US US-11/S OUTH M AI AIN S T S TUDY DY E RICK CKSON A VE VE & P & P EA EAR S TREET EET D ES ESIGN Meeting #2 – Existing Conditions/Preliminary Screening September 24 th , 2019
Agenda Agenda/Study Information Kickoff Meeting Recap VDOT STARS S Main St-Erickson Ave PROJECT Points of Contact: Public Input/Polling Results • STARS Program Manager – Bill Guiher Existing Operational Conditions • william.guiher@vdot.virginia.gov • VDOT Project Manager – Brad Reed TIA Coordination/New High School • brad.reed@vdot.virginia.gov Discussion • ATCS Team Manager – Nathan Umberger Safety Analysis • numberger@atcsplc.com Preliminary Screening & Alternatives Discussion Open Discussion Erickson/Pear Schedule/Next Steps 2
K ICKO KOFF M EETING NG R ECAP 3
Study Intersections/Segments Study Intersections/Segments Intersections US-11 @ Stone Spring/Erickson US-11 @ Mosby Road Open Access Segment Targeted Safety Needs Within #5 ranked PSI segment in VDOT Staunton District (Pleasant Hill Rd to Covenant Dr) S Main St/Mosby Rd #3 ranked PSI intersection 4
Corridor Overview Corridor Overview US-11/S Main Street Classified as Minor Arterial throughout study section Average Daily Traffic 21,000 vehicles/day South of Stone Spring, 19,000 vehicles/day North of Stone Spring Approximately 3-3.5% Heavy Vehicles Two primary signalized Intersections Five-lane typical section Generally Open/Full Access Entrances Includes Bike Lanes throughout Sidewalk on W side of alignment Pedestrian accommodations at signals 5
P UBL BLIC I NV NVOLVEMENT S UR VEY URVEY 6
Q UESTION #1 #1
Q UESTION #2 #2
Q UESTION #3 #3 & & #4 #4
Q UESTION #5 #5 & & #6 #6 Bus Stop access/safety/amenities Bus Stop access/safety/amenities
Q UESTION #7 #7
Q UESTION #8 #8
S URVEY EY O PEN EN A NSWERS RS – S OUT UTH M AIN S TREET EET S Main St & Mosby Rd S Main St & Erickson Ave Widen for Dual Lefts 9 Add SB Right Turn Lane 2 General Traffic Improvements 5 Widen Mosby Approach 1 Install Roundabout 1 Grade Separation 1 Access Management S Main St Access Management 11 P RESENTATION T ITLE
S URVEY EY O PEN EN A NSWERS RS – E RI ON A VE VE & P & P EA EAR S T RICKSON Erickson Ave & Pear St Install Signal 11 Restrict Pear St Left Turns 9 Install Roundabout 9 Turn Lane Improvement 4 U-Turn Concern 2 Access Management Erickson Ave Access Management 3 P RESENTATION T ITLE
S URVEY EY O PEN EN A NSWERS RS – P EDESTRI RIAN & B & B IKE I SSUE SUES Pedestrian Bike General Ped Improvement 4 Bike Lane Improvement 11 Sidewalk Improvement 3 4 General Bike Improvement Crosswalk Improvement 1 Ped Refuge Island @ Erickson 1 P RESENTATION T ITLE
S URVEY EY O PEN EN A NSWERS RS – O THE HER I SSU SSUES Erickson/Garbers Church Improvements 12 Traffic noise concern 2 Rt. 11 & Pointe Dr – Suggested Signal 2 Improve bus service 1 Increase speed on Erickson Ave 1 Limit development intensity on Pear St 1 Main & I-81 Improvements 1 Rt. 42 & Erickson Improvements 1 Rt. 11 & Kaylor Park – Suggested Signal 1 P RESENTATION T ITLE
E XIST NG O PERATI AL STING TIONAL A NAL NALYSIS Traffic Impact Study Provided Results 17
Existing Conditions Analysis – South Main Street and Stone Spring Road AM Peak Hour Volumes PM Peak Hour Volumes
Existing Conditions Analysis – South Main Street and Stone Spring Road 2019 Existing - LOS and Queue Summary • Heavy delay for the AM Peak Hour PM Peak Hour Queue Queue Delay Length Delay Length Lane through and left turn (Sec/Veh.) LOS (Feet) (Sec/Veh.) LOS (Feet) Intersection Roadway Group NBL 42.7 D 211 55.5 E 281 movements. South Main NBT 50.7 D 242 50.5 D 315 Street NBR 57.2 E 96 9.9 A 96 SBL 41.9 D 113 55.4 E 287 South Main SBT 53.5 D 225 49.1 D 341 South Main Street SBR 34.1 C 3 32.0 C 45 Street (Route EBL 24.3 C 50 32.7 C 81 11) and Stone Erickson EBT 41.2 D 169 54.8 D 264 Spring Road Avenue EBR 32.2 C 104 34.0 C 79 WBL 31.1 C 234 47.6 D 296 Stone Spring WBT 30.9 C 151 42.9 D 265 Road WBR 22.4 C 20 27.7 C 110 Overall 40.7 D - 43.0 D - Note: LOS and Delay generated using HCM 2000 methods, queues represent 95th percentile PM Timing Plan for Route 11 and Erickson/Stone Spring
Existing Conditions Analysis – South Main Street and Mosby Road AM Peak Hour Volumes PM Peak Hour Volumes
Existing Conditions Analysis – South Main Street and Mosby Road 2019 Existing - LOS and Queue Summary • Heavy eastbound AM Peak Hour PM Peak Hour Queue Queue volume with only a Delay Length Delay Length Lane (Sec/Veh.) LOS (Feet) (Sec/Veh.) LOS (Feet) Intersection Roadway Group single lane for left South Main NBL 16.7 B 23 33.1 C 70 Street NBTR 24.1 C 257 73.3 E 682 South Main South Main SBL 8.6 A 6 33.3 C 12 turning vehicles. Street (Route Street SBTR 30.6 C 421 39.6 D 593 11) and Mosby EBL 33.6 C 212 55.6 E 541 • Significant delays for Mosby Road Road EBTR 24.8 C 0 38.9 D 0 Mosby Road WBLTR 33.8 C 1 63.6 E 63 Overall 27.7 C - 57.0 E - all approaches. Note: LOS and Delay generated using HCM 2000 methods, queues represent 95th percentile PM Timing Plan for Route 11 and Mosby Road
S AF AFETY A NALY LYSIS & F & F INDINGS GS 22
Crash Activity – January 2013 to April 2019 Crash Activity – January 2013-April 2019 23
S Main St Crash Activity S Main St Crash Activity Sideswipe- Other Deer US-11 CRASH TYPES LIGHTING CONDITIONS Opposite Sideswipe - 4% Direction 2% Same Angle Night 1% Direction 38% 12% 9% Day Rear End 88% 46% 24
Analysis Segmentation Crash Activity – January 2013-April 2019 Crashes updated for January 2013 – May 2019 25
South Main Street @ Stone Spring/Erickson Crash Activity – January 2013-April 2019 January 2013 – May 2019 • 3 Angle Injuries from Northbound Left Turn • 3 Angle Injuries due to Right Turn on Red Maneuvers 26
South Main Street @ Stone Spring/Erickson Crash Activity – January 2013-April 2019 27
South Main Street @ Mosby Road Crash Activity – January 2013-April 2019 January 2013 – May 2019 3 Angles explicitly mention commercial driveways Most injuries due to rear ends/red light running 28
South Main Street @ Mosby Road Crash Activity – January 2013-April 2019 29
South Main Street Commercial Access Segment Crash Activity – January 2013-April 2019 January 2013 – May 2019 22 Crashes specifically mention ingress/egress from Commercial Accesses 6 Crashes specifically from conflicts in Two-Way Left Turn Lane 6 Crashes specifically from Southbound stopped vehicles at Mosby Majority of others due to Northbound congestion at Stone Spring 30
South Main Street Commercial Access Segment Crash Activity – January 2013-April 2019 31
S OUT UTH M AIN S TREET ET C OMMERCIA CIAL A CCE CCESS S EGME NT MENT
Mosby Commercial Access Crash Activity – January 2013-April 2019 January 2013 – May 2019 Majority of crashes associated with conflicts due to entering/exiting Shopping Plazas 33
South Main Street Commercial Access Segment Crash Activity – January 2013-April 2019 34
K EY EY SMART S SCALE C LE CMF MF S FO FOR S AFE FETY S COR CORING 2018 S 018 S CO CORING V ALUES – N OTE SUBJE BJECT TO CHANG NGE
K EY EY SMAR ART S SCAL ALE C CMF S FO FOR S AFET FETY S CO NG CORING
A LTER VE ERNATIVE S CREENI NG /P /P RELI ELIMINARY NING C ON EPTS ONCEP 37
Preliminary Site Conditions/Constraints
South Main Street @ Stone Spring/Erickson Crash Activity – January 2013-April 2019 PM Peak Hour AM Peak Hour • Based on 2019 Collected AM/PM Counts • Conventional can be improved with capacity improvements – • Northbound only Dual Lefts creates 0.52/0.56 • Northbound & Westbound Dual Lefts reduces to 0.43/0.48 39
South Main Street @ Mosby Road Crash Activity – January 2013-April 2019 AM Peak Hour PM Peak Hour • Alternative intersections don’t offer significant improvements under existing conditions • By improving Eastbound lanes/revising signal phasing overall improved operations are possible 40
N EX EXT S TEPS PS Develop future volumes & growth rates Focus on priority improvements Analysis Concepts Design Cost Estimates 41
Q UESTI TIONS /C /C OMMENTS ? Thank you!