imca
play

IMCA Ivan van Winsen Engineering with the Human Factor in the Loop - PowerPoint PPT Presentation

Heerema Simulation Center IMCA Ivan van Winsen Engineering with the Human Factor in the Loop September-2018 HMC Offshore Construction Contractor OIL & GAS REMOVAL RENEWABLES Fixed platforms Transformer platforms Removal


  1. Heerema Simulation Center IMCA Ivan van Winsen Engineering with the Human Factor in the Loop September-2018

  2. HMC Offshore Construction Contractor OIL & GAS REMOVAL RENEWABLES    Fixed platforms Transformer platforms Removal & Disposal of  Float-overs platforms (HVAC & HVDC)   TLPs Turbines and Foundations

  3. HMC Assets 3

  4. The Heerema Simulation Center Simulation Area (floor 2) Man on Deck Station 2 Crane Simulator 1 & 2 • Bridge / DP Stations Instructor room • Ballast Room • 2x Deck Rooms • 2x Crane Domes Float-over / Anchoring • Float-Over / Winch Station Ballast Station • Instructor Room Bridge Simulator Man on Deck Station 1

  5. Project Simulation Scope: • Module installation on floating hull Objective: • Cost saving • Determine impact loads based on operator skills • Optimize clearance between pedestal crane 7

  6. Approach Engineer with the human factor in the loop Engineering preparation Simulation with Offshore Crew Post-Process Results

  7. Results Engineer with the human factor in the loop Lower Design Loads for Supports Platform Crane Pre-trim Hull DP-behavior was stable

  8. Concl clusion Engineer with the human factor in the loop Safer installation Reduced cost Efficient alignment Better overall understanding and procedure optimization

  9. Thank You Questions?

Recommend


More recommend