Los Alamos Irradiation Readiness Instrumentation Meeting - 29 Jan 2016 Timon Heim - LBL UNIVERSITY OF 1 CALIFORNIA
Plan • Irradiate 6 FE65_P2 chips to 150, 350 and 500 Mrad → 4 chips in the beam at the same time • Chips powered and clocked during irradiation • Monitor analog and digital current, as well as Iref voltage of one chip up to 500 Mrad • Irradiate one FEAST -MP board to 150 Mrad Timon Heim 2 Instrumentation Meeting
Setup USB to CAT5 GPIB USB USB Computer 2 Ch Power 2 Ch Power Supply Supply V V Source Meter 1 x 4 pin Molex 1.2 3.3 Irrad Board: Cave CR 40 MHz Osc Level Shifter Iref generation CLK CNFG CLK DATA CLK BX 6 x Lemo VDDA VDDD Iref 4x SCC Slot Timon Heim 3 Instrumentation Meeting
Setup USB to CAT5 GPIB USB USB Computer 2 Ch Power 2 Ch Power Supply Supply V V Source Meter 1 x 4 pin Molex 1.2 3.3 Irrad Board: Cave CR 40 MHz Osc Level Shifter Iref generation CLK CNFG CLK DATA CLK BX 6 x Lemo VDDA VDDD Iref 4x SCC Slot Timon Heim 4 Instrumentation Meeting
Setup USB to CAT5 GPIB USB USB Computer 2 Ch Power 2 Ch Power Supply Supply V V Source Meter 1 x 4 pin Molex 1.2 3.3 Irrad Board: Cave CR 40 MHz Osc Level Shifter Iref generation CLK CNFG CLK DATA CLK BX 6 x Lemo VDDA VDDD Iref 4x SCC Slot Timon Heim 5 Instrumentation Meeting
Setup USB to CAT5 GPIB USB USB Computer 2 Ch Power 2 Ch Power Supply Supply V V Source Meter 1 x 4 pin Molex 1.2 3.3 Irrad Board: Cave CR 40 MHz Osc Level Shifter Iref generation CLK CNFG CLK DATA CLK BX 6 x Lemo VDDA VDDD Iref 4x SCC Slot Timon Heim 6 Instrumentation Meeting
FEAST -MP High Quality Breakout 1 Ohm Load FEAST -MP board Timon Heim 7 Meeting Name
Recommend
More recommend