Mason County Transportation Advisory Panel Citizen Outreach TIP CAP 3/2018 Ver 20180325a 1
TIP CAP Transportation Improvement Program Citizens Advisory Panel WAC 136-15 and 16 Roads Safety Construction Maintenance Trails & Paths 2 TIP CAP 3/2018 Ver 20180325a
Tip Cap Citizen Public Works Community Members Transportation • Jerry Hauth, Public Works • Jeff Carey - Urban Growth Area Director Belfair/Allyn • John Huestis, County Engineer • Mark Carlson - Urban Growth Area City of • Loretta Swanson, Technical Shelton Services Manager • Mary Jo Cady - District 1 Rural Commissioner Neatherlin • Cyndi Ticknor, Road Maintenance Manager • Pete Butkus - District 2 Rural Commissioner Shutty • Kathy Cari • Don Pogreba - District 3 Rural Commissioner Drexler • Jack Johnson - Freight / Trucking • Vacant - Transit • Phil Wolff - Bicycle / Pedestrian • Vacant Rural Activity Center Hoodsport Union TIP CAP 3/2018 Ver 20180325a 3
Our Directive for TIP CAP • Recommendations 6 year Transportation Improvement Plan (TIP) Through a citizen advisory panel (CAP) • Ensure the financial viability of county road System • Review Reports on Bridges, Roads, Culverts, Trails & etc. • Address Urban Growth Areas: Belfair, Allyn and Shelton • Participate with County Comprehensive planning updates • Listen to citizen recommendations and concerns regarding transportation & review quarterly TIP CAP 3/2018 Ver 20180325a 4
State Roads vs County Roads TIP CAP 3/2018 Ver 20180325a 5
Transportation Overview • 620 miles of road • 64 Bridges • 3,300 Culverts Annual Maintenance Needs: 50 miles Chipseal 12 miles HMA Overlay TIP CAP 3/2018 Ver 20180325a 6
Culvert Facts 300 + Fish Barrier Culverts 29 Barriers removed Since year 2000 $325,000 average cost TIP CAP 3/2018 Ver 20180325a 7
Annual Construction Program NEED UPDATE 2018 = $4,258,900 TIP CAP 3/2018 Ver 20180325a 8
Budget 2007 2018 Annual Budget $19,300,000 $20,790,000 Diversion $403,000 $2,160,000 Number of Employees 69 60 • Revenue is essentially flat and diversion has increased. • Inflation and added regulations/processes have increased the cost of doing business . THE RESULT • Smarter ways of doing business, • Employee reduction of 9, and • Some service reduction. TIP CAP 3/2018 Ver 20180325a
Where to Find More Information TIP CAP 3/2018 Ver 20180325a 10
Rural Road Typical Design Section • 12 ft Paved Lanes • 4:1 Fill Slopes • 5 ft Paved Shoulders • 2:1 Cut Slopes TIP CAP 3/2018 Ver 20180325a 11
2018 Chip Seal Program
Pavement Maintenance – Chip Seal With Neighborhood Emphasis Program • • • • Matlock Brady Rd Anderson Rd Spencer Lake Rd Haven Ln • • • • Deckerville Rd Satsop Dr Woodside Pl Bartlett Pl • • • • Satsop Rd East Cloquallum Dr Evergreen Dr Mountain View Dr • • • Star Lake Dr Kamilche Dr Tahuya River Dr • Craig Sorger Ln • • • Beeville Rd Star Point Wy Snowcap Dr • Lake Christine Rd • • • Satsop Maple Glen Dr Prairie Loop Rd Rainbow Pl • Park Ln • • • Ford Loop Rd Blakely Dr Snowcap Pl • Rhody Ln • • • Buck Prairie Rd Fairway Dr Forest Creek Dr • Lakeview Ln • • • Loganberry Crt Arrowhead Dr Firwood Pl • Christine Ln • • • Salmonberry Dr Frosty Ln River Rd • Lake Dr • • • Fish Hatchery Rd Lost Lake Park Crt Woodview Ln • Frisken Y • • • Mary M Knight Rd Lost Lake Park Dr Creekside Pl • Bulb Farm Rd • • • Homer Adams Dr Lost Lake View Dr Steelhead Pl • Halberg Rd • • • Rhododendron Blvd Lost Lake Rd Haven Wy • Blueberry Ln • • • Matlock Deckerville Rd Gallagher Rd Haven Lake Dr • Blackberry Ln TIP CAP 3/2018 Ver 20180325a 13
Types of Pavement Preservation (Surfacing) Belfair Tahuya Road Belfair Pavement Overlay Pickering Road Chip Seal Elfendahl Pass Belfair TIP CAP 3/2018 Ver 20180325a 14
Pavement Preservation Chip Seal vs. Hot Mix Asphalt Overlay Chip Seal Application HMA Overlay Application http://www.co.mason.wa.us/public-works/chip-seal-program.php TIP CAP 3/2018 Ver 20180325a 15
Past Project - Clifton Lane Sidewalk • 450’ Section of Sidewalk installed along Clifton Ln • Connected the MTA Bus Stop to SR 3 TIP CAP 3/2018 Ver 20180325a 16
Past Project – Mason Benson HMA Overlay • HMA Overlay from SR 3 to Trails Rd • 2.5 Miles • 2” Overlay TIP CAP 3/2018 Ver 20180325a 17
Past Project – Little Mission Culvert Replaced undersized culvert with 18’ wide concrete box culvert on North Shore Rd TIP CAP 3/2018 Ver 20180325a 18
Future Project – Old Belfair Hwy Sidewalk New Sidewalk Location TIP CAP 3/2018 Ver 20180325a 19
Future WSDOT Project – Belfair Bypass (Freight Corridor) WSDOT Schedule Design – July 2019-July 2022 Right of Way – August 2020-June 2022 Construction – July 2022-March 2025 TIP CAP 3/2018 Ver 20180325a 20
Future Project? Belfair Bypass Connection Romance Hill Planned bypass alignment…. TIP CAP 3/2018 Ver 20180325a 21
Future Project – Trails Road Slide • Currently monitoring the slide and maintaining the roadway cracks • Design and Construction scheduled for 2019 • Alternate route / Rasor road to Possibly Hwy 3 TIP CAP 3/2018 Ver 20180325a 22
Future Projects – 2018 Matlock Brady Road TIP CAP 3/2018 Ver 20180325a 23
Future Projects - Intersection Safety • Possible Highway Safety Improvement Program (HSIP) Grant Funding available for Intersection Safety Projects around the County Mason Lake/ Mason Benson/Trails Intersection TIP CAP 3/2018 Ver 20180325a 24
Road Bicycle - Nice Grapeview Loop Chipped Spring 2017 – smaller chip / seal and not chipping shoulder turned out well - Thanks TIP CAP 3/2018 Ver 20180325a 25
Road Bicycle Trails Road Mason Lake Thurston County TIP CAP 3/2018 Ver 20180325a 26
Road Bicycle Tourism Several road bike events a year and cross county riders TIP CAP 3/2018 Ver 20180325a 27
Road Bicycle Tourism 230 Total participants 4 or 5 races per year TIP CAP 3/2018 Ver 20180325a 28
29 TIP CAP 3/2018 Ver 20180325a