Locally Preferred Alternative PRESENTATI O N Study Overview - PowerPoint PPT Presentation

Locally Preferred Alternative PRESENTATI O N Study Overview Existing Conditions A proposed Locally Preferred Alternative (The details) 2 slide PURPOSE STAT EMENT The purpose of the project is to implement multi-modal transportation


  1. Locally Preferred Alternative

  2. PRESENTATI O N Study Overview Existing Conditions A proposed Locally Preferred Alternative (The details) 2 slide

  3. PURPOSE STAT EMENT The purpose of the project is to implement multi-modal transportation improvements that enhance mobility and safety along the Harmony Road Corridor. Improvements will support local and regional travel needs, land uses, economic health and environmental stewardship goals. 3 slide

  4. Broad Range of Ideas Tier 1 Alternatives Fatal Flaw Analysis Tier 1 Screening Most Promising Tier 2 Alternatives Vision Phasing Tier 2 Screening Cost Triple Bottom Line Public Boards / Commissions Refinement City Council Locally Preferred Alternative 4 slide

  5. H I S TO RY Harmony Road History Harmony Farm Becomes Corridor Plan Road State Hwy Harmony Road transferred to City 1950 1960 1970 1980 1990 2000 2010 6-lanes I-25 HP Builds to Boardwalk Built Facility Harmony Bicycle Plan 5 slide

  6. $60,000 2010 $5,500,000 2011 $6,000,000 2008 Harmony Rd Timberline Rd College Ave Taft Hill Rd Lemay Ave Ziegler Rd Shields St $8,000,000 2009 $3,100,000 2012 $2,200,000 2010

  7. Source: NFRMPO Travel Demand Model, as modified for Fort Collins Transportation Master Plan 7 slide

  8. Source: NFRMPO Travel Demand Model, as modified for Fort Collins Transportation Master Plan 8 slide

  9. 9 slide

  10. 10 slide

  11. Rout ute e 1 about bout 300 0 on and offs fs Rout ute e 16 & 17 over 300 0 on and offs fs combine mbined 11 slide

  12. Existing ting Bus St Stop 12 slide

  13. Existing ting Bus St Stop 13 slide

  14. Wa Walking king Co Cond nditio itions ns 14 slide

  15. Walking Conditions on Harmony Road 15 slide

  16. 16 slide

  17. 17 slide

  18. 18 slide

  19. 19 slide

  20. Proposed Locally Preferred Alternative Roadway & Intersection Improvements Transit Service Bicycle Facilities Pedestrian Facilities 20 slide

  21. Transit Transit Bicycle and Roadway Alternative Infrastructure Service Pedestrian Infrastructure on Harmony on Harmony Accommodation • Committed FY14 Transfort No Action Existing Existing Existing service modifications • Widen Harmony Transportation (Boardwalk to College) • Expanded Local Bus service System Management to 6 Lanes Existing (Phase 1 of TSOP) FRCC to Options: (TSM) • Intersection HTC improvements • Bike lanes + detached sidewalks • Queue jumps • Enhanced bus service Enhanced Bus Same as TSM at major (FRCC to HTC) • Buffered bike lanes + intersections • Increased frequency detached sidewalks • Cycle tracks + detached • Outside lanes for • BRT service (FRCC to HTC) sidewalks End to End BRT/HOV Same as TSM bus/HOV (one in • Increased frequency each direction) • Shared use paths • Outside lanes for • BRT service interlined with Interlined BRT/HOV Same as TSM bus/HOV (one in Mason corridor each direction) • Increased frequency 21 slide

  22. Widen en Harmony mony to 6 lanes es Widen en Timb mberline rline to 6 lanes es Widen en Colle llege ge to 6 lanes es Impr prove ove interse rsections ctions with h turn lane nes 22 slide

  23. Harmony rmony Transfe nsfer r Center ter Horsetooth Harmony ony Rout ute Harmony Rd. Runs every ry 20 minutes tes Boardwalk Timberline Lady Moon College Shields Ziegler Lemay South uth Tran ansit sit Cent nter er 23 slide

  24. 24 slide

  25. 25 slide

  26. 26 slide

  27. San Franci ncisco sco Seatt attle le 27 slide

  28. 28 Shields slide Mason Trail College Pedestr Boardwalk strian Lemay ian and bicycle cycle Under or overpa Power Trail Timberline Ziegler pass Harmony Rd. Horsetooth sses es Lady Moon

  29. 29 slide

  30. Proposed Locally Preferred Alternative Widen Harmony (Boardwalk to College) to 6 Lanes & Road Intersection improvements Enhanced bus service with queue jumps at major Bus intersections, increased frequency with improved bus plazas Fill in missing sidewalks, pursue over or Walk underpasses and improve crossings at signalized intersections Buffered bike lanes with green marking, along with Bike detached multi-use paths 30 slide

  31. Next Steps Conduct final public outreach Develop conceptual cost estimates Develop implementation plan (phasing and funding) Complete ETC Master Plan report City Council this Summer for Adoption 31 slide

  32. For More Information Project Website: fcgov.com/harmony Contact: Aaron Iverson aiverson@fcgov.com or 970-416-2643 32 slide