material
play

MATERIAL David M. Griffin, in, P.E. Water erways ys Program - PowerPoint PPT Presentation

BENEFICIAL USE OF DREDGED MATERIAL David M. Griffin, in, P.E. Water erways ys Program gram Manager er May 2, 2012 Overview GD GDOT OT is s the he Lo Local al Sponsor nsor for the he Atlantic ntic In Intracoas tracoastal al


  1. BENEFICIAL USE OF DREDGED MATERIAL David M. Griffin, in, P.E. Water erways ys Program gram Manager er May 2, 2012

  2. Overview • GD GDOT OT is s the he Lo Local al Sponsor nsor for the he Atlantic ntic In Intracoas tracoastal al Water terway y and d the he Brunswic nswick k and d Sav avann annah ah Harbor bor Pr Projects jects • Maint intena enance nce material terial remo moved ed fr from inner er harb ha rbor ors s annual ually ly (o (on av averag rage) e) Sav Savanna annah: h: 6,000,000 ,000,000 cubi bic c yards ds Brunsw unswic ick: k: 500 00,000 ,000 cubi bic c yards ds

  3. Overview • Sav avann annah ah Harbor bor Dredge dge Materia erial l Contain ainment ment Ar Areas as (D (DMCA CAS) S) 7 upland and DMCAs CAs 6,0 ,000 00 acres es in DMCAs CAs 42 2 miles es of f containment ainment dikes es La Largely gely si silt

  4. Overview • Brunsw unswic ick k Harbo bor r DMCA CA 1 upl pland and DMCA CA 700 00 acres es in DMCA CA 4 miles es of f containment ainment di dikes es La Largely gely sa sand

  5. Beneficial Uses • Pr Provide vide add dditional itional DMCA CA sto torage rage capa pacity city • Pr Provide vide so social ial and/or /or envi nviron ronment ental al be benefi fits

  6. Beneficial Uses • Dike e Construction truction • Roads/P ads/Pub ublic lic Work rks • Offshore shore Bird Is Island, nd, Sav avann nnah ah • In Inshore shore Bird d Is Island, and, Brunsw swic ick • Bric ick k manufacturing acturing study dy

  7. Dike Construction • Dikes es are raised sed every y 6-12 2 years s to to provide vide additional dditional di disposal sposal capa pacity ity • Material aterial removed ed fr from interio erior r of f DMCA CA to to raise se dikes es • Typical pical 6 foot dike e raisi sing ng restores ores be between een 5 and d 6 cubi bic c yards ds of f area a capacity acity for each h linear near foot of f di dike

  8. Roads/Public Works • Gl Glynn nn County nty ha harves ests ts sa sand d fr from Brunswic swick DMCA • Material aterial mostly tly use sed d as s ba base se material terial for county unty roads ds • Am Amount unt removed ed varies es annual ually ly

  9. Savannah Harbor Bird Island • Cons nstruct tructed d offshor shore north th of f ba bar cha hann nnel el

  10. Savannah Harbor Bird Island Cons nstruction truction • Cons nstruct tructed d in 2004 • Ap Appro roximate ximately ly 6 acres es abov bove e MLW • 1.5 5 miles es offshore shore • Material aterial removed ed fr from inland and DMCA CA and pumped mped offshor shore

  11. Savannah Harbor Bird Island Benefits nefits • In Increased creased di disposal sposal capa pacity ity by 50 500,000 0,000 cubi bic c yards rds • Pr Provides vides protect ected d roosting ting and nesting ting area a for migra gratory y bi bird sp species cies

  12. Brunswick Harbor Bird Island • Cons nstruct tructed d inshor shore north th of f navi avigation gation cha hann nnel el

  13. Brunswick Harbor Bird Island Cons nstruction truction • Cons nstruct tructed d in 2007 7 du during ing ha harbor bor de deepening pening • Ap Appro roximate ximately ly 15 acres es abov bove e MLW • 0.5 .5 miles es fr from m sh shore re • Material aterial dredged dged directly ectly fr from cha hann nnel el bo bottom om to to the he si site te

  14. Brunswick Harbor Bird Island Benefits nefits • Pr Provided vided add dditional itional di disposal sposal capa pacity ity du during ing deepening epening • Diver erted d 800 00,000 ,000 cubi bic c yards rds fr from disposal sposal areas eas • Pr Provides vides protect ected d roosting ting and nesting ting area a for migrato gratory y bi bird d sp species cies

  15. Savannah Harbor Brick Study • Performed ormed by Ge Georgia gia Tech h Scho hool ol of f Civi vil l and Envir Environment onmental al En Engineer ineering ng • Study dy was s to to ass ssess ss the he vi viabi bility lity of f producing ducing fired fi ed br bricks ks fr from dredge edge material terial fr from the he Sav avann annah ah Ri River er • Al Also so looked d at economic nomic feasi sibility bility of f br brick k pr produc oductio tion

  16. Savannah Harbor Brick Study • Bric icks ks were su successfully cessfully creat ated ed in the he lab b usi sing ng only y dr dredge dge materials terials (s (silt lt and d sa sand) d) with h minima nimal l additiv itives es • Economic onomic study dy compared pared bu building ding a br brick k fa factor ctory y on-sit site e to to sh shipping pping the he material terial to to an existing ting br brick k fa factor ory

  17. Savannah Harbor Brick Study • Economics onomics determined ermined be best option ion is s to to sh ship p material erial to to existing ting br brick k fac factories ories • Not t found d to to curre rrently ntly be be feasibl sible e due to to transpor ansportation ation costs ts to to fa factorie ories • May y be become me feasibl sible e if f transp spor ortation ation costs ts decrease crease or if f the here re is s an increased reased demand and for green een pr produ ducts cts

  18. Beneficial Use Challenges • Consis nsistent nt volume ume remo moval al • Envir Environment onmental al hu hurdle dles • Corps ps bu buy in

Recommend


More recommend