Hollands Farm Liaison Group Meeting 3 Powerpoint Slides Liaison Group Meeting 3 Draft Development Brief Chair: Cllr Dominic Barnes, South West Chilterns Community Board Lead Officer: Charlotte Morris, Principal Planning Officer Chris


  1. Hollands Farm Liaison Group Meeting 3 – Powerpoint Slides Liaison Group Meeting 3 – Draft Development Brief Chair: Cllr Dominic Barnes, South West Chilterns Community Board Lead Officer: Charlotte Morris, Principal Planning Officer Chris Kennett: Natural Environment & Urban Design Officer Chris Steuart: Major Development Team Leader Emily Hadley: Planning Policy Officer Agenda 1. Introductions (10mins) 2. Progress since March (15mins) 3. Development Framework (1hr)  Access and movement  Green infrastructure and open space  Heritage and conservation  Infrastructure - Onsite + off-site requirements 5. Appropriate Assessment + Sustainability Appraisal (20 mins) 6. Next steps (5mins) 7. AOB (15mins) Progress to date  First draft of Development Brief o Internal consultation with specialists o Further refinement of infrastructure requirements o Development framework plan  Completed Draft Appropriate Assessment  Completed Draft Sustainability Appraisal  Legal challenge update  Programme going forward

  2. Site analysis – Constraints and Opportunities

  3. Access and movement  Existing public right of way  Current access Hedsor Road + Princes Road  Link road requirement including bus route  Need for wider connectivity o Former orchard o Hedsor Road o Wessex Road Employment Area o Town Centre o Connect to existing PRoWs  Location of primary school

  4. Green infrastructure and open space  Requirement to be landscape led o use of buffers o building on existing green o corridors – former orchard, o - maintain hedgerows + mature trees  Open space and play provision  Incorporation of SUDs  Incorporating existing wildlife corridors

  5. Heritage and Conservation  Conservation Area + listed buildings  Cores End Roundabout  Design of Hedsor Road junction  Relationship with properties at Hedsor Road

  6. Development Framework  Landscape-led approach  Green space focus for setting  Connected green infrastructure  Use of generous green corridors as the basis for a footpath/cycle network  Respond to the different characters of the adjoining areas  Use landscaping to screen industrial + business park  Maintain separation from Hedsor Road properties through tree belt buffer  Respond to views across the site from public rights of way  Respond to the sites topography  Retain and protect existing mature trees

  7. Infrastructure Requirements Onsite  Link road + bus route  1 form primary school  Strategic open space, including the sports pitches, MUGA, Teen play facility, NEAP and allotments Off site  Junction improvements  Provide and enhance footpath and cycle links to the village centre  Contributions to facilitate public access to the former orchard  Contributions towards improving access and upgrading the bridleway on the disused former Bourne End to High Wycombe railway line  S106 contributions to mitigate recreational impacts at Burnham Beeches SAC

  8. Appropriate Assessment and Sustainability Appraisal Next Steps • Finalise draft Development Brief • Commence public consultation End of November • Early 2021 finalise and adopt Development Brief as a Supplementary Planning Document Consultation methods • Online survey • Leaflet drop • Social media • Press release AOB?