Me Meet et the TM TMP Pri Primes es African American Chamber of Commerce July 25 2019
Safet ety Moment ent
TMP-http:// ttp://pi pittr ttrans ansformed rmed.co .com/ m/ 7/24/2019
Term rminal al Moderni rniza zatio tion Program Overv rview iew Bold plan to transform PIT to better serve travelers, reduce costs, meet changing industry needs, & advance the region. Termi minal nal Proje ject - a new terminal that consolidates landside & airside operations. Multi ti-Mo Moda dal Comp mplex lex (MMC) MC) - a new ground transportation center, parking garage, parking lots, and access roadways. 7/24/2019
Pri rime me Co Contracto ctors rs Jaco cobs bs - Program Management Team Gens nsler ler + HDR in ass ssocia ociation tion with luis is vida dal + architects hitects - Terminal Architectural Design & Engineering Team Michae chael Baker ker Inter erna national tional - Multi-Modal Complex Architectural Design & Engineering Team PJ Dick ck/Hun Hunt JV JV - Terminal Construction Management Team Turner er Cons nstru truction ction Company pany - Multi-Modal Complex Construction Management Team 7/24/2019
The TMP Team ACAA Board & CEO Chief Development Officer Program Director Program Management Office (PMO) – Jacobs PM Team | ACAA Teams Multi-Modal Complex Terminal Construction AE Design AE Design Independent Construction Independent Management Testing Management Testing Gensler + HDR Turner Services Services in conjunction Michael Baker PJ Dick/Hunt Construction *pending with luis vidal International PSI* JV* WSP* contract Company* + architects award 7/24/2019
DBE’s Currently Working on TMP A & A Arora Engineers Connico ED3 Consultants, Graves Design RIG Consulting, Consultants Inc. Group Inc. A.G.E.S., Inc. AWK Consulting Cosmos evolveEA Illustrate My Santangelo & Engineers, Inc. Technologies Design Lindsay Abstract Group Branch Pattern CPM Consultant Foresight Jacobsen Sci-Tek Services, LLC Construction Daniels Consultants, Inc. Services, LLC Advantus Bree & Crawford FTBA Koryak UpStudio Engineers Associates, Inc. Consulting Landscapes Services Always Busy CMTS, Inc. Davis Consulting G Stephens, Inc. Monaloh Basin Virtuo Consulting (ABC) Solutions Engineers Architecture Collective Efforts, Deborah Knox GeoMechanics Rhea Engineers Innovations LLC & Consultants, Inc. 7/24/2019
Our Vision on ACAA, through the Terminal Modernization Program, and our commitment to diversity, will design and implement a DBE Program that promotes the economic vitality of MWDBE’s as well as diverse and inclusive employment opportunities in the greater Pittsburgh region in order to sustain the continued economic growth of MWDBE’s in the region. 7/24/2019
How Ho We Will Ac Achieve ve Our Vision on Consistently meeting and exceeding • 14% DBE Goal Creating opportunities for new • MWDBE businesses to grow and build capacity Using innovative and aggressive • tactics to meet DBE Goal Pro-active outreach and community • stakeholder engagement Effective DBE Compliance & • Monitoring Metrics/Reporting • 7/24/2019
Speci cial al DB DBE Co Contrac acting ing Strateg egies ies Right Sizing of Contract Bid Packages • DBE Targeted Bid Packages • Early identification of bid packages so that • potential bidders can start preparing to pursue the bid packages Non-Mandatory Pre-Bid Meetings provide an • opportunity for DBE firms to network and possibly team with primes on projects Workforce Goals-6.3%- Minority and 6.9%- • Women 7/24/2019
Cont ntact act Inf nfo Jenee’ Oliver, Esq. Business Diversity & Outreach Manager jolive ver@flypittsbur r@flypittsburgh gh.com .com (412) 472-5503 7/24/2019
Ja Jaco cobs Prog ogram am Mana nagement ement Tea eam
Im Improved Ai Airp rport rt Exp xperie rienc nce fr from Cu Curb rb to Ga Gate An And Ne New Eco conomi mic Opportun rtunity ity for the Region • A new terminal that consolidates landside and airside operations • New Multi-Modal Complex including a parking garage, ground transportation center and rental car operations • Enhanced concessions and non- aeronautical revenue opportunities • Enhanced security and amenities with a tech-forward approach • Additional real estate development opportunities 7/24/2019
TMP Schedul ule Overv rview ew COMPLET LETED ED ONGOING LATE 2020-2023 * 7/24/2019
Sch chema matic ic De Design – Updated ted Site La Layout MMC TERMINAL 7/24/2019
Ne New Term rminal al La Layout – Ar Arri rivals ls 1. Passengers will deplane and depart the airside terminal into the expanded “Greeters” area (that will be situated just below the security lanes on the Departures level); 2. Enhanced baggage claim area that allows flexibility to extend or add additional baggage carousels; 3. Concessions; 4. Outdoor plaza for passengers to rest and refresh, if desired; 5. Open center core so passengers without checked baggage can move quickly to the arrivals curb / ground transportation 7/24/2019 16
Ne New Term rminal al La Layout – De Depart rtur ures es 1. Ticketing; 2. Baggage Check-in; 3. Open center core, allowing passengers who don’t need to check -in to proceed directly to Security; 4. Much-expanded, technologically advanced Security check-point, allowing for more efficient passenger screening; 5. Outside plaza; 6. Observation deck (open to the public); 7. Concessions Passenger walking and travel times will be greatly reduced . 7/24/2019 17
Next Steps for Schematic Design - Terminal Terminal Plans (Apron, Departures and • Arrivals Levels) Ticketing Hall Variations • Concessions Locations and Strategy • Terminal Roof and Façade Treatments • Maintenance and Mechanical Systems • Interior and Exterior Finishes, Signage, • Lighting, Parking Lot Naming 7/24/2019
Pri rima mary ry Co Comp mponents ts of t the MMC Ground Transportation 1 Center (GTC) 2 Multi-Use Garage Quick-Turnaround Area 3 3 (QTA) 4 Surface Parking 2 1 4 7/24/2019
Gr Ground Transporta portati tion on Ce Center GROUND ND TRANS NSPOR ORTATIO ION CENT NTER (G (GTC) 1 And CUSTOM OMER SERVIC ICE BUILD LDIN ING (CSB) B) Including: 1. Pedestrian circulation (shared ed lobby), customer amenities and associated building support; 2. 2. Rental al car custo stomer er servic ice area providing an area for rental car transactions; 3. Enclosed, conditioned vertical circu culatio ion core connecting the Level 2 lobby to the GTC curbside below; 4. Enclosed, conditioned pedestrian ian bridges connecting the GTC/CSB lobby to the 1 Multi-Use Garage; 5. A terminal-quality interior space 7/24/2019
Multi-Us Use Ga Garage MULTI TI-USE USE GARAG ARAGE 2 Includin luding: 1. A Ready/ ady/Ret Retur urn and vehicle Stag agin ing area for rental car use (Level 1); 2. A Public lic Park rking ing area (Levels 2-5) accommodating 3,500 cars; 2 3. Two enclosed, conditioned pedest estrian rian ver ertical tical circula ulatio tion cores es serving all levels; 7/24/2019
Quick ck Turn rnaround und Ar Area QUIC UICK-TURN TURNARO AROUND ND AREA (QTA) A) 3 Including: 1. An open-air, rental car vehicle Stac ackin king Area adjacent to the Staging Area; 2. 2. Fuel and vacuum islan ands (36 posit itio ions) for re-fueling and interior cleaning of rental car 3 vehicles with canopy cover and upgraded lighting; 3. 3. Car Wash Bays (12) and associated support for cleaning of vehicles; 4. Rental Car Company administ istratio ion shell- space with utility infrastructure to be finished out by tenants; 5. 5. Facilit lity Operator offic ice; 6. Associated support and utility spaces including electrical, IT and trash; 7. Adjacent service yard with fuel drop area; 8. 8. Mainten enan ance ce build ldin ings with 8 bays 7/24/2019
Pedestrian trian Bri ridge Co Connect cts to S Surf rface ce Park rking ing PEDESTRIAN ESTRIAN BRID IDGE CONNE NNECTIO TION TO 4 SURFAC FACE PARK RKING ING Including: 1. Open-air, canopy-covered entry at the surface parking lot; 2. Open-air, canopy-covered, gently sloped sidewalk connection under the entry roads and up to the southwest corner of the CSB/GTC building with a vestibule connection CANOPY at Level 2; ADDITIONAL L 4 PATH 3. Concrete sidewalk with translucent canopy on metal structural system; 4. Direct landscape connection to the terminal connection bridge is available on-grade 7/24/2019
Recommend
More recommend