I-71/I-270/Stringtown Road Interchanges PUBLIC INFORMATION MEETING FRA ‐ 71 ‐ 7.45, PID 92615 May 1, 2014
Project Background Project Goals: • Improve safety • Reduce congestion Contributing factors: • Traffic volumes will exceed capacity • Weaving between I ‐ 270 & Stringtown • Weaving on the ramps at the I ‐ 71/I ‐ 270 interchange • Backup on I ‐ 71 at Stringtown
I-71/I-270 Interchange Existing Conditions
I-71/I-270 Interchange Fully Directional
I-71/I-270 Interchange Double Flyover
I-71/I-270 Interchange Single Flyover
I-71/I-270 Interchange Evaluation Matrix
I-71 between I-270 and Stringtown Road Existing Conditions
I-71 between I-270 and Stringtown Road Express Lanes
I-71 between I-270 and Stringtown Road Evaluation Matrix
I-71/Stringtown Road Interchange Existing Conditions
I-71/Stringtown Road Interchange Partial Cloverleaf (Modified Parclo-A)
I-71/Stringtown Road Interchange Modified Diamond
I-71/Stringtown Road Interchange Evaluation Matrix
Next Steps • Complete environmental documentation – Fall 2014 • Stringtown Road east of I ‐ 71 construction – Summer 2015 • I ‐ 71/I ‐ 270/Stringtown Road interchange design – 2015/2016 • Construction date to be determined based on funding
Stations • Station 1 – Sign ‐ In Table & Study Area • Station 2 – I ‐ 71/I ‐ 270 Interchange • Station 3 – I ‐ 71 between I ‐ 270 & Stringtown Road • Station 4 – I ‐ 71/Stringtown Road Interchange • Station 5 – Information on Creeks, Streams, & Noise • Station 6 – Comment Forms Comment forms are available at the sign ‐ in table & comment table. You may submit your comments today or mail to the address on the back. All comments must be received by May 15, 2014 For more information, please visit www.transportation.ohio.gov/dist6