Conceptual Plan Kick-Off Andrew Haswell Green Park Phase 3 - PowerPoint PPT Presentation

Andrew Haswell Green Park Phase 3 Conceptual Plan Kick-Off Andrew Haswell Green Park Phase 3 Existing Conditions Existing Conditions Existing Conditions Existing Conditions Existing Conditions * Existing Conditions * *


  1. Andrew Haswell Green Park Phase 3 Conceptual Plan Kick-Off

  2. Andrew Haswell Green Park – Phase 3 Existing Conditions

  3. Existing Conditions

  4. Existing Conditions

  5. Existing Conditions

  6. Existing Conditions *

  7. Existing Conditions *

  8. * Existing Conditions

  9. Existing Conditions *

  10. Existing Conditions *

  11. Existing Conditions *

  12. Existing Conditions *

  13. Existing Conditions *

  14. Existing Conditions *

  15. Existing Conditions *

  16. Existing Conditions *

  17. Existing Conditions *

  18. Existing Conditions *

  19. Existing Planning Document Existing Conditions • Community Board 8 | 197-A Plan for the Queensboro Bridge Area • Summer 2006

  20. Existing Conditions

  21. 197-A Plan | Queensboro Bridge Area Existing Conditions • Over 30 years of planning “to improve and regenerate precious and vastly underutilized waterfront and open spaces.” • “The potential exists to create a significant extension to the East River Esplanade, incorporating the former sanitation station structure.”

  22. 197-A Plan | Queensboro Bridge Area Existing Conditions • “the concrete-framed structure would create a well-lit and undercover space” • “the rear portion of the structure for park maintenance uses, including storage space and a parking area for maintenance vehicles” • “A seasonal café should also be considered”

  23. Existing Conditions

  24. Existing Conditions

  25. Andrew Haswell Green Park – Phase 3 Precedent Examples

  26. Design Considerations Precedent Examples • Human Scale Elements • Accommodate Bicycle and Pedestrian Access • Accommodate Vehicular Access and Maintenance • Flexibility (of Public Program) • Resiliency to Sea Level Rise • Pedestrian Amenities • Public Art • Lighting Within Structure • Mitigate Sound and Fumes from the FDR • Public Safety

  27. MAKE IT ABOUT LEISURE Precedent Examples Aarhus, Denmark – Waterfront Promenade

  28. MAKE IT A DESTINATION Precedent Examples Miami – The Underline Bike Repair Kiosk

  29. MAKE IT UNIQUE Precedent Examples Chicago – South Pond Pavilion

  30. MAKE IT UNEXPECTED Precedent Examples Boston – Southeast Expressway Park

  31. MAKE IT A VIBRANT PLACE Precedent Examples Vancouver – JJ Bean Coffee

  32. MAKE IT YEAR ROUND Precedent Examples Washington, D.C. – Watergate Hotel

  33. MAKE IT WELCOMING Precedent Examples Brazil – Atelie Wals Brewery

  34. MAKE IT AN EXPERIENCE Precedent Examples France – New Vieux Port Pavilion

  35. MAKE IT ARTISTIC Precedent Examples Iowa – High Trestle Trail

  36. Next Steps in Planning Next Steps • 6/27: CB8 meeting (EMG project update) � Present overview and solicit feedback on program • Late July � Present (1) draft conceptual plan and solicit feedback • Early September � Present final conceptual plan