km G 136 G 135 G 133 G 134

  4. 2018. Historical development - morphology III/2018. V/2018. VII/2018.

  5. Chevron – “O” stage

  6. Water level gauging stations Novi Sad: Ba čka Palanka: „0“ 71.73 maAs „0“ 73.97 maAs Km 1254.980 Km 1298.560 Futog

  7. Gauging stations on building sites

  8. Gauging stations – web portal

  9. Gauging stations – web portal

  10. Gauging stations – web portal

  11. Water levels Graph 23/10 to 04/11 2018 74.5 74 73.5 73 72.5 72 10.19.18 0:00 10.23.18 0:00 10.27.18 0:00 10.31.18 0:00 11.4.18 0:00 11.8.18 0:00

  12. Gauging station Novi Sad – 7 days forecast Novi Sad: „0“ 71.73 maAs Km 1254.980