2018 MIAMI-DADE COUNTY FREIGHT PLAN UPDATE Freight Transportation Advisory Committee April 11, 2018
I. Schedule II. Purpose III.Goals Presentation IV.Existing Conditions Outline V.Warehousing Trends VI.Projects VII. FLZ Application 2
TASK NAME June July Aug Sept Oct Nov Dec Jan Feb March Apr May 1. Study Coordination: Form the Study Advisory Committee 1a. 5 Committee Meetings 1b. Coordinate with Regional Freight Plan 1c. Coordinate with LRTP 1c. Presentations to FTAC and MPO Committees (9) 2. Background Research 3. Data Collection 3a. Obtain FDOT Classification Counts and Map 3b. Warehousing market 3c. Identify trucking and freight activity 3d. Identify Planned Freight Facilities 4. Identify Magnitude of Freight Activity Freight Plan 4a. Data from existing studies 4b. Document freight movement through County 4c. Estimate growth based on MIA POM 4d. Scenario Planning Update 5. Planned and Programmed Improvements 5a and b. Identify projects and map 5c. Review 2040 LRTP and TIP and Update Freight Related Projects 5d. Identify previous cost estimates and funding 5e. Document projects by programming phases 6. Identify New/Additional Improvements Schedule 6a. Identify new/additional projects 6b. Identify any recommendations for private sector activity 6c. Identify policy needs 7. Identify Truck Parking and Cargo Security Needs 7a. and b. Identify and collaborate with partners 7c. Document truck parking projects and potential security needs 7d. Document trends in Cargo Security and Theft and Local efforts and needs 8. Freight Logistics Zone Strategic Plan 8a. Review Legislation 8b. Map proposal 8c. Prepare application and identify freight projects in the FLZ Proposal 8d. Recommend FLZ to be included in local implementation documents 9. Freight Logistics Zone Strategic Plan 9a. Coordinate with FDOT Central and District 6 on Final FAST ACT Measures 9b, c and d. Prepare documentation related to measures 10. Prepare Draft Final Report, transmit and Revise and Submit Final 10a. Submit Draft Report TPO Review 10b. Revise and Submit Final 3
2014 to 2018 Freight Plan “Update” 4
DRAFT I. Safety and Security II. Agile, Resilient, Quality III. Efficient and Reliable Mobility Freight Plan Update IV. Economic Competitiveness Goals V. More Transportation Choices VI. Environment and Conserve Energy VII.Quality Places 5
DRAFT Miami-Dade Multi-Modal Freight Plan Network 6
DRAFT Regional Multi-Modal Freight Plan Network 7
DRAFT 2016 Highway Truck and Traffic Volumes 8
DRAFT 2016 Daily Truck Volumes 9
DRAFT PORTMiami Update 10
DRAFT Historic AADT and Truck Volumes at Port Miami (Bridge) 16,000 14,000 12,000 10,000 8,000 Sum of AADT 6,000 Sum of AADTT PORT 4,000 2,000 Miami 0 2012 2013 2014 2015 2016 Truck/Traffic Historic AADT and Truck Volumes at Port Miami (Port Tunnel) Access 12,000 10,000 8,000 Sum of AADT 6,000 Sum of AADTT 4,000 2,000 0 2015 2016 11
DRAFT Port Rail Moves Container Rail Moves Port Miami 3000 2500 NUMBER OF CONTAINERS 2000 1500 Seaboard POMTOC 1000 SFCT Total 500 0 12 Oct-16 Nov-16 Dec-16 Jan-17 Feb-17 Mar-17 Apr-17 May-17 Jun-17
Railroad Network 13
DRAFT Railroad Data Miami-Dade Strategic Rail Crossings FRA Rail Rail Crash Primary Crossing Conflicts Map Crossing History # of Max RR Street Crossing Operating Position Type Roadway Crash AADT (#Trains x Index # number (2012- trains Speed Railroad Prediction AADT) 2016) Index 1 W Flagler St CSX 631055E At Grade Public 1 0 4.3% 1 25 47,500 47,500 2 NW 22nd St FEC 272779H At Grade Public 0 0 1.4% 6 20 2,712 16,272 3 NW 70th Ave FEC 272778B At Grade Public 0 0 0.9% 6 20 4,558 27,348 4 NW 68th Ave FEC 272787A At Grade Private NA 0 N/A 2 10 0 5 Milam Dairy Road FEC 272780C At Grade Public 0 0 1.6% 6 20 30,825 184,950 6 NW 26th St FEC 272899Y At Grade Public 0 0 0.6% 6 15 101 606 7 NW 25th St FEC 272776M At Grade Public 0 0 2.2% 6 20 21,512 129,072 8 Milam Dairy Road CSX 628536U At Grade Public 0 0 1.4% 1 10 23,500 23,500 9 NW 74th St FEC 272755U At Grade Public 0 4 2.2% 18 20 2,485 44,730 10 W 8th Ave FEC 272748J At Grade Public 0 2.6% 21 35 17,500 367,500 11 FEC TOFC D/W FEC 272948T At Grade Private NA 0 N/A 12 20 9,999 119,988 12 NW 22nd Ave SFRC 628320N At Grade Public 2 4 18.0% 55 79 30,500 1,677,500 13 NE 125th ST FEC 272612W At Grade Public 1 0 0.1% 18 45 33,350 600,300 14 NE 203rd St FEC 272596P At Grade Public 0 1 6.3% 34 50 49,600 1,686,400 15 Pedestrian FEC 273139L At Grade NA NA 0 N/A 1 25 0 16 Port Boulevard FEC 272960A At Grade Public 1 0 5.7% 3 25 9,999 29,997 17 Pedestrian Arena FEC 273133V At Grade NA NA 0 N/A 1 25 0 18 NW 36th St SFRC 628377P At Grade Public 0 0 4.6% 43 45 20,700 890,100 19 NW 27th Ave FEC 272717K At Grade Public 1 0 6.8% 22 35 27,300 600,600 20 NE 163rd St FEC 272604E At Grade Public 0 0 5.7% 18 45 44,500 801,000 21 NW 7th AVE FEC 272712B At Grade Public 0 0 0.0% 18 35 23,662 425,916 22 NE 36th St FEC 272633P At Grade Public 0 0 1.1% 4 15 15,500 62,000 Source: USDOT Federal Rail Road Administration 14
DRAFT Miami River Update 15
DRAFT MDAD Exports and Imports MIA 2012-2016 Update 700,000 600,000 500,000 Thousands Kilos 400,000 300,000 200,000 100,000 0 MIA MIA MIA MIA MIA MIA MIA MIA MIA MIA 2012 2012 2013 2013 2014 2014 2015 2015 2016 2016 Export Import Export Import Export Import Export Import Export Import Kilos Kilos Kilos Kilos Kilos Kilos Kilos Kilos Kilos Kilos 16
DRAFT Warehousing Trends 17
DRAFT METHODOLOGY Update 2014 list of projects Coordinate with Partners/SAT PORTMiami Freight Plan MDAD FEC Railway Update CSX Transportation DTPW, MDX, FTE and FDOT Development Municipal Outreach of Projects FDOT Subarea Plans – Medley, Opa Locka, Draft Doral Submit list of needs for consideration in TPO 2045 Long Range Plan 18
Lists of HANDOUT Projects 19
2045 Long Range Transportation Planning Process 20
DRAFT 21
Q&A THANK YOU Jeff Weidner jweidner@MARLINengineering.com 954-205-2471 Kevin Walford Kevin.Walford@MDTPO.org 305-375-2642