KNP Waste Recycle Initiative Waste Operations and Recycling History From 1990 till 2013
Skukuza waste site prior to 1992
Holding cages at Picnic sites and Small camps
Skukuza waste site 2002
Glass recycle unit
Operations till October2012
Aerial photo of Skukuza waste site 2008
Incinerators with the ash pit
Site visit of DEA and Mbombela waste initiative group 2007
Smoke during incineration process
Solid Waste Management Strategy 1. Maximize recycling of solid waste (Currently ± 80%) 1. Tin 2. Glass 3. Plastic 2. Centralize recycling operations per region 1. Maximize economy of scale in operations 2. World class Mechanical Recycling Facility (MRF) 3. Optimize income from recycle waste
Baboon-proof waste bins at all facilities south of the Olifants River
None recyclable belt
Recyclable belt
Glass crusher
Deposit crushed glass directly into bags
Tin bailer
Plastic bailer
Baboon-proof storing cages None recyclable waste Recyclable waste
Operation in process
Waste storing cages at all rest camps south of the Olifants river
Solid Waste Management Strategy • Plans for the future • Install an Digester and or Gasification plant • Phase out the incinerators
Recommend
More recommend