Low Impact Focus Group Monthly Meeting September 19, 2017
Opening Comments This meeting is being recorded All lines are open in order to facilitate discussion Please mute your line when not speaking Please do not put this call on hold – many systems play music on hold • If you need to answer another call, please disconnect and call back in 2 Forward Together • ReliabilityFirst
Announcements NERC’s Antitrust Guidelines are available at: • http://www.nerc.com/pa/Stand/Resources/Documents/NER C_Antitrust_Compliances_Guidelines.pdf This is a public call. RF cannot pre-screen the attendees. 3 Forward Together • ReliabilityFirst
Mailing List ciplifg@lists.rfirst.org This list is intended as a discussion forum. We will need to see how well this works with more than 150 members. List changes, such as additions or removals, should be sent to: lew.folkerth@rfirst.org 4 Forward Together • ReliabilityFirst
Special Topics Meetings A survey is planned for the near future. A link will be send to the CIPLIFG list. Possible Topics: • CIP-101 Low Impact Introduction • Electronic Access Controls • Physical Access Controls • Tips and Techniques for Compliance Documentation • Compliance Evidence • What Happens During an Audit? • In-depth discussion of emerging Standards 5 Forward Together • ReliabilityFirst
Standards Update CIP-002-6 Draft 1 • Posted for formal comment through October 30 • Ballot pool forming through October 13 • Initial ballot October 20-30 6 Forward Together • ReliabilityFirst
Standards Update CIP-002-6 Draft 1 Change Summary • Housekeeping changes ‒ “CIP-002-5.1” to “CIP-002-6” ‒ Note: The approved Interpretation has not been incorporated into this revision, so the proper designation of these Standards is “CIP-002-5.1a” and CIP-002-6a” ‒ The NERC Glossary term “Special Protection System” is obsolete and has been removed ‒ Applicability function 4.1.5, “Interchange Coordinator or Interchange Authority,” is obsolete and has been removed ‒ Section 5.0, “Effective Dates,” references the Implementation Plan ‒ [R1.v] “Special Protection Systems” changed to “Remedial Action Schemes” ‒ Section “E. Interpretations” added referencing Appendix 1 7 Forward Together • ReliabilityFirst
Standards Update CIP-002-6 Draft 1 Change Summary • Substantive changes: Impact Rating Criterion 2.12 ‒ CIP-002-5.1a • Each Control Center or backup Control Center used to perform the functional obligations of the Transmission Operator not included in High Impact Rating (H), above. ‒ CIP-002-6a • Control Centers or backup Control Centers, not included in High Impact Rating (H) above, that monitor and control BES Transmission Lines with an "aggregate weighted value" exceeding 6000 according to the table below. The "aggregate weighted value“ for a Control Center or backup Control Center is determined by summing the "weight value per line" shown in the table below for each BES Transmission Line monitored and controlled by the Control Center or backup Control Center. 8 Forward Together • ReliabilityFirst
Standards Update CIP-002-6 Draft 1 Change Summary 2.12. Control Centers or backup Control Centers, not included in High Impact Rating (H) above, that monitor and control BES Transmission Lines with an "aggregate weighted value" exceeding 6000 according to the table below. The "aggregate weighted value“ for a Control Center or backup Control Center is determined by summing the "weight value per line" shown in the table below for each BES Transmission Line monitored and controlled by the Control Center or backup Control Center. Voltage Value of a Line Weight Value per Line less than 100 kV (not applicable) (not applicable) 100 kV to 199 kV 250 200 kV to 299 kV 700 300 kV to 499 kV 1300 500 kV and above 0 9 Forward Together • ReliabilityFirst
Standards Update CIP-002-6 Implementation Plan • CIP-002-6 Effective Date: On the effective date of the order approving CIP-002-6, or 60 days after BoT approval where governmental approval is not required • Planned Changes – Initial Performance ‒ Initial performance of periodic requirements shall occur by the end of the specified period following the update of the identification and categorization of the affected BES Cyber System. For example, initial performance shall be within 15 months following the update of the identification and categorization of the affected BES Cyber System for requirements that must be performed at least once every 15 calendar months. 10 Forward Together • ReliabilityFirst
Standards Update CIP-002-6 RSAW • No significant changes expected 11 Forward Together • ReliabilityFirst
Future Meetings Next conference call (WebEx): • Tuesday, October 24, 2017 [note date change] at 11:00AM EDT 12 Forward Together • ReliabilityFirst
Questions & Answers Forward Together ReliabilityFirst 13 Forward Together • ReliabilityFirst